| Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | |
|---|---|---|---|---|---|---|---|
| 49 |
30
GRUPO 1 -
Feature #5726: Implementación de una inter...
Feature #5726: Implementación de una interfaz.
Project: GRUPO 1 Status: Resolved Start date: 11/10/2025 Due date: 11/30/2025 Assignee: Marcos Caldas Priority: Normal
GRUPO 11 -
Feature #5802: Mejora de arquitectura
Feature #5802: Mejora de arquitectura
Project: GRUPO 11 Status: New Start date: 11/14/2025 Due date: 11/30/2025 Assignee: Alexander Pinto Priority: Low
GRUPO 11 -
Feature #5224: Optimización
Feature #5224: Optimización
Project: GRUPO 11 Status: New Start date: 11/30/2025 Due date: 12/31/2025 Assignee: Priority: Urgent
GRUPO 11 -
Feature #5225: Ajustes finales
Feature #5225: Ajustes finales
Project: GRUPO 11 Status: New Start date: 11/30/2025 Due date: Assignee: Priority: Normal |
1
GRUPO 2 -
Feature #5674: fase 2
Feature #5674: fase 2
Project: GRUPO 2 Status: New Start date: 10/27/2025 Due date: 12/01/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #5727: utilizacion de pybricks par...
Feature #5727: utilizacion de pybricks para la programacion de interfaz grafica y codigo del auto
Project: GRUPO 2 Status: New Start date: 11/12/2025 Due date: 12/01/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #5728: Diseño del sistema de contr...
Feature #5728: Diseño del sistema de control por comandos
Project: GRUPO 2 Status: New Start date: 11/12/2025 Due date: 12/01/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #5729: Programación de movimientos...
Feature #5729: Programación de movimientos básicos
Project: GRUPO 2 Status: New Start date: 11/14/2025 Due date: 12/01/2025 Assignee: Priority: Normal
GRUPO 8 -
Feature #5716: Terminar el codigo de pybri...
Feature #5716: Terminar el codigo de pybricks
Project: GRUPO 8 Status: New Start date: 11/07/2025 Due date: 12/01/2025 Assignee: Sebastian Cahuachia Priority: Normal
GRUPO 1 -
Feature #5126: Maximización de eficiencia ...
Feature #5126: Maximización de eficiencia del robot
Project: GRUPO 1 Status: Resolved Start date: 12/01/2025 Due date: 12/15/2025 Assignee: Alex Campillay Priority: Normal
GRUPO 1 -
Feature #5127: Presentación del Proyecto
Feature #5127: Presentación del Proyecto
Project: GRUPO 1 Status: In Progress Start date: 12/01/2025 Due date: 12/31/2025 Assignee: Bastian Hernandez Priority: High
GRUPO 3 -
Feature #5881: Bitácora semana 11
Feature #5881: Bitácora semana 11
Project: GRUPO 3 Status: Resolved Start date: 12/01/2025 Due date: 12/05/2025 Assignee: Ignacio Cuevas Priority: Normal
GRUPO 6 -
Feature #5807: Completar bitácora N° 11
Feature #5807: Completar bitácora N° 11
Project: GRUPO 6 Status: Resolved Start date: 12/01/2025 Due date: 12/05/2025 Assignee: Francisca Albornoz Priority: Normal |
2
GRUPO 11 -
Feature #5229: Informe final
Feature #5229: Informe final
Project: GRUPO 11 Status: New Start date: 12/02/2025 Due date: 12/31/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #5230: Presentación final
Feature #5230: Presentación final
Project: GRUPO 11 Status: New Start date: 12/02/2025 Due date: 12/31/2025 Assignee: José Terrazas Priority: High |
3
GRUPO 6 -
Feature #5160: Presentacion 1
Feature #5160: Presentacion 1
Project: GRUPO 6 Status: Resolved Start date: 11/17/2025 Due date: 12/03/2025 Assignee: Cristofer Lazaro Priority: Normal
GRUPO 4 -
Feature #6138: Interfaz Grafica y Manual d...
Feature #6138: Interfaz Grafica y Manual de Usuario
Project: GRUPO 4 Status: New Start date: 12/03/2025 Due date: 12/21/2025 Assignee: Jhilmar Solares Priority: High
GRUPO 4 -
Feature #6139: Interfaz Grafica
Feature #6139: Interfaz Grafica
Project: GRUPO 4 Status: New Start date: 12/03/2025 Due date: 12/21/2025 Assignee: Jhilmar Solares Priority: High
GRUPO 5 -
Feature #5688: Creación de la Interfaz
Feature #5688: Creación de la Interfaz
Project: GRUPO 5 Status: Resolved Start date: 12/03/2025 Due date: 12/05/2025 Assignee: Franco Churata Priority: High |
4
GRUPO 8 -
Feature #5717: Termino informe 2
Feature #5717: Termino informe 2
Project: GRUPO 8 Status: New Start date: 11/07/2025 Due date: 12/04/2025 Assignee: Gabriel Delgado Priority: Normal
GRUPO 11 -
Feature #5173: Informe inicial
Feature #5173: Informe inicial
Project: GRUPO 11 Status: Resolved Start date: 11/25/2025 Due date: 12/04/2025 Assignee: Juan-Daniel Castillo Priority: High
GRUPO 11 -
Feature #5972: Crear presentación 1
Feature #5972: Crear presentación 1
Project: GRUPO 11 Status: Resolved Start date: 11/25/2025 Due date: 12/04/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #5973: Correccion de informe
Feature #5973: Correccion de informe
Project: GRUPO 11 Status: Resolved Start date: 11/25/2025 Due date: 12/04/2025 Assignee: José Terrazas Priority: High
GRUPO 7 -
Feature #6015: Crear los materiales de la ...
Feature #6015: Crear los materiales de la pista de obstáculos.
Project: GRUPO 7 Status: New Start date: 12/04/2025 Due date: 12/19/2025 Assignee: Brandon Quispe Priority: Normal
GRUPO 8 -
Feature #5986: Terminar la codificación en...
Feature #5986: Terminar la codificación en visual
Project: GRUPO 8 Status: New Start date: 12/04/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6136: Impresion de obstaculos
Feature #6136: Impresion de obstaculos
Project: GRUPO 10 Status: New Start date: 12/04/2025 Due date: 12/11/2025 Assignee: Priority: Normal |
5
GRUPO 3 -
Feature #5881: Bitácora semana 11
Feature #5881: Bitácora semana 11
Project: GRUPO 3 Status: Resolved Start date: 12/01/2025 Due date: 12/05/2025 Assignee: Ignacio Cuevas Priority: Normal
GRUPO 7 -
Feature #5997: Conexion del Hub a Interfaz
Feature #5997: Conexion del Hub a Interfaz
Project: GRUPO 7 Status: New Start date: 10/24/2025 Due date: 12/05/2025 Assignee: Priority: Normal
GRUPO 9 -
Feature #5256: Investigar el software y lo...
Feature #5256: Investigar el software y los métodos de programación
Project: GRUPO 9 Status: New Start date: 10/17/2025 Due date: 12/05/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6035: Bitacora semana 11
Feature #6035: Bitacora semana 11
Project: GRUPO 10 Status: New Start date: 12/05/2025 Due date: 12/05/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #5688: Creación de la Interfaz
Feature #5688: Creación de la Interfaz
Project: GRUPO 5 Status: Resolved Start date: 12/03/2025 Due date: 12/05/2025 Assignee: Franco Churata Priority: High
GRUPO 6 -
Feature #5807: Completar bitácora N° 11
Feature #5807: Completar bitácora N° 11
Project: GRUPO 6 Status: Resolved Start date: 12/01/2025 Due date: 12/05/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 11 -
Feature #5788: Migracion de IDE
Feature #5788: Migracion de IDE
Project: GRUPO 11 Status: New Start date: 11/14/2025 Due date: 12/05/2025 Assignee: Juan-Daniel Castillo Priority: Normal
GRUPO 11 -
Feature #5797: Interfaz grafica
Feature #5797: Interfaz grafica
Project: GRUPO 11 Status: New Start date: 11/13/2025 Due date: 12/05/2025 Assignee: Alexander Pinto Priority: High
GRUPO 7 -
Feature #6006: Funcionamiento de la interfaz
Feature #6006: Funcionamiento de la interfaz
Project: GRUPO 7 Status: New Start date: 12/05/2025 Due date: 12/25/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6007: Establecimiento de funcion...
Feature #6007: Establecimiento de funciones de movimiento faltantes
Project: GRUPO 7 Status: New Start date: 12/05/2025 Due date: 12/18/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6009: Implementación de sistema d...
Feature #6009: Implementación de sistema de instrucciones mediante socket stream
Project: GRUPO 7 Status: New Start date: 12/05/2025 Due date: 12/20/2025 Assignee: Priority: Normal
GRUPO 9 -
Feature #5982: Preparar presentación oral 2
Feature #5982: Preparar presentación oral 2
Project: GRUPO 9 Status: New Start date: 12/05/2025 Due date: 12/26/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #5158: Trabajar en el informe 2
Feature #5158: Trabajar en el informe 2
Project: GRUPO 6 Status: Feedback Start date: 12/05/2025 Due date: 12/24/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 6 -
Feature #5994: Presentacion 2
Feature #5994: Presentacion 2
Project: GRUPO 6 Status: Resolved Start date: 12/05/2025 Due date: 12/24/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 6 -
Feature #5996: Análisis y Diseño
Feature #5996: Análisis y Diseño
Project: GRUPO 6 Status: Resolved Start date: 12/05/2025 Due date: 12/15/2025 Assignee: Ruth Huanca Priority: Normal |
6
GRUPO 2 -
Feature #6144: Parte 2
Feature #6144: Parte 2
Project: GRUPO 2 Status: New Start date: 12/06/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #6145: Exposición numero 2
Feature #6145: Exposición numero 2
Project: GRUPO 2 Status: New Start date: 12/06/2025 Due date: 12/13/2025 Assignee: Priority: Normal |
| 50 |
7 |
8
GRUPO 5 -
Feature #6061: Ajuste manual de articulaci...
Feature #6061: Ajuste manual de articulaciones
Project: GRUPO 5 Status: Resolved Start date: 12/08/2025 Due date: 12/08/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #6146: Entrega de informe nuemero 2
Feature #6146: Entrega de informe nuemero 2
Project: GRUPO 2 Status: New Start date: 12/08/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #5882: Bitácora semana 12
Feature #5882: Bitácora semana 12
Project: GRUPO 3 Status: Resolved Start date: 12/08/2025 Due date: 12/12/2025 Assignee: Ignacio Cuevas Priority: Normal
GRUPO 4 -
Feature #6140: Manual de Usuario
Feature #6140: Manual de Usuario
Project: GRUPO 4 Status: New Start date: 12/08/2025 Due date: 12/21/2025 Assignee: Daniel Flores Priority: High
GRUPO 5 -
Feature #6024: Complementar Interfaz con e...
Feature #6024: Complementar Interfaz con el código
Project: GRUPO 5 Status: Resolved Start date: 12/08/2025 Due date: 12/10/2025 Assignee: Priority: Urgent
GRUPO 5 -
Feature #6044: Fase 3
Feature #6044: Fase 3
Project: GRUPO 5 Status: In Progress Start date: 12/08/2025 Due date: 12/30/2025 Assignee: Priority: High
GRUPO 5 -
Feature #6049: Ajustes Mecánicos
Feature #6049: Ajustes Mecánicos
Project: GRUPO 5 Status: Resolved Start date: 12/08/2025 Due date: 12/23/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #5810: Completar bitácora N° 12
Feature #5810: Completar bitácora N° 12
Project: GRUPO 6 Status: Resolved Start date: 12/08/2025 Due date: 12/12/2025 Assignee: Francisca Albornoz Priority: Normal |
9 |
10
GRUPO 5 -
Feature #5667: Codificación
Feature #5667: Codificación
Project: GRUPO 5 Status: Resolved Start date: 11/04/2025 Due date: 12/10/2025 Assignee: Priority: Urgent
GRUPO 5 -
Feature #6024: Complementar Interfaz con e...
Feature #6024: Complementar Interfaz con el código
Project: GRUPO 5 Status: Resolved Start date: 12/08/2025 Due date: 12/10/2025 Assignee: Priority: Urgent
GRUPO 6 -
Feature #5241: Control inalámbrico del robot
Feature #5241: Control inalámbrico del robot
Project: GRUPO 6 Status: Resolved Start date: 10/20/2025 Due date: 12/10/2025 Assignee: Brayan Cahuachia Priority: High
GRUPO 6 -
Feature #5775: Interfaz gráfica
Feature #5775: Interfaz gráfica
Project: GRUPO 6 Status: Resolved Start date: 11/14/2025 Due date: 12/10/2025 Assignee: Ruth Huanca Priority: Normal |
11
GRUPO 10 -
Feature #6131: DISEÑO DE OBSTÁCULOS PARA L...
Feature #6131: DISEÑO DE OBSTÁCULOS PARA LA PISTA
Project: GRUPO 10 Status: New Start date: 11/13/2025 Due date: 12/11/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6136: Impresion de obstaculos
Feature #6136: Impresion de obstaculos
Project: GRUPO 10 Status: New Start date: 12/04/2025 Due date: 12/11/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6008: Diseño de otras interfaces
Feature #6008: Diseño de otras interfaces
Project: GRUPO 7 Status: New Start date: 12/11/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6010: Implementación de ejecutable
Feature #6010: Implementación de ejecutable
Project: GRUPO 7 Status: New Start date: 12/11/2025 Due date: 12/20/2025 Assignee: Priority: Normal |
12
GRUPO 1 -
Feature #5120: Avance informe final
Feature #5120: Avance informe final
Project: GRUPO 1 Status: Resolved Start date: 10/17/2025 Due date: 12/12/2025 Assignee: Alex Campillay Priority: Normal
GRUPO 1 -
Feature #5125: Pruebas del Robot
Feature #5125: Pruebas del Robot
Project: GRUPO 1 Status: Resolved Start date: 10/27/2025 Due date: 12/12/2025 Assignee: Alex Campillay Priority: Normal
GRUPO 2 -
Feature #6146: Entrega de informe nuemero 2
Feature #6146: Entrega de informe nuemero 2
Project: GRUPO 2 Status: New Start date: 12/08/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #5882: Bitácora semana 12
Feature #5882: Bitácora semana 12
Project: GRUPO 3 Status: Resolved Start date: 12/08/2025 Due date: 12/12/2025 Assignee: Ignacio Cuevas Priority: Normal
GRUPO 7 -
Feature #6008: Diseño de otras interfaces
Feature #6008: Diseño de otras interfaces
Project: GRUPO 7 Status: New Start date: 12/11/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 8 -
Feature #5986: Terminar la codificación en...
Feature #5986: Terminar la codificación en visual
Project: GRUPO 8 Status: New Start date: 12/04/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6036: Bitacora semana 12
Feature #6036: Bitacora semana 12
Project: GRUPO 10 Status: New Start date: 12/12/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6122: Entrega del Informe 2
Feature #6122: Entrega del Informe 2
Project: GRUPO 10 Status: New Start date: 12/12/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6124: Desarrollo del informe 2
Feature #6124: Desarrollo del informe 2
Project: GRUPO 10 Status: New Start date: 11/21/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6063: Ajuste de la garra
Feature #6063: Ajuste de la garra
Project: GRUPO 5 Status: Resolved Start date: 12/12/2025 Due date: 12/12/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #5810: Completar bitácora N° 12
Feature #5810: Completar bitácora N° 12
Project: GRUPO 6 Status: Resolved Start date: 12/08/2025 Due date: 12/12/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 11 -
Feature #5700: Migrar bloques de código a ...
Feature #5700: Migrar bloques de código a Phyton
Project: GRUPO 11 Status: Resolved Start date: 11/21/2025 Due date: 12/12/2025 Assignee: Juan-Daniel Castillo Priority: High
GRUPO 11 -
Feature #5828: Integración de extensiones ...
Feature #5828: Integración de extensiones y testeo de funcionalidades
Project: GRUPO 11 Status: New Start date: 11/21/2025 Due date: 12/12/2025 Assignee: Juan-Daniel Castillo Priority: High
GRUPO 5 -
Feature #6047: Codificación Final del Sistema
Feature #6047: Codificación Final del Sistema
Project: GRUPO 5 Status: In Progress Start date: 12/12/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6052: Correción de errores detect...
Feature #6052: Correción de errores detectados
Project: GRUPO 5 Status: Resolved Start date: 12/12/2025 Due date: 12/14/2025 Assignee: Priority: Normal |
13
GRUPO 2 -
Feature #6145: Exposición numero 2
Feature #6145: Exposición numero 2
Project: GRUPO 2 Status: New Start date: 12/06/2025 Due date: 12/13/2025 Assignee: Priority: Normal |
| 51 |
14
GRUPO 5 -
Feature #5707: Avance del Informe 2
Feature #5707: Avance del Informe 2
Project: GRUPO 5 Status: Resolved Start date: 11/26/2025 Due date: 12/14/2025 Assignee: Priority: High
GRUPO 5 -
Feature #6052: Correción de errores detect...
Feature #6052: Correción de errores detectados
Project: GRUPO 5 Status: Resolved Start date: 12/12/2025 Due date: 12/14/2025 Assignee: Priority: Normal |
15
GRUPO 1 -
Feature #5123: Ensamblaje
Feature #5123: Ensamblaje
Project: GRUPO 1 Status: Resolved Start date: 10/17/2025 Due date: 12/15/2025 Assignee: Alex Campillay Priority: Normal
GRUPO 1 -
Feature #5126: Maximización de eficiencia ...
Feature #5126: Maximización de eficiencia del robot
Project: GRUPO 1 Status: Resolved Start date: 12/01/2025 Due date: 12/15/2025 Assignee: Alex Campillay Priority: Normal
GRUPO 5 -
Feature #5441: Entrega Informe 2
Feature #5441: Entrega Informe 2
Project: GRUPO 5 Status: Resolved Start date: 12/15/2025 Due date: 12/15/2025 Assignee: Priority: Immediate
GRUPO 5 -
Feature #6059: Prueba general del funciona...
Feature #6059: Prueba general del funcionamiento del Brazo
Project: GRUPO 5 Status: Resolved Start date: 12/15/2025 Due date: 12/15/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #5996: Análisis y Diseño
Feature #5996: Análisis y Diseño
Project: GRUPO 6 Status: Resolved Start date: 12/05/2025 Due date: 12/15/2025 Assignee: Ruth Huanca Priority: Normal
GRUPO 2 -
Feature #6147: avance informe numero 3
Feature #6147: avance informe numero 3
Project: GRUPO 2 Status: New Start date: 12/15/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6028: Bitácora semana 13
Feature #6028: Bitácora semana 13
Project: GRUPO 3 Status: Resolved Start date: 12/15/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6029: Bitácora semana 14
Feature #6029: Bitácora semana 14
Project: GRUPO 3 Status: Resolved Start date: 12/15/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 4 -
Feature #5705: Presentación F2
Feature #5705: Presentación F2
Project: GRUPO 4 Status: New Start date: 12/15/2025 Due date: 12/26/2025 Assignee: Fernanda Tobar Priority: Normal
GRUPO 4 -
Feature #5706: Ppt Fase 2
Feature #5706: Ppt Fase 2
Project: GRUPO 4 Status: New Start date: 12/15/2025 Due date: 12/26/2025 Assignee: Jhilmar Solares Priority: Normal
GRUPO 5 -
Feature #6048: Pruebas Finales
Feature #6048: Pruebas Finales
Project: GRUPO 5 Status: Resolved Start date: 12/15/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #6025: Completar bitácora N° 13
Feature #6025: Completar bitácora N° 13
Project: GRUPO 6 Status: Resolved Start date: 12/15/2025 Due date: 12/19/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 6 -
Feature #6153: Analisis Inicial
Feature #6153: Analisis Inicial
Project: GRUPO 6 Status: Resolved Start date: 12/15/2025 Due date: 12/20/2025 Assignee: Brayan Cahuachia Priority: Normal
GRUPO 6 -
Feature #6159: Arquitectura: cliente-servidor
Feature #6159: Arquitectura: cliente-servidor
Project: GRUPO 6 Status: Resolved Start date: 12/15/2025 Due date: 12/24/2025 Assignee: Abraham Canaviri Priority: Normal |
16
GRUPO 5 -
Feature #6062: Revisión de fijaciones y ejes
Feature #6062: Revisión de fijaciones y ejes
Project: GRUPO 5 Status: Resolved Start date: 12/16/2025 Due date: 12/16/2025 Assignee: Priority: Normal |
17
GRUPO 5 -
Feature #6055: Ajuste de parámetros de mov...
Feature #6055: Ajuste de parámetros de movimiento
Project: GRUPO 5 Status: Resolved Start date: 12/17/2025 Due date: 12/17/2025 Assignee: Priority: Normal |
18
GRUPO 7 -
Feature #6007: Establecimiento de funcion...
Feature #6007: Establecimiento de funciones de movimiento faltantes
Project: GRUPO 7 Status: New Start date: 12/05/2025 Due date: 12/18/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6060: Pruebas de precisión de mov...
Feature #6060: Pruebas de precisión de movimiento
Project: GRUPO 5 Status: Resolved Start date: 12/18/2025 Due date: 12/18/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #5735: Definir la pista
Feature #5735: Definir la pista
Project: GRUPO 6 Status: Resolved Start date: 11/10/2025 Due date: 12/18/2025 Assignee: Cristofer Lazaro Priority: Normal
GRUPO 11 -
Feature #5212: Programación del controlado...
Feature #5212: Programación del controlador externo
Project: GRUPO 11 Status: New Start date: 12/18/2025 Due date: 12/31/2025 Assignee: Javier Echeverria Priority: Urgent |
19
GRUPO 2 -
Feature #6148: testeto de pista y obstaculos
Feature #6148: testeto de pista y obstaculos
Project: GRUPO 2 Status: New Start date: 12/19/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #5644: Bitácoras
Feature #5644: Bitácoras
Project: GRUPO 3 Status: New Start date: 09/22/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6028: Bitácora semana 13
Feature #6028: Bitácora semana 13
Project: GRUPO 3 Status: Resolved Start date: 12/15/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6029: Bitácora semana 14
Feature #6029: Bitácora semana 14
Project: GRUPO 3 Status: Resolved Start date: 12/15/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5968: Creación de repositorio de ...
Feature #5968: Creación de repositorio de código
Project: GRUPO 7 Status: New Start date: 10/23/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5999: Imprimir diseños de los obs...
Feature #5999: Imprimir diseños de los obstáculos
Project: GRUPO 7 Status: New Start date: 11/20/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6015: Crear los materiales de la ...
Feature #6015: Crear los materiales de la pista de obstáculos.
Project: GRUPO 7 Status: New Start date: 12/04/2025 Due date: 12/19/2025 Assignee: Brandon Quispe Priority: Normal
GRUPO 9 -
Feature #5189: Elaborar la bitácoras seman...
Feature #5189: Elaborar la bitácoras semanales (Continua)
Project: GRUPO 9 Status: New Start date: 09/25/2025 Due date: 12/19/2025 Assignee: Dylan Calderon Priority: Normal
GRUPO 9 -
Feature #5197: III. IMPLEMENTACION
Feature #5197: III. IMPLEMENTACION
Project: GRUPO 9 Status: New Start date: 10/17/2025 Due date: 12/19/2025 Assignee: Matias Agriano Priority: Normal
GRUPO 9 -
Feature #5246: Programar Interfaz gráfica
Feature #5246: Programar Interfaz gráfica
Project: GRUPO 9 Status: New Start date: 10/17/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #4949: CONSTRUCCIÓN DEL ROBOT
Feature #4949: CONSTRUCCIÓN DEL ROBOT
Project: GRUPO 10 Status: New Start date: 09/12/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6037: Bitacora semana 13
Feature #6037: Bitacora semana 13
Project: GRUPO 10 Status: New Start date: 12/19/2025 Due date: 12/19/2025 Assignee: Edynson Tola Priority: Normal
GRUPO 10 -
Feature #6110: Investigación del Kit Lego ...
Feature #6110: Investigación del Kit Lego Spike Prime
Project: GRUPO 10 Status: New Start date: 09/12/2025 Due date: 12/19/2025 Assignee: Edynson Tola Priority: Normal
GRUPO 10 -
Feature #6114: BITÁCORAS SEMANALES
Feature #6114: BITÁCORAS SEMANALES
Project: GRUPO 10 Status: New Start date: 09/26/2025 Due date: 12/19/2025 Assignee: Edynson Tola Priority: Normal
GRUPO 5 -
Feature #5183: Fase 2
Feature #5183: Fase 2
Project: GRUPO 5 Status: Resolved Start date: 10/24/2025 Due date: 12/19/2025 Assignee: Priority: Immediate
GRUPO 5 -
Bug #5187: Documentación
Bug #5187: Documentación
Project: GRUPO 5 Status: Resolved Start date: 10/25/2025 Due date: 12/19/2025 Assignee: Priority: Immediate
GRUPO 5 -
Feature #5687: Registro de Bitácoras
Feature #5687: Registro de Bitácoras
Project: GRUPO 5 Status: Resolved Start date: 10/25/2025 Due date: 12/19/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #4900: Completar bitácora
Feature #4900: Completar bitácora
Project: GRUPO 6 Status: In Progress Start date: 09/26/2025 Due date: 12/19/2025 Assignee: Ruth Huanca Priority: Normal
GRUPO 6 -
Feature #6025: Completar bitácora N° 13
Feature #6025: Completar bitácora N° 13
Project: GRUPO 6 Status: Resolved Start date: 12/15/2025 Due date: 12/19/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 11 -
Feature #5786: Garra v1
Feature #5786: Garra v1
Project: GRUPO 11 Status: New Start date: 11/07/2025 Due date: 12/19/2025 Assignee: Javier Echeverria Priority: High
GRUPO 11 -
Feature #5804: Implementar interfaz grafica
Feature #5804: Implementar interfaz grafica
Project: GRUPO 11 Status: New Start date: 11/28/2025 Due date: 12/19/2025 Assignee: Alexander Pinto Priority: Normal
GRUPO 11 -
Feature #5939: Software
Feature #5939: Software
Project: GRUPO 11 Status: New Start date: 11/07/2025 Due date: 12/19/2025 Assignee: Juan-Daniel Castillo Priority: High
GRUPO 5 -
Feature #6054: Creación del manual de usuario
Feature #6054: Creación del manual de usuario
Project: GRUPO 5 Status: Resolved Start date: 12/19/2025 Due date: 12/21/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #6156: Grabacion del robot en la p...
Feature #6156: Grabacion del robot en la pista
Project: GRUPO 6 Status: Resolved Start date: 12/19/2025 Due date: 12/30/2025 Assignee: Abraham Canaviri Priority: Normal |
20
GRUPO 7 -
Feature #5954: PROGRAMACIÓN Y CÓDIGO
Feature #5954: PROGRAMACIÓN Y CÓDIGO
Project: GRUPO 7 Status: New Start date: 10/23/2025 Due date: 12/20/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6009: Implementación de sistema d...
Feature #6009: Implementación de sistema de instrucciones mediante socket stream
Project: GRUPO 7 Status: New Start date: 12/05/2025 Due date: 12/20/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6010: Implementación de ejecutable
Feature #6010: Implementación de ejecutable
Project: GRUPO 7 Status: New Start date: 12/11/2025 Due date: 12/20/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #6153: Analisis Inicial
Feature #6153: Analisis Inicial
Project: GRUPO 6 Status: Resolved Start date: 12/15/2025 Due date: 12/20/2025 Assignee: Brayan Cahuachia Priority: Normal |
| 52 |
21
GRUPO 4 -
Feature #6138: Interfaz Grafica y Manual d...
Feature #6138: Interfaz Grafica y Manual de Usuario
Project: GRUPO 4 Status: New Start date: 12/03/2025 Due date: 12/21/2025 Assignee: Jhilmar Solares Priority: High
GRUPO 4 -
Feature #6139: Interfaz Grafica
Feature #6139: Interfaz Grafica
Project: GRUPO 4 Status: New Start date: 12/03/2025 Due date: 12/21/2025 Assignee: Jhilmar Solares Priority: High
GRUPO 4 -
Feature #6140: Manual de Usuario
Feature #6140: Manual de Usuario
Project: GRUPO 4 Status: New Start date: 12/08/2025 Due date: 12/21/2025 Assignee: Daniel Flores Priority: High
GRUPO 5 -
Feature #6054: Creación del manual de usuario
Feature #6054: Creación del manual de usuario
Project: GRUPO 5 Status: Resolved Start date: 12/19/2025 Due date: 12/21/2025 Assignee: Priority: Normal |
22
GRUPO 4 -
Feature #5708: Preparación para la present...
Feature #5708: Preparación para la presentación.
Project: GRUPO 4 Status: New Start date: 12/22/2025 Due date: 12/26/2025 Assignee: Fernanda Tobar Priority: Normal
GRUPO 6 -
Feature #5995: Informe 3
Feature #5995: Informe 3
Project: GRUPO 6 Status: Feedback Start date: 12/22/2025 Due date: 12/30/2025 Assignee: Ruth Huanca Priority: Normal
GRUPO 6 -
Feature #6157: Descripción de la prueba de...
Feature #6157: Descripción de la prueba de funcionamiento
Project: GRUPO 6 Status: Resolved Start date: 12/22/2025 Due date: 12/30/2025 Assignee: Ruth Huanca Priority: Normal |
23
GRUPO 5 -
Feature #6049: Ajustes Mecánicos
Feature #6049: Ajustes Mecánicos
Project: GRUPO 5 Status: Resolved Start date: 12/08/2025 Due date: 12/23/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6064: Revisión final del montaje
Feature #6064: Revisión final del montaje
Project: GRUPO 5 Status: Resolved Start date: 12/23/2025 Due date: 12/23/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #5776: Creación de los obstáculos
Feature #5776: Creación de los obstáculos
Project: GRUPO 6 Status: Resolved Start date: 11/14/2025 Due date: 12/23/2025 Assignee: Cristofer Lazaro Priority: Normal
GRUPO 5 -
Feature #6056: Optimización del código
Feature #6056: Optimización del código
Project: GRUPO 5 Status: Resolved Start date: 12/23/2025 Due date: 12/26/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #6158: Resultados observados para ...
Feature #6158: Resultados observados para la prueba
Project: GRUPO 6 Status: Resolved Start date: 12/23/2025 Due date: 12/30/2025 Assignee: Brayan Cahuachia Priority: Normal |
24
GRUPO 6 -
Feature #5158: Trabajar en el informe 2
Feature #5158: Trabajar en el informe 2
Project: GRUPO 6 Status: Feedback Start date: 12/05/2025 Due date: 12/24/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 6 -
Feature #5994: Presentacion 2
Feature #5994: Presentacion 2
Project: GRUPO 6 Status: Resolved Start date: 12/05/2025 Due date: 12/24/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 6 -
Feature #6159: Arquitectura: cliente-servidor
Feature #6159: Arquitectura: cliente-servidor
Project: GRUPO 6 Status: Resolved Start date: 12/15/2025 Due date: 12/24/2025 Assignee: Abraham Canaviri Priority: Normal |
25
GRUPO 7 -
Feature #6006: Funcionamiento de la interfaz
Feature #6006: Funcionamiento de la interfaz
Project: GRUPO 7 Status: New Start date: 12/05/2025 Due date: 12/25/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6030: DESARROLLO DE INTERFAZ
Feature #6030: DESARROLLO DE INTERFAZ
Project: GRUPO 7 Status: New Start date: 10/24/2025 Due date: 12/25/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6017: Creación de la pista de obs...
Feature #6017: Creación de la pista de obstáculos
Project: GRUPO 7 Status: New Start date: 12/25/2025 Due date: 12/26/2025 Assignee: Brandon Quispe Priority: Normal
GRUPO 10 -
Feature #6127: Desarrollo del informe 3
Feature #6127: Desarrollo del informe 3
Project: GRUPO 10 Status: New Start date: 12/25/2025 Due date: 12/30/2025 Assignee: Priority: Normal |
26
GRUPO 7 -
Feature #5949: DISEÑO DE PISTA DE OBSTÁCULOS
Feature #5949: DISEÑO DE PISTA DE OBSTÁCULOS
Project: GRUPO 7 Status: New Start date: 11/20/2025 Due date: 12/26/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #6017: Creación de la pista de obs...
Feature #6017: Creación de la pista de obstáculos
Project: GRUPO 7 Status: New Start date: 12/25/2025 Due date: 12/26/2025 Assignee: Brandon Quispe Priority: Normal
GRUPO 9 -
Feature #5208: Redactar el informe 2
Feature #5208: Redactar el informe 2
Project: GRUPO 9 Status: New Start date: 11/21/2025 Due date: 12/26/2025 Assignee: Benjamin Sucso Priority: Normal
GRUPO 9 -
Feature #5982: Preparar presentación oral 2
Feature #5982: Preparar presentación oral 2
Project: GRUPO 9 Status: New Start date: 12/05/2025 Due date: 12/26/2025 Assignee: Priority: Normal
GRUPO 4 -
Feature #5668: Fase 2
Feature #5668: Fase 2
Project: GRUPO 4 Status: New Start date: 11/03/2025 Due date: 12/26/2025 Assignee: Guillermo Contreras Priority: High
GRUPO 4 -
Feature #5675: Documentación Fase 2
Feature #5675: Documentación Fase 2
Project: GRUPO 4 Status: New Start date: 11/03/2025 Due date: 12/26/2025 Assignee: ariel colque Priority: High
GRUPO 4 -
Feature #5676: Bitácoras F2
Feature #5676: Bitácoras F2
Project: GRUPO 4 Status: New Start date: 11/03/2025 Due date: 12/26/2025 Assignee: Guillermo Contreras Priority: Normal
GRUPO 4 -
Feature #5678: Actualización Informe F2
Feature #5678: Actualización Informe F2
Project: GRUPO 4 Status: New Start date: 11/12/2025 Due date: 12/26/2025 Assignee: ariel colque Priority: High
GRUPO 4 -
Feature #5705: Presentación F2
Feature #5705: Presentación F2
Project: GRUPO 4 Status: New Start date: 12/15/2025 Due date: 12/26/2025 Assignee: Fernanda Tobar Priority: Normal
GRUPO 4 -
Feature #5706: Ppt Fase 2
Feature #5706: Ppt Fase 2
Project: GRUPO 4 Status: New Start date: 12/15/2025 Due date: 12/26/2025 Assignee: Jhilmar Solares Priority: Normal
GRUPO 4 -
Feature #5708: Preparación para la present...
Feature #5708: Preparación para la presentación.
Project: GRUPO 4 Status: New Start date: 12/22/2025 Due date: 12/26/2025 Assignee: Fernanda Tobar Priority: Normal
GRUPO 5 -
Feature #6056: Optimización del código
Feature #6056: Optimización del código
Project: GRUPO 5 Status: Resolved Start date: 12/23/2025 Due date: 12/26/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6142: Realizar informe final
Feature #6142: Realizar informe final
Project: GRUPO 3 Status: Resolved Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6143: Realizar la presentacion fi...
Feature #6143: Realizar la presentacion final del proyecto
Project: GRUPO 3 Status: Resolved Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 9 -
Feature #6141: Redactar el informe 3
Feature #6141: Redactar el informe 3
Project: GRUPO 9 Status: New Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 4 -
Feature #6109: Fase 3
Feature #6109: Fase 3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Priority: Urgent
GRUPO 4 -
Feature #6112: Documentación Fase 3
Feature #6112: Documentación Fase 3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Urgent
GRUPO 4 -
Feature #6113: Informe 3 F3
Feature #6113: Informe 3 F3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Urgent
GRUPO 4 -
Feature #6121: Presentacion F3
Feature #6121: Presentacion F3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Urgent
GRUPO 4 -
Feature #6123: Ppt Fase 3
Feature #6123: Ppt Fase 3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Normal
GRUPO 6 -
Feature #6154: Presentacion 3
Feature #6154: Presentacion 3
Project: GRUPO 6 Status: Feedback Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Francisca Albornoz Priority: Normal |
27
GRUPO 4 -
Feature #6125: Preparación para la present...
Feature #6125: Preparación para la presentación F3.
Project: GRUPO 4 Status: New Start date: 12/27/2025 Due date: 12/29/2025 Assignee: Jhilmar Solares Priority: Urgent
GRUPO 5 -
Feature #6045: Documentación Final
Feature #6045: Documentación Final
Project: GRUPO 5 Status: Resolved Start date: 12/27/2025 Due date: 12/30/2025 Assignee: Priority: High
GRUPO 5 -
Feature #6057: Avance del informe 3
Feature #6057: Avance del informe 3
Project: GRUPO 5 Status: Resolved Start date: 12/27/2025 Due date: 12/29/2025 Assignee: Priority: Normal |
| 1 |
28
GRUPO 5 -
Feature #6046: Presentación y Evaluación
Feature #6046: Presentación y Evaluación
Project: GRUPO 5 Status: Resolved Start date: 12/28/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6051: Preparación de Presentación
Feature #6051: Preparación de Presentación
Project: GRUPO 5 Status: Resolved Start date: 12/28/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 11 -
Feature #6000: Informe 2
Feature #6000: Informe 2
Project: GRUPO 11 Status: New Start date: 12/28/2025 Due date: 12/30/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #6042: Crear presentacion 2
Feature #6042: Crear presentacion 2
Project: GRUPO 11 Status: New Start date: 12/28/2025 Due date: 12/30/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #6043: Correccion de informe 2
Feature #6043: Correccion de informe 2
Project: GRUPO 11 Status: New Start date: 12/28/2025 Due date: 12/30/2025 Assignee: José Terrazas Priority: High |
29
GRUPO 7 -
Feature #5959: PRUEBAS Y AJUSTES
Feature #5959: PRUEBAS Y AJUSTES
Project: GRUPO 7 Status: New Start date: 10/23/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5960: Pruebas de movimiento y giros
Feature #5960: Pruebas de movimiento y giros
Project: GRUPO 7 Status: New Start date: 10/24/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5961: Identificación y corrección...
Feature #5961: Identificación y corrección de errores
Project: GRUPO 7 Status: New Start date: 10/23/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5962: Pruebas finales en pista de...
Feature #5962: Pruebas finales en pista de obstáculos
Project: GRUPO 7 Status: New Start date: 12/29/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5964: Desarrollo de bitácoras sem...
Feature #5964: Desarrollo de bitácoras semanales
Project: GRUPO 7 Status: New Start date: 10/02/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5965: Elaboración y corrección de...
Feature #5965: Elaboración y corrección de informes
Project: GRUPO 7 Status: New Start date: 10/17/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5967: Entrega de entregables
Feature #5967: Entrega de entregables
Project: GRUPO 7 Status: New Start date: 10/30/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6128: Entrega del informe 3
Feature #6128: Entrega del informe 3
Project: GRUPO 10 Status: New Start date: 12/29/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 4 -
Feature #6109: Fase 3
Feature #6109: Fase 3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Priority: Urgent
GRUPO 4 -
Feature #6112: Documentación Fase 3
Feature #6112: Documentación Fase 3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Urgent
GRUPO 4 -
Feature #6113: Informe 3 F3
Feature #6113: Informe 3 F3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Urgent
GRUPO 4 -
Feature #6121: Presentacion F3
Feature #6121: Presentacion F3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Urgent
GRUPO 4 -
Feature #6123: Ppt Fase 3
Feature #6123: Ppt Fase 3
Project: GRUPO 4 Status: New Start date: 12/26/2025 Due date: 12/29/2025 Assignee: Guillermo Contreras Priority: Normal
GRUPO 4 -
Feature #6125: Preparación para la present...
Feature #6125: Preparación para la presentación F3.
Project: GRUPO 4 Status: New Start date: 12/27/2025 Due date: 12/29/2025 Assignee: Jhilmar Solares Priority: Urgent
GRUPO 5 -
Feature #6047: Codificación Final del Sistema
Feature #6047: Codificación Final del Sistema
Project: GRUPO 5 Status: In Progress Start date: 12/12/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6048: Pruebas Finales
Feature #6048: Pruebas Finales
Project: GRUPO 5 Status: Resolved Start date: 12/15/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6053: Versión final del programa
Feature #6053: Versión final del programa
Project: GRUPO 5 Status: Resolved Start date: 12/29/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6057: Avance del informe 3
Feature #6057: Avance del informe 3
Project: GRUPO 5 Status: Resolved Start date: 12/27/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6065: Prueba final de funcionamie...
Feature #6065: Prueba final de funcionamiento del Brazo
Project: GRUPO 5 Status: Resolved Start date: 12/29/2025 Due date: 12/29/2025 Assignee: Priority: Normal
GRUPO 9 -
Feature #5257: Demostrar el producto final
Feature #5257: Demostrar el producto final
Project: GRUPO 9 Status: New Start date: 12/29/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #6155: Ultima prueba del robot en ...
Feature #6155: Ultima prueba del robot en la pista
Project: GRUPO 6 Status: Resolved Start date: 12/29/2025 Due date: 12/30/2025 Assignee: Cristofer Lazaro Priority: Normal
GRUPO 11 -
Feature #6005: Desarrollo de Controlador p...
Feature #6005: Desarrollo de Controlador por Mando
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: High
GRUPO 11 -
Feature #6103: Video de prueba del funcio...
Feature #6103: Video de prueba del funcionamiento del robot
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: Urgent
GRUPO 11 -
Feature #6104: Validación de requerimiento...
Feature #6104: Validación de requerimientos funcioanles
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Alexander Pinto Priority: High
GRUPO 11 -
Feature #6105: Desarrollo de interfaz gráf...
Feature #6105: Desarrollo de interfaz gráfica para Mando
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Alexander Pinto Priority: High
GRUPO 11 -
Feature #6106: Integración final del siste...
Feature #6106: Integración final del sistema robótico
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: Urgent |
30
GRUPO 1 -
Feature #5118: Documentacion
Feature #5118: Documentacion
Project: GRUPO 1 Status: Resolved Start date: 10/17/2025 Due date: 12/30/2025 Assignee: Priority: High
GRUPO 1 -
Feature #5122: Entrega Informe Final
Feature #5122: Entrega Informe Final
Project: GRUPO 1 Status: Resolved Start date: 11/17/2025 Due date: 12/30/2025 Assignee: Marcos Caldas Priority: High
GRUPO 2 -
Feature #6144: Parte 2
Feature #6144: Parte 2
Project: GRUPO 2 Status: New Start date: 12/06/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #6147: avance informe numero 3
Feature #6147: avance informe numero 3
Project: GRUPO 2 Status: New Start date: 12/15/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #6149: Finalizacion
Feature #6149: Finalizacion
Project: GRUPO 2 Status: New Start date: 12/30/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #6150: Exposicion numero 3
Feature #6150: Exposicion numero 3
Project: GRUPO 2 Status: New Start date: 12/30/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #6151: entrega de informe numero 3
Feature #6151: entrega de informe numero 3
Project: GRUPO 2 Status: New Start date: 12/30/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 2 -
Feature #6152: manual de usuario
Feature #6152: manual de usuario
Project: GRUPO 2 Status: New Start date: 12/30/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6142: Realizar informe final
Feature #6142: Realizar informe final
Project: GRUPO 3 Status: Resolved Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 3 -
Feature #6143: Realizar la presentacion fi...
Feature #6143: Realizar la presentacion final del proyecto
Project: GRUPO 3 Status: Resolved Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5963: DOCUMENTACIÓN Y ENTREGA
Feature #5963: DOCUMENTACIÓN Y ENTREGA
Project: GRUPO 7 Status: New Start date: 10/02/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 7 -
Feature #5966: Preparación de presentación
Feature #5966: Preparación de presentación
Project: GRUPO 7 Status: New Start date: 11/20/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 9 -
Feature #5203: IV. DOCUMENTACIÓN Y CIERRE
Feature #5203: IV. DOCUMENTACIÓN Y CIERRE
Project: GRUPO 9 Status: New Start date: 09/25/2025 Due date: 12/30/2025 Assignee: Dylan Calderon Priority: Normal
GRUPO 9 -
Feature #5257: Demostrar el producto final
Feature #5257: Demostrar el producto final
Project: GRUPO 9 Status: New Start date: 12/29/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 9 -
Feature #6141: Redactar el informe 3
Feature #6141: Redactar el informe 3
Project: GRUPO 9 Status: New Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 10 -
Feature #6120: INFORMES Y EXPOSICIONES
Feature #6120: INFORMES Y EXPOSICIONES
Project: GRUPO 10 Status: New Start date: 10/02/2025 Due date: 12/30/2025 Assignee: Priority: High
GRUPO 10 -
Feature #6127: Desarrollo del informe 3
Feature #6127: Desarrollo del informe 3
Project: GRUPO 10 Status: New Start date: 12/25/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6044: Fase 3
Feature #6044: Fase 3
Project: GRUPO 5 Status: In Progress Start date: 12/08/2025 Due date: 12/30/2025 Assignee: Priority: High
GRUPO 5 -
Feature #6045: Documentación Final
Feature #6045: Documentación Final
Project: GRUPO 5 Status: Resolved Start date: 12/27/2025 Due date: 12/30/2025 Assignee: Priority: High
GRUPO 5 -
Feature #6046: Presentación y Evaluación
Feature #6046: Presentación y Evaluación
Project: GRUPO 5 Status: Resolved Start date: 12/28/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6050: Entrega Informe 3
Feature #6050: Entrega Informe 3
Project: GRUPO 5 Status: Resolved Start date: 12/30/2025 Due date: 12/30/2025 Assignee: Priority: High
GRUPO 5 -
Feature #6051: Preparación de Presentación
Feature #6051: Preparación de Presentación
Project: GRUPO 5 Status: Resolved Start date: 12/28/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 5 -
Feature #6058: Presentación final del Proy...
Feature #6058: Presentación final del Proyecto
Project: GRUPO 5 Status: Resolved Start date: 12/30/2025 Due date: 12/30/2025 Assignee: Priority: Normal
GRUPO 6 -
Feature #5734: Pista
Feature #5734: Pista
Project: GRUPO 6 Status: In Progress Start date: 11/10/2025 Due date: 12/30/2025 Assignee: Cristofer Lazaro Priority: Normal
GRUPO 6 -
Feature #5995: Informe 3
Feature #5995: Informe 3
Project: GRUPO 6 Status: Feedback Start date: 12/22/2025 Due date: 12/30/2025 Assignee: Ruth Huanca Priority: Normal
GRUPO 6 -
Feature #6154: Presentacion 3
Feature #6154: Presentacion 3
Project: GRUPO 6 Status: Feedback Start date: 12/26/2025 Due date: 12/30/2025 Assignee: Francisca Albornoz Priority: Normal
GRUPO 6 -
Feature #6155: Ultima prueba del robot en ...
Feature #6155: Ultima prueba del robot en la pista
Project: GRUPO 6 Status: Resolved Start date: 12/29/2025 Due date: 12/30/2025 Assignee: Cristofer Lazaro Priority: Normal
GRUPO 6 -
Feature #6156: Grabacion del robot en la p...
Feature #6156: Grabacion del robot en la pista
Project: GRUPO 6 Status: Resolved Start date: 12/19/2025 Due date: 12/30/2025 Assignee: Abraham Canaviri Priority: Normal
GRUPO 6 -
Feature #6157: Descripción de la prueba de...
Feature #6157: Descripción de la prueba de funcionamiento
Project: GRUPO 6 Status: Resolved Start date: 12/22/2025 Due date: 12/30/2025 Assignee: Ruth Huanca Priority: Normal
GRUPO 6 -
Feature #6158: Resultados observados para ...
Feature #6158: Resultados observados para la prueba
Project: GRUPO 6 Status: Resolved Start date: 12/23/2025 Due date: 12/30/2025 Assignee: Brayan Cahuachia Priority: Normal
GRUPO 11 -
Feature #6000: Informe 2
Feature #6000: Informe 2
Project: GRUPO 11 Status: New Start date: 12/28/2025 Due date: 12/30/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #6042: Crear presentacion 2
Feature #6042: Crear presentacion 2
Project: GRUPO 11 Status: New Start date: 12/28/2025 Due date: 12/30/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #6043: Correccion de informe 2
Feature #6043: Correccion de informe 2
Project: GRUPO 11 Status: New Start date: 12/28/2025 Due date: 12/30/2025 Assignee: José Terrazas Priority: High
GRUPO 12 -
Feature #6076: Presentación final.
Feature #6076: Presentación final.
Project: GRUPO 12 Status: New Start date: 12/30/2025 Due date: 12/30/2025 Assignee: Jerry Quiroga Priority: High |
31
GRUPO 1 -
Feature #5117: Fase 2
Feature #5117: Fase 2
Project: GRUPO 1 Status: Resolved Start date: 10/17/2025 Due date: 12/31/2025 Assignee: Priority: High
GRUPO 1 -
Feature #5127: Presentación del Proyecto
Feature #5127: Presentación del Proyecto
Project: GRUPO 1 Status: In Progress Start date: 12/01/2025 Due date: 12/31/2025 Assignee: Bastian Hernandez Priority: High
GRUPO 11 -
Feature #5171: Documentación
Feature #5171: Documentación
Project: GRUPO 11 Status: Resolved Start date: 11/25/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: High
GRUPO 11 -
Feature #5188: Pruebas del prototipo
Feature #5188: Pruebas del prototipo
Project: GRUPO 11 Status: In Progress Start date: 10/10/2025 Due date: 12/31/2025 Assignee: Priority: Urgent
GRUPO 11 -
Feature #5210: Codificación
Feature #5210: Codificación
Project: GRUPO 11 Status: Resolved Start date: 10/25/2025 Due date: 12/31/2025 Assignee: Javier Echeverria Priority: Urgent
GRUPO 11 -
Feature #5212: Programación del controlado...
Feature #5212: Programación del controlador externo
Project: GRUPO 11 Status: New Start date: 12/18/2025 Due date: 12/31/2025 Assignee: Javier Echeverria Priority: Urgent
GRUPO 11 -
Feature #5224: Optimización
Feature #5224: Optimización
Project: GRUPO 11 Status: New Start date: 11/30/2025 Due date: 12/31/2025 Assignee: Priority: Urgent
GRUPO 11 -
Feature #5229: Informe final
Feature #5229: Informe final
Project: GRUPO 11 Status: New Start date: 12/02/2025 Due date: 12/31/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #5230: Presentación final
Feature #5230: Presentación final
Project: GRUPO 11 Status: New Start date: 12/02/2025 Due date: 12/31/2025 Assignee: José Terrazas Priority: High
GRUPO 11 -
Feature #6005: Desarrollo de Controlador p...
Feature #6005: Desarrollo de Controlador por Mando
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: High
GRUPO 11 -
Bug #6031: Desarrollo de Controlador p...
Bug #6031: Desarrollo de Controlador por Teclado
Project: GRUPO 11 Status: New Start date: 12/18/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: Urgent
GRUPO 11 -
Feature #6103: Video de prueba del funcio...
Feature #6103: Video de prueba del funcionamiento del robot
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: Urgent
GRUPO 11 -
Feature #6104: Validación de requerimiento...
Feature #6104: Validación de requerimientos funcioanles
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Alexander Pinto Priority: High
GRUPO 11 -
Feature #6105: Desarrollo de interfaz gráf...
Feature #6105: Desarrollo de interfaz gráfica para Mando
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Alexander Pinto Priority: High
GRUPO 11 -
Feature #6106: Integración final del siste...
Feature #6106: Integración final del sistema robótico
Project: GRUPO 11 Status: New Start date: 12/29/2025 Due date: 12/31/2025 Assignee: Juan-Daniel Castillo Priority: Urgent |