GRUPO 8 - Feature #5019: Asignacion de cargos Feature #5019: Asignacion de cargos

Project: GRUPO 8
Status: New
Start date: 09/26/2025
Due date: 09/29/2025
Assignee: Victor Breems
Priority: High
GRUPO 1 - Feature #5114: Pruebas de codigo. Feature #5114: Pruebas de codigo.

Project: GRUPO 1
Status: Resolved
Start date: 09/29/2025
Due date: 10/17/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 3 - Feature #4974: Ensamble de Prototipo Feature #4974: Ensamble de Prototipo

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 11/14/2025
Assignee:
Priority: High
GRUPO 3 - Feature #5439: Ensamble de Receptores de b... Feature #5439: Ensamble de Receptores de bloques.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Camilo Geraldo
Priority: Normal
GRUPO 3 - Feature #5440: Ensamble del motor del prot... Feature #5440: Ensamble del motor del prototipo.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Ignacio Cuevas
Priority: Normal
GRUPO 3 - Feature #5442: Ensamble y Modificación de ... Feature #5442: Ensamble y Modificación de Brazos Giratorios.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Maximiliano Burgos
Priority: Normal
GRUPO 3 - Feature #5443: Modificación y Ensamble de ... Feature #5443: Modificación y Ensamble de pistón giratorio.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Jose Quispe
Priority: Normal
GRUPO 3 - Feature #5646: Bitácora semana 2 Feature #5646: Bitácora semana 2

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5942: Planificar primer diseño ba... Feature #5942: Planificar primer diseño base del robot

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 4 - Feature #4966: Construcción versión 1 Feature #4966: Construcción versión 1

Project: GRUPO 4
Status: New
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Daniel Flores
Priority: High
GRUPO 5 - Feature #5136: Montaje de la base estructu... Feature #5136: Montaje de la base estructural

Project: GRUPO 5
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Franco Churata
Priority: Normal
GRUPO 5 - Feature #5204: Ensamblaje Feature #5204: Ensamblaje

Project: GRUPO 5
Status: Resolved
Start date: 09/29/2025
Due date: 10/06/2025
Assignee: Brayan Palacios
Priority: Normal
GRUPO 5 - Feature #5238: Montaje del brazo Feature #5238: Montaje del brazo

Project: GRUPO 5
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #4902: Construcción del robot Feature #4902: Construcción del robot

Project: GRUPO 6
Status: Resolved
Start date: 09/29/2025
Due date: 10/17/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 6 - Feature #4904: Prueba de diseño del robot Feature #4904: Prueba de diseño del robot

Project: GRUPO 6
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 6 - Feature #5036: Completar bitácora N° 2 Feature #5036: Completar bitácora N° 2

Project: GRUPO 6
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Ruth Huanca
Priority: Normal

30

1

GRUPO 1 - Feature #4963: Primer ensamblaje del robot... Feature #4963: Primer ensamblaje del robot prototipo

Project: GRUPO 1
Status: Resolved
Start date: 09/26/2025
Due date: 10/01/2025
Assignee:
Priority: Normal
GRUPO 1 - Feature #5129: Estudio de diferentes robot... Feature #5129: Estudio de diferentes robots en la web.

Project: GRUPO 1
Status: Resolved
Start date: 09/26/2025
Due date: 10/01/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5439: Ensamble de Receptores de b... Feature #5439: Ensamble de Receptores de bloques.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Camilo Geraldo
Priority: Normal
GRUPO 3 - Feature #5440: Ensamble del motor del prot... Feature #5440: Ensamble del motor del prototipo.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Ignacio Cuevas
Priority: Normal
GRUPO 3 - Feature #5442: Ensamble y Modificación de ... Feature #5442: Ensamble y Modificación de Brazos Giratorios.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Maximiliano Burgos
Priority: Normal
GRUPO 3 - Feature #5941: Introducir y Explorar en el... Feature #5941: Introducir y Explorar en el set de LEGO Spike Prime

Project: GRUPO 3
Status: New
Start date: 09/27/2025
Due date: 10/01/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5136: Montaje de la base estructu... Feature #5136: Montaje de la base estructural

Project: GRUPO 5
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee: Franco Churata
Priority: Normal
GRUPO 5 - Feature #5238: Montaje del brazo Feature #5238: Montaje del brazo

Project: GRUPO 5
Status: Resolved
Start date: 09/29/2025
Due date: 10/01/2025
Assignee:
Priority: Normal
GRUPO 11 - Feature #5156: Investigación bibliotecas Feature #5156: Investigación bibliotecas

Project: GRUPO 11
Status: Resolved
Start date: 09/26/2025
Due date: 10/01/2025
Assignee: Javier Echeverria
Priority: High
GRUPO 1 - Feature #5109: Optimización del Prototipo Feature #5109: Optimización del Prototipo

Project: GRUPO 1
Status: Resolved
Start date: 10/01/2025
Due date: 10/22/2025
Assignee: Alex Campillay
Priority: Normal
GRUPO 1 - Feature #5121: Ensamblaje del 2do Prototipo Feature #5121: Ensamblaje del 2do Prototipo

Project: GRUPO 1
Status: Resolved
Start date: 10/01/2025
Due date: 10/31/2025
Assignee: Alex Campillay
Priority: High
GRUPO 3 - Feature #5004: Ajustes a diseño del protot... Feature #5004: Ajustes a diseño del prototipo.

Project: GRUPO 3
Status: Resolved
Start date: 10/01/2025
Due date: 10/10/2025
Assignee: Maximiliano Burgos
Priority: Normal
GRUPO 5 - Feature #5008: Codificación Feature #5008: Codificación

Project: GRUPO 5
Status: Resolved
Start date: 10/01/2025
Due date: 10/20/2025
Assignee: Joaquin Quezada
Priority: High
GRUPO 5 - Feature #5137: Conexión de cables y compon... Feature #5137: Conexión de cables y componentes eléctricos.

Project: GRUPO 5
Status: Resolved
Start date: 10/01/2025
Due date: 10/02/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5141: Familiarización con el Soft... Feature #5141: Familiarización con el Software

Project: GRUPO 5
Status: Resolved
Start date: 10/01/2025
Due date: 10/02/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #4864: Definir objetivos específicos Feature #4864: Definir objetivos específicos

Project: GRUPO 6
Status: Resolved
Start date: 10/01/2025
Due date: 10/03/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 11 - Feature #5157: Familiarización con el código Feature #5157: Familiarización con el código

Project: GRUPO 11
Status: Resolved
Start date: 10/01/2025
Due date: 10/05/2025
Assignee: Javier Echeverria
Priority: High

2

GRUPO 7 - Feature #5946: Reunión inicial y definició... Feature #5946: Reunión inicial y definición del proyecto

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/02/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5948: Asignación de roles del equipo Feature #5948: Asignación de roles del equipo

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/02/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5137: Conexión de cables y compon... Feature #5137: Conexión de cables y componentes eléctricos.

Project: GRUPO 5
Status: Resolved
Start date: 10/01/2025
Due date: 10/02/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5141: Familiarización con el Soft... Feature #5141: Familiarización con el Software

Project: GRUPO 5
Status: Resolved
Start date: 10/01/2025
Due date: 10/02/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5945: PLANIFICACIÓN Y DISEÑO INICIAL Feature #5945: PLANIFICACIÓN Y DISEÑO INICIAL

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5947: Investigación del kit Lego ... Feature #5947: Investigación del kit Lego Spike Prime

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5950: CONSTRUCCIÓN DEL ROBOT Feature #5950: CONSTRUCCIÓN DEL ROBOT

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/23/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5963: DOCUMENTACIÓN Y ENTREGA Feature #5963: DOCUMENTACIÓN Y ENTREGA

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 12/30/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5964: Desarrollo de bitácoras sem... Feature #5964: Desarrollo de bitácoras semanales

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 12/29/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5969: Construcción de la base del... Feature #5969: Construcción de la base del robot

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #4835: Primer modelo del robot Feature #4835: Primer modelo del robot

Project: GRUPO 8
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 8 - Feature #4838: Avance del primer modelo Feature #4838: Avance del primer modelo

Project: GRUPO 8
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee: Gabriel Delgado
Priority: Normal
GRUPO 8 - Feature #4846: Término del primer modelo d... Feature #4846: Término del primer modelo del robot

Project: GRUPO 8
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee: Sebastian Cahuachia
Priority: Normal
GRUPO 9 - Feature #5243: Construir brazo del robot Feature #5243: Construir brazo del robot

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5244: Construir garra del robot Feature #5244: Construir garra del robot

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5247: Ensamblar estructura Base Feature #5247: Ensamblar estructura Base

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee: Benjamin Sucso
Priority: Normal
GRUPO 9 - Feature #5248: Probar giro de 360° Feature #5248: Probar giro de 360°

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5249: Probar movimiento vertical ... Feature #5249: Probar movimiento vertical del brazo robótico

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee: Matias Agriano
Priority: Normal
GRUPO 9 - Feature #5250: Probar el agarre y liberaci... Feature #5250: Probar el agarre y liberación de la garra

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5251: Redactar el Informe 1 Feature #5251: Redactar el Informe 1

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/17/2025
Assignee: Dylan Calderon
Priority: Normal
GRUPO 10 - Feature #4884: Testeando y creando funcion... Feature #4884: Testeando y creando funciones para el robot

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/09/2025
Assignee:
Priority: High
GRUPO 10 - Feature #4956: Desarrollo en libreria Pybrick Feature #4956: Desarrollo en libreria Pybrick

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #4958: Desarrollo de la estructura... Feature #4958: Desarrollo de la estructura funcional y algortimica

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/10/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #6120: INFORMES Y EXPOSICIONES Feature #6120: INFORMES Y EXPOSICIONES

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 12/30/2025
Assignee:
Priority: High
GRUPO 10 - Feature #6126: Desarrollo del informe 1 Feature #6126: Desarrollo del informe 1

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5140: Programación de movimientos... Feature #5140: Programación de movimientos simples con el entorno de LEGO

Project: GRUPO 5
Status: Resolved
Start date: 10/02/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5233: Pruebas de agarre con el Robot Feature #5233: Pruebas de agarre con el Robot

Project: GRUPO 5
Status: Resolved
Start date: 10/02/2025
Due date: 10/06/2025
Assignee:
Priority: Normal

3

GRUPO 1 - Feature #4960: Pre-codificacion Feature #4960: Pre-codificacion

Project: GRUPO 1
Status: Resolved
Start date: 09/24/2025
Due date: 10/03/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 3 - Feature #5443: Modificación y Ensamble de ... Feature #5443: Modificación y Ensamble de pistón giratorio.

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Jose Quispe
Priority: Normal
GRUPO 3 - Feature #5646: Bitácora semana 2 Feature #5646: Bitácora semana 2

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5942: Planificar primer diseño ba... Feature #5942: Planificar primer diseño base del robot

Project: GRUPO 3
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5955: Diseño conceptual del robot Feature #5955: Diseño conceptual del robot

Project: GRUPO 7
Status: New
Start date: 10/03/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5969: Construcción de la base del... Feature #5969: Construcción de la base del robot

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #4834: Preparación para el proyecto Feature #4834: Preparación para el proyecto

Project: GRUPO 8
Status: New
Start date: 09/26/2025
Due date: 10/03/2025
Assignee: Gabriel Delgado
Priority: Normal
GRUPO 8 - Feature #4835: Primer modelo del robot Feature #4835: Primer modelo del robot

Project: GRUPO 8
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 8 - Feature #4838: Avance del primer modelo Feature #4838: Avance del primer modelo

Project: GRUPO 8
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee: Gabriel Delgado
Priority: Normal
GRUPO 8 - Feature #4840: Interfaz del robot Feature #4840: Interfaz del robot

Project: GRUPO 8
Status: New
Start date: 10/03/2025
Due date: 10/03/2025
Assignee: Willy Cruz
Priority: Normal
GRUPO 8 - Feature #4841: Avance Informe Feature #4841: Avance Informe

Project: GRUPO 8
Status: New
Start date: 10/03/2025
Due date: 10/03/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 8 - Feature #4846: Término del primer modelo d... Feature #4846: Término del primer modelo del robot

Project: GRUPO 8
Status: New
Start date: 10/02/2025
Due date: 10/03/2025
Assignee: Sebastian Cahuachia
Priority: Normal
GRUPO 8 - Feature #5047: Prototipo del robot Feature #5047: Prototipo del robot

Project: GRUPO 8
Status: New
Start date: 09/27/2025
Due date: 10/03/2025
Assignee: Gabriel Delgado
Priority: High
GRUPO 10 - Feature #4952: Bitacora semana 2 Feature #4952: Bitacora semana 2

Project: GRUPO 10
Status: New
Start date: 10/03/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #4957: Conteo de set LEGO spike Pr... Feature #4957: Conteo de set LEGO spike Prime.

Project: GRUPO 10
Status: New
Start date: 09/25/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #6111: Configuracion del HUB Feature #6111: Configuracion del HUB

Project: GRUPO 10
Status: New
Start date: 09/26/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #6137: Termino de construccion del... Feature #6137: Termino de construccion del robot

Project: GRUPO 10
Status: New
Start date: 09/26/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 4 - Feature #4891: Construcción del Robot Feature #4891: Construcción del Robot

Project: GRUPO 4
Status: New
Start date: 09/22/2025
Due date: 10/03/2025
Assignee: Daniel Flores
Priority: High
GRUPO 4 - Feature #4966: Construcción versión 1 Feature #4966: Construcción versión 1

Project: GRUPO 4
Status: New
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Daniel Flores
Priority: High
GRUPO 5 - Feature #5140: Programación de movimientos... Feature #5140: Programación de movimientos simples con el entorno de LEGO

Project: GRUPO 5
Status: Resolved
Start date: 10/02/2025
Due date: 10/03/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #4862: Definir objetivos Feature #4862: Definir objetivos

Project: GRUPO 6
Status: Resolved
Start date: 09/26/2025
Due date: 10/03/2025
Assignee: Abraham Canaviri
Priority: Normal
GRUPO 6 - Feature #4864: Definir objetivos específicos Feature #4864: Definir objetivos específicos

Project: GRUPO 6
Status: Resolved
Start date: 10/01/2025
Due date: 10/03/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 6 - Feature #4904: Prueba de diseño del robot Feature #4904: Prueba de diseño del robot

Project: GRUPO 6
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 6 - Feature #5036: Completar bitácora N° 2 Feature #5036: Completar bitácora N° 2

Project: GRUPO 6
Status: Resolved
Start date: 09/29/2025
Due date: 10/03/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 11 - Feature #5150: Investigación y familiariza... Feature #5150: Investigación y familiarización con el Kit de LEGO

Project: GRUPO 11
Status: Resolved
Start date: 09/26/2025
Due date: 10/03/2025
Assignee: José Terrazas
Priority: High
GRUPO 1 - Feature #5110: Bitácoras Feature #5110: Bitácoras

Project: GRUPO 1
Status: Resolved
Start date: 10/03/2025
Due date: 11/28/2025
Assignee: Marcos Caldas
Priority: Normal
GRUPO 3 - Feature #4851: Revisión y prueba de mecani... Feature #4851: Revisión y prueba de mecanismo de empuje de bloques.

Project: GRUPO 3
Status: Feedback
Start date: 10/03/2025
Due date: 10/06/2025
Assignee: Camilo Geraldo
Priority: High
GRUPO 11 - Feature #5151: Construcción base del Robot Feature #5151: Construcción base del Robot

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/09/2025
Assignee: José Terrazas
Priority: High
GRUPO 11 - Feature #5152: Construcción brazo del robot Feature #5152: Construcción brazo del robot

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/09/2025
Assignee: Alexander Pinto
Priority: Normal
GRUPO 11 - Feature #5153: Construcción garra del robot Feature #5153: Construcción garra del robot

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/10/2025
Assignee: Alexander Pinto
Priority: Normal
GRUPO 11 - Feature #5159: Actualización de software d... Feature #5159: Actualización de software del controlador LEGO

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/04/2025
Assignee: Javier Echeverria
Priority: Normal

4

GRUPO 11 - Feature #5159: Actualización de software d... Feature #5159: Actualización de software del controlador LEGO

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/04/2025
Assignee: Javier Echeverria
Priority: Normal
GRUPO 5 - Feature #5220: Codificación con Bloques Feature #5220: Codificación con Bloques

Project: GRUPO 5
Status: Resolved
Start date: 10/04/2025
Due date: 10/10/2025
Assignee: Joaquin Quezada
Priority: Normal
41

5

GRUPO 11 - Feature #5157: Familiarización con el código Feature #5157: Familiarización con el código

Project: GRUPO 11
Status: Resolved
Start date: 10/01/2025
Due date: 10/05/2025
Assignee: Javier Echeverria
Priority: High

6

GRUPO 3 - Feature #4851: Revisión y prueba de mecani... Feature #4851: Revisión y prueba de mecanismo de empuje de bloques.

Project: GRUPO 3
Status: Feedback
Start date: 10/03/2025
Due date: 10/06/2025
Assignee: Camilo Geraldo
Priority: High
GRUPO 5 - Feature #5204: Ensamblaje Feature #5204: Ensamblaje

Project: GRUPO 5
Status: Resolved
Start date: 09/29/2025
Due date: 10/06/2025
Assignee: Brayan Palacios
Priority: Normal
GRUPO 5 - Feature #5233: Pruebas de agarre con el Robot Feature #5233: Pruebas de agarre con el Robot

Project: GRUPO 5
Status: Resolved
Start date: 10/02/2025
Due date: 10/06/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5647: Bitácora semana 3 Feature #5647: Bitácora semana 3

Project: GRUPO 3
Status: Resolved
Start date: 10/06/2025
Due date: 10/10/2025
Assignee:
Priority: Normal
GRUPO 4 - Feature #4893: Codificacion y Programacion... Feature #4893: Codificacion y Programacion del Robot

Project: GRUPO 4
Status: New
Start date: 10/06/2025
Due date: 10/31/2025
Assignee: Daniel Flores
Priority: Urgent
GRUPO 4 - Feature #4972: Programación del robot Feature #4972: Programación del robot

Project: GRUPO 4
Status: New
Start date: 10/06/2025
Due date: 10/31/2025
Assignee: Daniel Flores
Priority: Urgent
GRUPO 4 - Feature #5033: Investigación Lib. Pybricksdev Feature #5033: Investigación Lib. Pybricksdev

Project: GRUPO 4
Status: New
Start date: 10/06/2025
Due date: 10/22/2025
Assignee: Daniel Flores
Priority: High
GRUPO 6 - Feature #4874: Trabajar en el informe Feature #4874: Trabajar en el informe

Project: GRUPO 6
Status: Resolved
Start date: 10/06/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #4875: Definir actividades Feature #4875: Definir actividades

Project: GRUPO 6
Status: Resolved
Start date: 10/06/2025
Due date: 10/10/2025
Assignee: Abraham Canaviri
Priority: Normal
GRUPO 6 - Feature #5037: Completar bitácora N° 3 Feature #5037: Completar bitácora N° 3

Project: GRUPO 6
Status: Resolved
Start date: 10/06/2025
Due date: 10/10/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 11 - Feature #5162: Codificación inicial Feature #5162: Codificación inicial

Project: GRUPO 11
Status: Resolved
Start date: 10/06/2025
Due date: 10/20/2025
Assignee: Javier Echeverria
Priority: High
GRUPO 11 - Feature #5165: Movimiento del brazo Feature #5165: Movimiento del brazo

Project: GRUPO 11
Status: Resolved
Start date: 10/06/2025
Due date: 10/20/2025
Assignee: Javier Echeverria
Priority: High
GRUPO 11 - Feature #5166: Movimiento de la garra Feature #5166: Movimiento de la garra

Project: GRUPO 11
Status: Resolved
Start date: 10/06/2025
Due date: 10/20/2025
Assignee: Javier Echeverria
Priority: Normal

7

8

GRUPO 2 - Feature #4866: Revision del prototipo Feature #4866: Revision del prototipo

Project: GRUPO 2
Status: New
Start date: 10/08/2025
Due date: 10/08/2025
Assignee:
Priority: Normal
GRUPO 2 - Feature #4867: Investigar medios para la c... Feature #4867: Investigar medios para la creacion de un software de control

Project: GRUPO 2
Status: Resolved
Start date: 10/08/2025
Due date: 10/20/2025
Assignee: Bruno Rojas
Priority: Normal
GRUPO 3 - Feature #4970: Primer avance del Informe Feature #4970: Primer avance del Informe

Project: GRUPO 3
Status: Resolved
Start date: 10/08/2025
Due date: 10/17/2025
Assignee:
Priority: High
GRUPO 3 - Feature #4976: Avance 1ra Parte Informe Feature #4976: Avance 1ra Parte Informe

Project: GRUPO 3
Status: Resolved
Start date: 10/08/2025
Due date: 10/16/2025
Assignee: Camilo Geraldo
Priority: High
GRUPO 3 - Feature #4977: Carta Gantt Feature #4977: Carta Gantt

Project: GRUPO 3
Status: Resolved
Start date: 10/08/2025
Due date: 10/16/2025
Assignee: Matias Sagredo
Priority: High
GRUPO 6 - Feature #4876: Realizar la carta gantt Feature #4876: Realizar la carta gantt

Project: GRUPO 6
Status: Resolved
Start date: 10/08/2025
Due date: 10/13/2025
Assignee: Brayan Cahuachia
Priority: Normal

9

GRUPO 8 - Feature #4887: Mejora en la velocidad del ... Feature #4887: Mejora en la velocidad del robot de lego

Project: GRUPO 8
Status: New
Start date: 10/09/2025
Due date: 10/09/2025
Assignee: Gabriel Delgado
Priority: Normal
GRUPO 10 - Feature #4884: Testeando y creando funcion... Feature #4884: Testeando y creando funciones para el robot

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/09/2025
Assignee:
Priority: High
GRUPO 5 - Feature #5222: Avance del Informe Feature #5222: Avance del Informe

Project: GRUPO 5
Status: Resolved
Start date: 09/26/2025
Due date: 10/09/2025
Assignee: Franco Churata
Priority: Normal
GRUPO 11 - Feature #5151: Construcción base del Robot Feature #5151: Construcción base del Robot

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/09/2025
Assignee: José Terrazas
Priority: High
GRUPO 11 - Feature #5152: Construcción brazo del robot Feature #5152: Construcción brazo del robot

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/09/2025
Assignee: Alexander Pinto
Priority: Normal
GRUPO 7 - Feature #5956: Configuración del HUB Feature #5956: Configuración del HUB

Project: GRUPO 7
Status: New
Start date: 10/09/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #4885: Avance informe Feature #4885: Avance informe

Project: GRUPO 8
Status: New
Start date: 10/09/2025
Due date: 10/17/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 10 - Feature #4955: Implementacion de la interf... Feature #4955: Implementacion de la interfaz de usuario

Project: GRUPO 10
Status: New
Start date: 10/09/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #6130: DESARROLLO INTERFAZ Feature #6130: DESARROLLO INTERFAZ

Project: GRUPO 10
Status: New
Start date: 10/09/2025
Due date: 11/14/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #5749: Prototipo de programacion Feature #5749: Prototipo de programacion

Project: GRUPO 6
Status: Resolved
Start date: 10/09/2025
Due date: 10/16/2025
Assignee: Brayan Cahuachia
Priority: Normal

10

GRUPO 3 - Feature #5004: Ajustes a diseño del protot... Feature #5004: Ajustes a diseño del prototipo.

Project: GRUPO 3
Status: Resolved
Start date: 10/01/2025
Due date: 10/10/2025
Assignee: Maximiliano Burgos
Priority: Normal
GRUPO 3 - Feature #5647: Bitácora semana 3 Feature #5647: Bitácora semana 3

Project: GRUPO 3
Status: Resolved
Start date: 10/06/2025
Due date: 10/10/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #4909: Ordenamiento de los cables ... Feature #4909: Ordenamiento de los cables para el funcionamiento correcto del robot

Project: GRUPO 8
Status: New
Start date: 09/26/2025
Due date: 10/10/2025
Assignee: Gabriel Delgado
Priority: Normal
GRUPO 8 - Feature #5048: Prototipo robot terminado Feature #5048: Prototipo robot terminado

Project: GRUPO 8
Status: New
Start date: 10/10/2025
Due date: 10/10/2025
Assignee: Willy Cruz
Priority: Normal
GRUPO 10 - Feature #4831: Planificación del Proyecto Feature #4831: Planificación del Proyecto

Project: GRUPO 10
Status: New
Start date: 09/04/2025
Due date: 10/10/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #4953: Bitacora semana 3 Feature #4953: Bitacora semana 3

Project: GRUPO 10
Status: New
Start date: 10/10/2025
Due date: 10/10/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #4958: Desarrollo de la estructura... Feature #4958: Desarrollo de la estructura funcional y algortimica

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/10/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #6116: INICIO Y PLANIFICACIÓN Feature #6116: INICIO Y PLANIFICACIÓN

Project: GRUPO 10
Status: New
Start date: 09/03/2025
Due date: 10/10/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5220: Codificación con Bloques Feature #5220: Codificación con Bloques

Project: GRUPO 5
Status: Resolved
Start date: 10/04/2025
Due date: 10/10/2025
Assignee: Joaquin Quezada
Priority: Normal
GRUPO 6 - Feature #4875: Definir actividades Feature #4875: Definir actividades

Project: GRUPO 6
Status: Resolved
Start date: 10/06/2025
Due date: 10/10/2025
Assignee: Abraham Canaviri
Priority: Normal
GRUPO 6 - Feature #5037: Completar bitácora N° 3 Feature #5037: Completar bitácora N° 3

Project: GRUPO 6
Status: Resolved
Start date: 10/06/2025
Due date: 10/10/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 11 - Feature #5153: Construcción garra del robot Feature #5153: Construcción garra del robot

Project: GRUPO 11
Status: Resolved
Start date: 10/03/2025
Due date: 10/10/2025
Assignee: Alexander Pinto
Priority: Normal
GRUPO 2 - Feature #5240: programacion de movimientos Feature #5240: programacion de movimientos

Project: GRUPO 2
Status: New
Start date: 10/10/2025
Due date: 10/12/2025
Assignee: Bruno Rojas
Priority: Normal
GRUPO 7 - Feature #5951: Instalación del chasis y ru... Feature #5951: Instalación del chasis y ruedas

Project: GRUPO 7
Status: New
Start date: 10/10/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #4927: Extensión de robot(actualiz... Feature #4927: Extensión de robot(actualización)

Project: GRUPO 8
Status: New
Start date: 10/10/2025
Due date: 10/16/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 6 - Feature #4962: Explorar formas de manejar ... Feature #4962: Explorar formas de manejar el Spike de manera remota

Project: GRUPO 6
Status: Resolved
Start date: 10/10/2025
Due date: 10/17/2025
Assignee: Brayan Cahuachia
Priority: Normal
GRUPO 11 - Feature #5188: Pruebas del prototipo Feature #5188: Pruebas del prototipo

Project: GRUPO 11
Status: In Progress
Start date: 10/10/2025
Due date: 12/31/2025
Assignee:
Priority: Urgent
GRUPO 11 - Feature #5193: Revisión de la estructura Feature #5193: Revisión de la estructura

Project: GRUPO 11
Status: In Progress
Start date: 10/10/2025
Due date: 10/15/2025
Assignee: José Terrazas
Priority: Normal
GRUPO 11 - Feature #5194: Revision del código Feature #5194: Revision del código

Project: GRUPO 11
Status: In Progress
Start date: 10/10/2025
Due date: 10/25/2025
Assignee: Javier Echeverria
Priority: Normal

11

GRUPO 11 - Feature #5205: Ensamblaje prototipo Feature #5205: Ensamblaje prototipo

Project: GRUPO 11
Status: Resolved
Start date: 10/11/2025
Due date: 10/12/2025
Assignee: José Terrazas
Priority: Normal
42

12

GRUPO 2 - Feature #5240: programacion de movimientos Feature #5240: programacion de movimientos

Project: GRUPO 2
Status: New
Start date: 10/10/2025
Due date: 10/12/2025
Assignee: Bruno Rojas
Priority: Normal
GRUPO 11 - Feature #5149: Prototipo del robot Feature #5149: Prototipo del robot

Project: GRUPO 11
Status: Resolved
Start date: 09/26/2025
Due date: 10/12/2025
Assignee: José Terrazas
Priority: High
GRUPO 11 - Feature #5205: Ensamblaje prototipo Feature #5205: Ensamblaje prototipo

Project: GRUPO 11
Status: Resolved
Start date: 10/11/2025
Due date: 10/12/2025
Assignee: José Terrazas
Priority: Normal
Bug #5034: Creación de informe de avance Bug #5034: Creación de informe de avance

Project: Proyecto I 2025
Status: New
Start date: 10/12/2025
Due date: 10/16/2025
Assignee:
Priority: Normal

13

GRUPO 2 - Feature #5252: uso de robot con los movimi... Feature #5252: uso de robot con los movimientos

Project: GRUPO 2
Status: New
Start date: 10/13/2025
Due date: 10/13/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #4876: Realizar la carta gantt Feature #4876: Realizar la carta gantt

Project: GRUPO 6
Status: Resolved
Start date: 10/08/2025
Due date: 10/13/2025
Assignee: Brayan Cahuachia
Priority: Normal
Feature #5641: Github Feature #5641: Github

Project: Proyecto I 2025
Status: New
Start date: 10/13/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 1 - Feature #5041: Codificación de programa Feature #5041: Codificación de programa

Project: GRUPO 1
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Bastian Hernandez
Priority: Normal
GRUPO 3 - Feature #5648: Bitácora semana 4 Feature #5648: Bitácora semana 4

Project: GRUPO 3
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 4 - Feature #4969: Pruebas con robot Feature #4969: Pruebas con robot

Project: GRUPO 4
Status: New
Start date: 10/13/2025
Due date: 10/31/2025
Assignee: Daniel Flores
Priority: Normal
GRUPO 6 - Feature #5029: Ítem carta Gantt Feature #5029: Ítem carta Gantt

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5030: Ítem estimación de costos Feature #5030: Ítem estimación de costos

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5031: Ítem conclusión Feature #5031: Ítem conclusión

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5032: Revisión del Informe Feature #5032: Revisión del Informe

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Abraham Canaviri
Priority: Normal
GRUPO 6 - Feature #5038: Completar bitácora N° 4 Feature #5038: Completar bitácora N° 4

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal

14

15

GRUPO 11 - Feature #5193: Revisión de la estructura Feature #5193: Revisión de la estructura

Project: GRUPO 11
Status: In Progress
Start date: 10/10/2025
Due date: 10/15/2025
Assignee: José Terrazas
Priority: Normal
GRUPO 2 - Feature #5253: Prototipo numero 2 Feature #5253: Prototipo numero 2

Project: GRUPO 2
Status: Resolved
Start date: 10/15/2025
Due date: 10/17/2025
Assignee: Milton Porlles
Priority: Normal
GRUPO 3 - Feature #5005: Documentación de la planifi... Feature #5005: Documentación de la planificación del proyecto

Project: GRUPO 3
Status: Resolved
Start date: 10/15/2025
Due date: 10/17/2025
Assignee: Ignacio Cuevas
Priority: Normal
GRUPO 3 - Feature #5642: Github Feature #5642: Github

Project: GRUPO 3
Status: Feedback
Start date: 10/15/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5643: Creación de repositorio Feature #5643: Creación de repositorio

Project: GRUPO 3
Status: Feedback
Start date: 10/15/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5236: Creación del repositorio en... Feature #5236: Creación del repositorio en Github

Project: GRUPO 5
Status: Resolved
Start date: 10/15/2025
Due date: 10/16/2025
Assignee:
Priority: Normal

16

Bug #5034: Creación de informe de avance Bug #5034: Creación de informe de avance

Project: Proyecto I 2025
Status: New
Start date: 10/12/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #4976: Avance 1ra Parte Informe Feature #4976: Avance 1ra Parte Informe

Project: GRUPO 3
Status: Resolved
Start date: 10/08/2025
Due date: 10/16/2025
Assignee: Camilo Geraldo
Priority: High
GRUPO 3 - Feature #4977: Carta Gantt Feature #4977: Carta Gantt

Project: GRUPO 3
Status: Resolved
Start date: 10/08/2025
Due date: 10/16/2025
Assignee: Matias Sagredo
Priority: High
GRUPO 8 - Feature #4927: Extensión de robot(actualiz... Feature #4927: Extensión de robot(actualización)

Project: GRUPO 8
Status: New
Start date: 10/10/2025
Due date: 10/16/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 9 - Feature #5191: II. DISEÑO Y CONSTRUCCIÓN Feature #5191: II. DISEÑO Y CONSTRUCCIÓN

Project: GRUPO 9
Status: New
Start date: 09/25/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5243: Construir brazo del robot Feature #5243: Construir brazo del robot

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5244: Construir garra del robot Feature #5244: Construir garra del robot

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5247: Ensamblar estructura Base Feature #5247: Ensamblar estructura Base

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee: Benjamin Sucso
Priority: Normal
GRUPO 9 - Feature #5248: Probar giro de 360° Feature #5248: Probar giro de 360°

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5249: Probar movimiento vertical ... Feature #5249: Probar movimiento vertical del brazo robótico

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee: Matias Agriano
Priority: Normal
GRUPO 9 - Feature #5250: Probar el agarre y liberaci... Feature #5250: Probar el agarre y liberación de la garra

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5236: Creación del repositorio en... Feature #5236: Creación del repositorio en Github

Project: GRUPO 5
Status: Resolved
Start date: 10/15/2025
Due date: 10/16/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #5749: Prototipo de programacion Feature #5749: Prototipo de programacion

Project: GRUPO 6
Status: Resolved
Start date: 10/09/2025
Due date: 10/16/2025
Assignee: Brayan Cahuachia
Priority: Normal
GRUPO 1 - Feature #4967: Documentacion Feature #4967: Documentacion

Project: GRUPO 1
Status: Resolved
Start date: 10/16/2025
Due date: 10/23/2025
Assignee: Marcos Caldas
Priority: High
GRUPO 1 - Feature #4971: Avance informe Feature #4971: Avance informe

Project: GRUPO 1
Status: Resolved
Start date: 10/16/2025
Due date: 10/23/2025
Assignee: Bastian Hernandez
Priority: Normal
GRUPO 2 - Feature #5254: confeccion de informe Feature #5254: confeccion de informe

Project: GRUPO 2
Status: Resolved
Start date: 10/16/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5952: Instalación del HUB y motores Feature #5952: Instalación del HUB y motores

Project: GRUPO 7
Status: New
Start date: 10/16/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5953: Ensamblaje final Feature #5953: Ensamblaje final

Project: GRUPO 7
Status: New
Start date: 10/16/2025
Due date: 10/23/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #5021: Avance informe Feature #5021: Avance informe

Project: GRUPO 8
Status: New
Start date: 10/16/2025
Due date: 10/23/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 10 - Feature #5213: Implementacion de logo de l... Feature #5213: Implementacion de logo de la interfaz

Project: GRUPO 10
Status: New
Start date: 10/16/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5695: Investigacion de libreria P... Feature #5695: Investigacion de libreria Pybricks

Project: GRUPO 10
Status: New
Start date: 10/16/2025
Due date: 10/24/2025
Assignee:
Priority: Normal

17

Feature #5641: Github Feature #5641: Github

Project: Proyecto I 2025
Status: New
Start date: 10/13/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 1 - Feature #5041: Codificación de programa Feature #5041: Codificación de programa

Project: GRUPO 1
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Bastian Hernandez
Priority: Normal
GRUPO 1 - Feature #5114: Pruebas de codigo. Feature #5114: Pruebas de codigo.

Project: GRUPO 1
Status: Resolved
Start date: 09/29/2025
Due date: 10/17/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 1 - Feature #5116: Entrega Informe de Avance Feature #5116: Entrega Informe de Avance

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 10/17/2025
Assignee: Marcos Caldas
Priority: High
GRUPO 2 - Feature #5253: Prototipo numero 2 Feature #5253: Prototipo numero 2

Project: GRUPO 2
Status: Resolved
Start date: 10/15/2025
Due date: 10/17/2025
Assignee: Milton Porlles
Priority: Normal
GRUPO 2 - Feature #5254: confeccion de informe Feature #5254: confeccion de informe

Project: GRUPO 2
Status: Resolved
Start date: 10/16/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #4970: Primer avance del Informe Feature #4970: Primer avance del Informe

Project: GRUPO 3
Status: Resolved
Start date: 10/08/2025
Due date: 10/17/2025
Assignee:
Priority: High
GRUPO 3 - Feature #5005: Documentación de la planifi... Feature #5005: Documentación de la planificación del proyecto

Project: GRUPO 3
Status: Resolved
Start date: 10/15/2025
Due date: 10/17/2025
Assignee: Ignacio Cuevas
Priority: Normal
GRUPO 3 - Feature #5642: Github Feature #5642: Github

Project: GRUPO 3
Status: Feedback
Start date: 10/15/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5643: Creación de repositorio Feature #5643: Creación de repositorio

Project: GRUPO 3
Status: Feedback
Start date: 10/15/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5648: Bitácora semana 4 Feature #5648: Bitácora semana 4

Project: GRUPO 3
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5951: Instalación del chasis y ru... Feature #5951: Instalación del chasis y ruedas

Project: GRUPO 7
Status: New
Start date: 10/10/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5952: Instalación del HUB y motores Feature #5952: Instalación del HUB y motores

Project: GRUPO 7
Status: New
Start date: 10/16/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5956: Configuración del HUB Feature #5956: Configuración del HUB

Project: GRUPO 7
Status: New
Start date: 10/09/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #4885: Avance informe Feature #4885: Avance informe

Project: GRUPO 8
Status: New
Start date: 10/09/2025
Due date: 10/17/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 9 - Feature #5184: Redactar la Carta Gantt Feature #5184: Redactar la Carta Gantt

Project: GRUPO 9
Status: New
Start date: 09/26/2025
Due date: 10/17/2025
Assignee: Eduardo Suaña
Priority: Normal
GRUPO 9 - Feature #5185: Redactar el informe inicial Feature #5185: Redactar el informe inicial

Project: GRUPO 9
Status: New
Start date: 09/25/2025
Due date: 10/17/2025
Assignee: Matias Agriano
Priority: Normal
GRUPO 9 - Feature #5251: Redactar el Informe 1 Feature #5251: Redactar el Informe 1

Project: GRUPO 9
Status: New
Start date: 10/02/2025
Due date: 10/17/2025
Assignee: Dylan Calderon
Priority: Normal
GRUPO 10 - Feature #4954: Entrega del informe 1 Feature #4954: Entrega del informe 1

Project: GRUPO 10
Status: New
Start date: 10/17/2025
Due date: 10/17/2025
Assignee:
Priority: High
GRUPO 10 - Feature #4955: Implementacion de la interf... Feature #4955: Implementacion de la interfaz de usuario

Project: GRUPO 10
Status: New
Start date: 10/09/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #4956: Desarrollo en libreria Pybrick Feature #4956: Desarrollo en libreria Pybrick

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5213: Implementacion de logo de l... Feature #5213: Implementacion de logo de la interfaz

Project: GRUPO 10
Status: New
Start date: 10/16/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5216: Bitacora semana 4 Feature #5216: Bitacora semana 4

Project: GRUPO 10
Status: New
Start date: 10/17/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #6126: Desarrollo del informe 1 Feature #6126: Desarrollo del informe 1

Project: GRUPO 10
Status: New
Start date: 10/02/2025
Due date: 10/17/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5227: Entrega Informe 1 Feature #5227: Entrega Informe 1

Project: GRUPO 5
Status: Resolved
Start date: 09/26/2025
Due date: 10/17/2025
Assignee:
Priority: High
GRUPO 6 - Feature #4874: Trabajar en el informe Feature #4874: Trabajar en el informe

Project: GRUPO 6
Status: Resolved
Start date: 10/06/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #4902: Construcción del robot Feature #4902: Construcción del robot

Project: GRUPO 6
Status: Resolved
Start date: 09/29/2025
Due date: 10/17/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 6 - Feature #4962: Explorar formas de manejar ... Feature #4962: Explorar formas de manejar el Spike de manera remota

Project: GRUPO 6
Status: Resolved
Start date: 10/10/2025
Due date: 10/17/2025
Assignee: Brayan Cahuachia
Priority: Normal
GRUPO 6 - Feature #5029: Ítem carta Gantt Feature #5029: Ítem carta Gantt

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5030: Ítem estimación de costos Feature #5030: Ítem estimación de costos

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5031: Ítem conclusión Feature #5031: Ítem conclusión

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5032: Revisión del Informe Feature #5032: Revisión del Informe

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Abraham Canaviri
Priority: Normal
GRUPO 6 - Feature #5038: Completar bitácora N° 4 Feature #5038: Completar bitácora N° 4

Project: GRUPO 6
Status: Resolved
Start date: 10/13/2025
Due date: 10/17/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 1 - Feature #5108: Optimización del código Feature #5108: Optimización del código

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 11/10/2025
Assignee: Marcos Caldas
Priority: Normal
GRUPO 1 - Feature #5113: Uso de Github. Feature #5113: Uso de Github.

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 10/24/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 1 - Feature #5117: Fase 2 Feature #5117: Fase 2

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 12/31/2025
Assignee:
Priority: High
GRUPO 1 - Feature #5118: Documentacion Feature #5118: Documentacion

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 12/30/2025
Assignee:
Priority: High
GRUPO 1 - Feature #5119: Creacion del repositorio. Feature #5119: Creacion del repositorio.

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 10/24/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 1 - Feature #5120: Avance informe final Feature #5120: Avance informe final

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 12/12/2025
Assignee: Alex Campillay
Priority: Normal
GRUPO 1 - Feature #5123: Ensamblaje Feature #5123: Ensamblaje

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 12/15/2025
Assignee: Alex Campillay
Priority: Normal
GRUPO 1 - Feature #5124: Finalización del robot Feature #5124: Finalización del robot

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 10/31/2025
Assignee: Alex Campillay
Priority: Normal
GRUPO 7 - Feature #5965: Elaboración y corrección de... Feature #5965: Elaboración y corrección de informes

Project: GRUPO 7
Status: New
Start date: 10/17/2025
Due date: 12/29/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5197: III. IMPLEMENTACION Feature #5197: III. IMPLEMENTACION

Project: GRUPO 9
Status: New
Start date: 10/17/2025
Due date: 12/19/2025
Assignee: Matias Agriano
Priority: Normal
GRUPO 9 - Feature #5246: Programar Interfaz gráfica Feature #5246: Programar Interfaz gráfica

Project: GRUPO 9
Status: New
Start date: 10/17/2025
Due date: 12/19/2025
Assignee:
Priority: Normal
GRUPO 9 - Feature #5256: Investigar el software y lo... Feature #5256: Investigar el software y los métodos de programación

Project: GRUPO 9
Status: New
Start date: 10/17/2025
Due date: 12/05/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5215: Desarrollos de botones y fl... Feature #5215: Desarrollos de botones y flechas en paint

Project: GRUPO 10
Status: New
Start date: 10/17/2025
Due date: 10/23/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5940: Integración del control ina... Feature #5940: Integración del control inalámbrico

Project: GRUPO 5
Status: Resolved
Start date: 10/17/2025
Due date: 10/20/2025
Assignee:
Priority: High

18

43

19

20

GRUPO 2 - Feature #4867: Investigar medios para la c... Feature #4867: Investigar medios para la creacion de un software de control

Project: GRUPO 2
Status: Resolved
Start date: 10/08/2025
Due date: 10/20/2025
Assignee: Bruno Rojas
Priority: Normal
GRUPO 5 - Feature #5008: Codificación Feature #5008: Codificación

Project: GRUPO 5
Status: Resolved
Start date: 10/01/2025
Due date: 10/20/2025
Assignee: Joaquin Quezada
Priority: High
GRUPO 5 - Feature #5940: Integración del control ina... Feature #5940: Integración del control inalámbrico

Project: GRUPO 5
Status: Resolved
Start date: 10/17/2025
Due date: 10/20/2025
Assignee:
Priority: High
GRUPO 11 - Feature #5154: Software Feature #5154: Software

Project: GRUPO 11
Status: Resolved
Start date: 09/26/2025
Due date: 10/20/2025
Assignee: Javier Echeverria
Priority: High
GRUPO 11 - Feature #5162: Codificación inicial Feature #5162: Codificación inicial

Project: GRUPO 11
Status: Resolved
Start date: 10/06/2025
Due date: 10/20/2025
Assignee: Javier Echeverria
Priority: High
GRUPO 11 - Feature #5165: Movimiento del brazo Feature #5165: Movimiento del brazo

Project: GRUPO 11
Status: Resolved
Start date: 10/06/2025
Due date: 10/20/2025
Assignee: Javier Echeverria
Priority: High
GRUPO 11 - Feature #5166: Movimiento de la garra Feature #5166: Movimiento de la garra

Project: GRUPO 11
Status: Resolved
Start date: 10/06/2025
Due date: 10/20/2025
Assignee: Javier Echeverria
Priority: Normal
GRUPO 3 - Feature #5438: Revisión/Corrección del Código Feature #5438: Revisión/Corrección del Código

Project: GRUPO 3
Status: Resolved
Start date: 10/20/2025
Due date: 10/27/2025
Assignee: Jose Quispe
Priority: High
GRUPO 3 - Feature #5639: Optimización del sensor de ... Feature #5639: Optimización del sensor de color

Project: GRUPO 3
Status: Resolved
Start date: 10/20/2025
Due date: 10/22/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5649: Bitácora semana 5 Feature #5649: Bitácora semana 5

Project: GRUPO 3
Status: Resolved
Start date: 10/20/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #5241: Control inalámbrico del robot Feature #5241: Control inalámbrico del robot

Project: GRUPO 6
Status: Resolved
Start date: 10/20/2025
Due date: 12/10/2025
Assignee: Brayan Cahuachia
Priority: High
GRUPO 6 - Feature #5242: Diseñar la interfaz de con... Feature #5242: Diseñar la interfaz de control

Project: GRUPO 6
Status: Resolved
Start date: 10/20/2025
Due date: 10/24/2025
Assignee: Ruth Huanca
Priority: High
GRUPO 6 - Feature #5437: Completar bitácora N° 5 Feature #5437: Completar bitácora N° 5

Project: GRUPO 6
Status: Resolved
Start date: 10/20/2025
Due date: 10/24/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5665: Programacion de movimientos Feature #5665: Programacion de movimientos

Project: GRUPO 6
Status: Resolved
Start date: 10/20/2025
Due date: 10/31/2025
Assignee: Cristofer Lazaro
Priority: Normal

21

22

GRUPO 1 - Feature #5109: Optimización del Prototipo Feature #5109: Optimización del Prototipo

Project: GRUPO 1
Status: Resolved
Start date: 10/01/2025
Due date: 10/22/2025
Assignee: Alex Campillay
Priority: Normal
GRUPO 3 - Feature #5639: Optimización del sensor de ... Feature #5639: Optimización del sensor de color

Project: GRUPO 3
Status: Resolved
Start date: 10/20/2025
Due date: 10/22/2025
Assignee:
Priority: Normal
GRUPO 4 - Feature #5033: Investigación Lib. Pybricksdev Feature #5033: Investigación Lib. Pybricksdev

Project: GRUPO 4
Status: New
Start date: 10/06/2025
Due date: 10/22/2025
Assignee: Daniel Flores
Priority: High
GRUPO 3 - Feature #5636: Reorganización de la Secuen... Feature #5636: Reorganización de la Secuencia de Ejecución

Project: GRUPO 3
Status: Resolved
Start date: 10/22/2025
Due date: 10/27/2025
Assignee:
Priority: High

23

GRUPO 1 - Feature #4967: Documentacion Feature #4967: Documentacion

Project: GRUPO 1
Status: Resolved
Start date: 10/16/2025
Due date: 10/23/2025
Assignee: Marcos Caldas
Priority: High
GRUPO 1 - Feature #4971: Avance informe Feature #4971: Avance informe

Project: GRUPO 1
Status: Resolved
Start date: 10/16/2025
Due date: 10/23/2025
Assignee: Bastian Hernandez
Priority: Normal
GRUPO 7 - Feature #5950: CONSTRUCCIÓN DEL ROBOT Feature #5950: CONSTRUCCIÓN DEL ROBOT

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/23/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5953: Ensamblaje final Feature #5953: Ensamblaje final

Project: GRUPO 7
Status: New
Start date: 10/16/2025
Due date: 10/23/2025
Assignee:
Priority: Normal
GRUPO 8 - Feature #5021: Avance informe Feature #5021: Avance informe

Project: GRUPO 8
Status: New
Start date: 10/16/2025
Due date: 10/23/2025
Assignee: Nicolas Olivares
Priority: Normal
GRUPO 10 - Feature #5215: Desarrollos de botones y fl... Feature #5215: Desarrollos de botones y flechas en paint

Project: GRUPO 10
Status: New
Start date: 10/17/2025
Due date: 10/23/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5954: PROGRAMACIÓN Y CÓDIGO Feature #5954: PROGRAMACIÓN Y CÓDIGO

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 12/20/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5957: Programación de movimientos... Feature #5957: Programación de movimientos básicos y giros

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5958: Optimización y limpieza del... Feature #5958: Optimización y limpieza del código

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5959: PRUEBAS Y AJUSTES Feature #5959: PRUEBAS Y AJUSTES

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 12/29/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5961: Identificación y corrección... Feature #5961: Identificación y corrección de errores

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 12/29/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5968: Creación de repositorio de ... Feature #5968: Creación de repositorio de código

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 12/19/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5696: Implementacion del codigo a... Feature #5696: Implementacion del codigo a Pybricks

Project: GRUPO 10
Status: New
Start date: 10/23/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5697: Revision sobre la mejor pla... Feature #5697: Revision sobre la mejor plataforma para la interfaz visual

Project: GRUPO 10
Status: New
Start date: 10/23/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5698: Cambios en la estructura de... Feature #5698: Cambios en la estructura de del vehiculo

Project: GRUPO 10
Status: New
Start date: 10/23/2025
Due date: 10/24/2025
Assignee:
Priority: Normal

24

GRUPO 1 - Feature #5113: Uso de Github. Feature #5113: Uso de Github.

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 10/24/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 1 - Feature #5119: Creacion del repositorio. Feature #5119: Creacion del repositorio.

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 10/24/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 3 - Feature #5649: Bitácora semana 5 Feature #5649: Bitácora semana 5

Project: GRUPO 3
Status: Resolved
Start date: 10/20/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5958: Optimización y limpieza del... Feature #5958: Optimización y limpieza del código

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5693: Bitacora semana 5 Feature #5693: Bitacora semana 5

Project: GRUPO 10
Status: New
Start date: 10/24/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5695: Investigacion de libreria P... Feature #5695: Investigacion de libreria Pybricks

Project: GRUPO 10
Status: New
Start date: 10/16/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5696: Implementacion del codigo a... Feature #5696: Implementacion del codigo a Pybricks

Project: GRUPO 10
Status: New
Start date: 10/23/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5698: Cambios en la estructura de... Feature #5698: Cambios en la estructura de del vehiculo

Project: GRUPO 10
Status: New
Start date: 10/23/2025
Due date: 10/24/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #6132: INVESTIGACIÓN Y PROGRAMACIÓN Feature #6132: INVESTIGACIÓN Y PROGRAMACIÓN

Project: GRUPO 10
Status: New
Start date: 09/19/2025
Due date: 10/24/2025
Assignee:
Priority: High
GRUPO 5 - Feature #5133: Registro de bitácoras Feature #5133: Registro de bitácoras

Project: GRUPO 5
Status: Resolved
Start date: 09/26/2025
Due date: 10/24/2025
Assignee:
Priority: High
GRUPO 5 - Feature #5169: Fase 1 Feature #5169: Fase 1

Project: GRUPO 5
Status: Resolved
Start date: 09/22/2025
Due date: 10/24/2025
Assignee:
Priority: High
GRUPO 5 - Feature #5198: Documentación Feature #5198: Documentación

Project: GRUPO 5
Status: Resolved
Start date: 09/26/2025
Due date: 10/24/2025
Assignee:
Priority: High
GRUPO 5 - Feature #5686: Reasignación de roles Feature #5686: Reasignación de roles

Project: GRUPO 5
Status: Resolved
Start date: 10/24/2025
Due date: 10/24/2025
Assignee:
Priority: Immediate
GRUPO 6 - Feature #5242: Diseñar la interfaz de con... Feature #5242: Diseñar la interfaz de control

Project: GRUPO 6
Status: Resolved
Start date: 10/20/2025
Due date: 10/24/2025
Assignee: Ruth Huanca
Priority: High
GRUPO 6 - Feature #5437: Completar bitácora N° 5 Feature #5437: Completar bitácora N° 5

Project: GRUPO 6
Status: Resolved
Start date: 10/20/2025
Due date: 10/24/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 1 - Feature #5112: Implementacion del sistema ... Feature #5112: Implementacion del sistema Pybricks

Project: GRUPO 1
Status: Resolved
Start date: 10/24/2025
Due date: 10/31/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 1 - Feature #5115: Adaptar Pybricks con VSC Feature #5115: Adaptar Pybricks con VSC

Project: GRUPO 1
Status: Resolved
Start date: 10/24/2025
Due date: 10/31/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 7 - Feature #5960: Pruebas de movimiento y giros Feature #5960: Pruebas de movimiento y giros

Project: GRUPO 7
Status: New
Start date: 10/24/2025
Due date: 12/29/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5997: Conexion del Hub a Interfaz Feature #5997: Conexion del Hub a Interfaz

Project: GRUPO 7
Status: New
Start date: 10/24/2025
Due date: 12/05/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #6030: DESARROLLO DE INTERFAZ Feature #6030: DESARROLLO DE INTERFAZ

Project: GRUPO 7
Status: New
Start date: 10/24/2025
Due date: 12/25/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5183: Fase 2 Feature #5183: Fase 2

Project: GRUPO 5
Status: Resolved
Start date: 10/24/2025
Due date: 12/19/2025
Assignee:
Priority: Immediate

25

GRUPO 11 - Feature #5194: Revision del código Feature #5194: Revision del código

Project: GRUPO 11
Status: In Progress
Start date: 10/10/2025
Due date: 10/25/2025
Assignee: Javier Echeverria
Priority: Normal
GRUPO 5 - Bug #5187: Documentación Bug #5187: Documentación

Project: GRUPO 5
Status: Resolved
Start date: 10/25/2025
Due date: 12/19/2025
Assignee:
Priority: Immediate
GRUPO 5 - Feature #5687: Registro de Bitácoras Feature #5687: Registro de Bitácoras

Project: GRUPO 5
Status: Resolved
Start date: 10/25/2025
Due date: 12/19/2025
Assignee:
Priority: Normal
GRUPO 11 - Feature #5210: Codificación Feature #5210: Codificación

Project: GRUPO 11
Status: Resolved
Start date: 10/25/2025
Due date: 12/31/2025
Assignee: Javier Echeverria
Priority: Urgent
GRUPO 11 - Feature #5234: Perfeccionar movimientos de... Feature #5234: Perfeccionar movimientos del robot

Project: GRUPO 11
Status: New
Start date: 10/25/2025
Due date:
Assignee:
Priority: Normal
44

26

27

GRUPO 3 - Feature #5438: Revisión/Corrección del Código Feature #5438: Revisión/Corrección del Código

Project: GRUPO 3
Status: Resolved
Start date: 10/20/2025
Due date: 10/27/2025
Assignee: Jose Quispe
Priority: High
GRUPO 3 - Feature #5636: Reorganización de la Secuen... Feature #5636: Reorganización de la Secuencia de Ejecución

Project: GRUPO 3
Status: Resolved
Start date: 10/22/2025
Due date: 10/27/2025
Assignee:
Priority: High
GRUPO 1 - Feature #5125: Pruebas del Robot Feature #5125: Pruebas del Robot

Project: GRUPO 1
Status: Resolved
Start date: 10/27/2025
Due date: 12/12/2025
Assignee: Alex Campillay
Priority: Normal
GRUPO 2 - Feature #5634: Desarrollo del prototipo de... Feature #5634: Desarrollo del prototipo de Control Remoto

Project: GRUPO 2
Status: New
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Renato Chacon
Priority: Normal
GRUPO 2 - Feature #5635: Segunda revision del Protot... Feature #5635: Segunda revision del Prototipo Auto

Project: GRUPO 2
Status: New
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Milton Porlles
Priority: Normal
GRUPO 2 - Feature #5674: fase 2 Feature #5674: fase 2

Project: GRUPO 2
Status: New
Start date: 10/27/2025
Due date: 12/01/2025
Assignee:
Priority: Normal
GRUPO 2 - Feature #5683: investigacion de software p... Feature #5683: investigacion de software para creacion de app de celular

Project: GRUPO 2
Status: New
Start date: 10/27/2025
Due date: 11/21/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5637: Calibración e Implementació... Feature #5637: Calibración e Implementación de Control Remoto para Operación Manual

Project: GRUPO 3
Status: Resolved
Start date: 10/27/2025
Due date: 10/29/2025
Assignee: Camilo Geraldo
Priority: Normal
GRUPO 3 - Feature #5650: Bitácora semana 6 Feature #5650: Bitácora semana 6

Project: GRUPO 3
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 6 - Feature #5186: Manual de usuario Feature #5186: Manual de usuario

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Francisca Albornoz
Priority: Normal
GRUPO 6 - Feature #5190: Planificación Feature #5190: Planificación

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Abraham Canaviri
Priority: Normal
GRUPO 6 - Feature #5525: Completar bitácora N° 6 Feature #5525: Completar bitácora N° 6

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5555: Trayectoria del robot Feature #5555: Trayectoria del robot

Project: GRUPO 6
Status: Feedback
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 6 - Feature #5557: Prueba del robot en pista Feature #5557: Prueba del robot en pista

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Cristofer Lazaro
Priority: High
GRUPO 6 - Feature #5712: Cambio de programación del ... Feature #5712: Cambio de programación del método de bloques a Python

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 11/07/2025
Assignee: Abraham Canaviri
Priority: Normal

28

29

GRUPO 3 - Feature #5637: Calibración e Implementació... Feature #5637: Calibración e Implementación de Control Remoto para Operación Manual

Project: GRUPO 3
Status: Resolved
Start date: 10/27/2025
Due date: 10/29/2025
Assignee: Camilo Geraldo
Priority: Normal
GRUPO 5 - Feature #5691: Pruebas de Estabilidad Feature #5691: Pruebas de Estabilidad

Project: GRUPO 5
Status: Resolved
Start date: 10/29/2025
Due date: 10/29/2025
Assignee:
Priority: Immediate
GRUPO 3 - Feature #5638: Ampliación de la estructura... Feature #5638: Ampliación de la estructura receptora de bloques

Project: GRUPO 3
Status: Resolved
Start date: 10/29/2025
Due date: 11/05/2025
Assignee: Matias Sagredo
Priority: High
GRUPO 3 - Feature #5640: Revisión de conexiones Feature #5640: Revisión de conexiones

Project: GRUPO 3
Status: Resolved
Start date: 10/29/2025
Due date:
Assignee:
Priority: Normal
GRUPO 5 - Feature #5138: Modificación de la Base Feature #5138: Modificación de la Base

Project: GRUPO 5
Status: Resolved
Start date: 10/29/2025
Due date: 11/04/2025
Assignee:
Priority: Normal
GRUPO 5 - Feature #5689: Actividades del Brazo Robótico Feature #5689: Actividades del Brazo Robótico

Project: GRUPO 5
Status: Resolved
Start date: 10/29/2025
Due date: 11/26/2025
Assignee:
Priority: Immediate
GRUPO 5 - Feature #5709: Reensamblaje Feature #5709: Reensamblaje

Project: GRUPO 5
Status: Resolved
Start date: 10/29/2025
Due date: 11/19/2025
Assignee:
Priority: High

30

GRUPO 8 - Feature #5662: Cambio de roles Feature #5662: Cambio de roles

Project: GRUPO 8
Status: New
Start date: 10/30/2025
Due date: 10/30/2025
Assignee: Sebastian Cahuachia
Priority: Normal
GRUPO 7 - Feature #5967: Entrega de entregables Feature #5967: Entrega de entregables

Project: GRUPO 7
Status: New
Start date: 10/30/2025
Due date: 12/29/2025
Assignee:
Priority: Normal

31

GRUPO 1 - Feature #4968: Ensamblaje Feature #4968: Ensamblaje

Project: GRUPO 1
Status: Resolved
Start date: 09/26/2025
Due date: 10/31/2025
Assignee: Enzo Llancabure
Priority: High
GRUPO 1 - Feature #5112: Implementacion del sistema ... Feature #5112: Implementacion del sistema Pybricks

Project: GRUPO 1
Status: Resolved
Start date: 10/24/2025
Due date: 10/31/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 1 - Feature #5115: Adaptar Pybricks con VSC Feature #5115: Adaptar Pybricks con VSC

Project: GRUPO 1
Status: Resolved
Start date: 10/24/2025
Due date: 10/31/2025
Assignee: Saoud Ahmed
Priority: Normal
GRUPO 1 - Feature #5121: Ensamblaje del 2do Prototipo Feature #5121: Ensamblaje del 2do Prototipo

Project: GRUPO 1
Status: Resolved
Start date: 10/01/2025
Due date: 10/31/2025
Assignee: Alex Campillay
Priority: High
GRUPO 1 - Feature #5124: Finalización del robot Feature #5124: Finalización del robot

Project: GRUPO 1
Status: Resolved
Start date: 10/17/2025
Due date: 10/31/2025
Assignee: Alex Campillay
Priority: Normal
GRUPO 2 - Feature #5634: Desarrollo del prototipo de... Feature #5634: Desarrollo del prototipo de Control Remoto

Project: GRUPO 2
Status: New
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Renato Chacon
Priority: Normal
GRUPO 2 - Feature #5635: Segunda revision del Protot... Feature #5635: Segunda revision del Prototipo Auto

Project: GRUPO 2
Status: New
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Milton Porlles
Priority: Normal
GRUPO 2 - Feature #5669: fase 1 Feature #5669: fase 1

Project: GRUPO 2
Status: New
Start date: 09/08/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 3 - Feature #5650: Bitácora semana 6 Feature #5650: Bitácora semana 6

Project: GRUPO 3
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5945: PLANIFICACIÓN Y DISEÑO INICIAL Feature #5945: PLANIFICACIÓN Y DISEÑO INICIAL

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5947: Investigación del kit Lego ... Feature #5947: Investigación del kit Lego Spike Prime

Project: GRUPO 7
Status: New
Start date: 10/02/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 7 - Feature #5957: Programación de movimientos... Feature #5957: Programación de movimientos básicos y giros

Project: GRUPO 7
Status: New
Start date: 10/23/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5694: Bitacora semana 6 Feature #5694: Bitacora semana 6

Project: GRUPO 10
Status: New
Start date: 10/31/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 10 - Feature #5697: Revision sobre la mejor pla... Feature #5697: Revision sobre la mejor plataforma para la interfaz visual

Project: GRUPO 10
Status: New
Start date: 10/23/2025
Due date: 10/31/2025
Assignee:
Priority: Normal
GRUPO 4 - Feature #4890: Fase 1 Feature #4890: Fase 1

Project: GRUPO 4
Status: New
Start date: 09/22/2025
Due date: 10/31/2025
Assignee: Guillermo Contreras
Priority: Urgent
GRUPO 4 - Feature #4892: Documentacion Feature #4892: Documentacion

Project: GRUPO 4
Status: New
Start date: 09/22/2025
Due date: 10/31/2025
Assignee: Guillermo Contreras
Priority: Urgent
GRUPO 4 - Feature #4893: Codificacion y Programacion... Feature #4893: Codificacion y Programacion del Robot

Project: GRUPO 4
Status: New
Start date: 10/06/2025
Due date: 10/31/2025
Assignee: Daniel Flores
Priority: Urgent
GRUPO 4 - Feature #4959: Informe Feature #4959: Informe

Project: GRUPO 4
Status: New
Start date: 09/22/2025
Due date: 10/31/2025
Assignee: Jhilmar Solares
Priority: Urgent
GRUPO 4 - Feature #4961: Bitácoras Feature #4961: Bitácoras

Project: GRUPO 4
Status: New
Start date: 09/22/2025
Due date: 10/31/2025
Assignee: Guillermo Contreras
Priority: Low
GRUPO 4 - Feature #4969: Pruebas con robot Feature #4969: Pruebas con robot

Project: GRUPO 4
Status: New
Start date: 10/13/2025
Due date: 10/31/2025
Assignee: Daniel Flores
Priority: Normal
GRUPO 4 - Feature #4972: Programación del robot Feature #4972: Programación del robot

Project: GRUPO 4
Status: New
Start date: 10/06/2025
Due date: 10/31/2025
Assignee: Daniel Flores
Priority: Urgent
GRUPO 6 - Feature #5186: Manual de usuario Feature #5186: Manual de usuario

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Francisca Albornoz
Priority: Normal
GRUPO 6 - Feature #5190: Planificación Feature #5190: Planificación

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Abraham Canaviri
Priority: Normal
GRUPO 6 - Feature #5525: Completar bitácora N° 6 Feature #5525: Completar bitácora N° 6

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Ruth Huanca
Priority: Normal
GRUPO 6 - Feature #5555: Trayectoria del robot Feature #5555: Trayectoria del robot

Project: GRUPO 6
Status: Feedback
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Cristofer Lazaro
Priority: Normal
GRUPO 6 - Feature #5557: Prueba del robot en pista Feature #5557: Prueba del robot en pista

Project: GRUPO 6
Status: Resolved
Start date: 10/27/2025
Due date: 10/31/2025
Assignee: Cristofer Lazaro
Priority: High
GRUPO 6 - Feature #5665: Programacion de movimientos Feature #5665: Programacion de movimientos

Project: GRUPO 6
Status: Resolved
Start date: 10/20/2025
Due date: 10/31/2025
Assignee: Cristofer Lazaro
Priority: Normal

1