Calendar
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | |
---|---|---|---|---|---|---|---|
35 |
26 |
27 |
28
Grupo 1 2018 -
Feature #244: Estudio de la Librería ev3d...
Feature #244: Estudio de la Librería ev3devlang-python
Project: Grupo 1 2018 Status: New Start date: 08/23/2018 Due date: 08/28/2018 Assignee: Miguel Rivero Priority: Normal
Grupo 4 2018 -
Feature #428: Informe Plan de Proyecto
Feature #428: Informe Plan de Proyecto
Project: Grupo 4 2018 Status: New Start date: 08/16/2018 Due date: 08/28/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Support #223: Adquirir las piezas del Robot
Support #223: Adquirir las piezas del Robot
Project: Grupo 5 2018 Status: New Start date: 08/21/2018 Due date: 08/28/2018 Assignee: Jonathan Bravo Priority: Normal
Grupo 5 2018 -
Support #229: Instalacion del S.O ev3dev
Support #229: Instalacion del S.O ev3dev
Project: Grupo 5 2018 Status: New Start date: 08/28/2018 Due date: 08/30/2018 Assignee: Priority: Normal
Grupo 6 2018 -
Feature #251: Informe 1
Feature #251: Informe 1
Project: Grupo 6 2018 Status: New Start date: 08/28/2018 Due date: 09/06/2018 Assignee: Nicolas Vargas Priority: High
Grupo 6 2018 -
Support #252: Aprender Python
Support #252: Aprender Python
Project: Grupo 6 2018 Status: New Start date: 08/28/2018 Due date: 09/13/2018 Assignee: Priority: Normal |
29 |
30
Grupo 1 2018 -
Feature #212: Armado del Robot EV3
Feature #212: Armado del Robot EV3
Project: Grupo 1 2018 Status: New Start date: 08/21/2018 Due date: 08/30/2018 Assignee: Diego Berrios Priority: Normal
Grupo 3 2018 -
Feature #399: Construcción del Robot EV3
Feature #399: Construcción del Robot EV3
Project: Grupo 3 2018 Status: Resolved Start date: 08/09/2018 Due date: 08/30/2018 Assignee: Esteban Ovando Priority: Normal
Grupo 3 2018 -
Feature #402: Ensamblaje del Robot.
Feature #402: Ensamblaje del Robot.
Project: Grupo 3 2018 Status: Resolved Start date: 08/21/2018 Due date: 08/30/2018 Assignee: Priority: Normal
Grupo 4 2018 -
Feature #419: Construcción Robot EV3
Feature #419: Construcción Robot EV3
Project: Grupo 4 2018 Status: New Start date: 08/21/2018 Due date: 08/30/2018 Assignee: Cristian Baustista Priority: High
Grupo 4 2018 -
Feature #433: Gestión de Riesgos
Feature #433: Gestión de Riesgos
Project: Grupo 4 2018 Status: New Start date: 08/14/2018 Due date: 08/30/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Feature #222: Ensamblado del Robot
Feature #222: Ensamblado del Robot
Project: Grupo 5 2018 Status: New Start date: 08/21/2018 Due date: 08/30/2018 Assignee: Jeremy Gaete Priority: Normal
Grupo 5 2018 -
Feature #224: Armar el Robot
Feature #224: Armar el Robot
Project: Grupo 5 2018 Status: New Start date: 08/23/2018 Due date: 08/30/2018 Assignee: Jeremy Gaete Priority: Normal
Grupo 5 2018 -
Support #229: Instalacion del S.O ev3dev
Support #229: Instalacion del S.O ev3dev
Project: Grupo 5 2018 Status: New Start date: 08/28/2018 Due date: 08/30/2018 Assignee: Priority: Normal
Grupo 1 2018 -
Feature #264: Presentación I
Feature #264: Presentación I
Project: Grupo 1 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Scarlett Oswald Priority: Normal
Grupo 1 2018 -
Bug #312: Pruebas
Bug #312: Pruebas
Project: Grupo 1 2018 Status: New Start date: 08/30/2018 Due date: 11/27/2018 Assignee: Diego Berrios Priority: Normal
Grupo 1 2018 -
Feature #313: Prueba 1
Feature #313: Prueba 1
Project: Grupo 1 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Diego Berrios Priority: Normal
Grupo 2 2018 -
Feature #262: Realizar Presentación
Feature #262: Realizar Presentación
Project: Grupo 2 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 3 2018 -
Support #379: Desarrollo de la wiki
Support #379: Desarrollo de la wiki
Project: Grupo 3 2018 Status: In Progress Start date: 08/30/2018 Due date: 11/15/2018 Assignee: Pedro Araya Priority: Normal
Grupo 3 2018 -
Feature #381: Carta Gantt
Feature #381: Carta Gantt
Project: Grupo 3 2018 Status: Resolved Start date: 08/30/2018 Due date: 09/11/2018 Assignee: Gabriel Echeverria Priority: Normal
Grupo 3 2018 -
Feature #391: Programación del Brick Ev3
Feature #391: Programación del Brick Ev3
Project: Grupo 3 2018 Status: In Progress Start date: 08/30/2018 Due date: 11/22/2018 Assignee: Nicolas Colque Priority: Normal
Grupo 3 2018 -
Feature #392: Instalación del sistema ope...
Feature #392: Instalación del sistema operativo
Project: Grupo 3 2018 Status: Resolved Start date: 08/30/2018 Due date: 09/04/2018 Assignee: Nicolas Colque Priority: Normal
Grupo 6 2018 -
Feature #375: Realizar Wiki
Feature #375: Realizar Wiki
Project: Grupo 6 2018 Status: New Start date: 08/30/2018 Due date: 11/22/2018 Assignee: David Orellana Priority: Normal
Grupo 6 2018 -
Feature #376: Aprender html
Feature #376: Aprender html
Project: Grupo 6 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: David Orellana Priority: Normal
Grupo 6 2018 -
Support #385: Programación del Robot
Support #385: Programación del Robot
Project: Grupo 6 2018 Status: New Start date: 08/30/2018 Due date: 10/25/2018 Assignee: Nicolas Vargas Priority: High
Grupo 6 2018 -
Bug #388: Conexión Computador Robot
Bug #388: Conexión Computador Robot
Project: Grupo 6 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Nicolas Vargas Priority: High |
31 |
1 |
36 |
2 |
3
Grupo 2 2018 -
Feature #267: Formulación de Proyecto
Feature #267: Formulación de Proyecto
Project: Grupo 2 2018 Status: In Progress Start date: 08/23/2018 Due date: 09/03/2018 Assignee: Matias Sandoval Priority: Normal |
4
Grupo 1 2018 -
Bug #331: Estudio del Lenguaje de Pro...
Bug #331: Estudio del Lenguaje de Programación Python
Project: Grupo 1 2018 Status: New Start date: 08/23/2018 Due date: 09/04/2018 Assignee: Miguel Rivero Priority: Normal
Grupo 2 2018 -
Feature #239: Estudiar Algoritmos Cubo
Feature #239: Estudiar Algoritmos Cubo
Project: Grupo 2 2018 Status: In Progress Start date: 08/23/2018 Due date: 09/04/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 2 2018 -
Feature #240: Pruebas Estructura Robot
Feature #240: Pruebas Estructura Robot
Project: Grupo 2 2018 Status: In Progress Start date: 08/23/2018 Due date: 09/04/2018 Assignee: Nicolas Jorquera Priority: Normal
Grupo 3 2018 -
Feature #392: Instalación del sistema ope...
Feature #392: Instalación del sistema operativo
Project: Grupo 3 2018 Status: Resolved Start date: 08/30/2018 Due date: 09/04/2018 Assignee: Nicolas Colque Priority: Normal
Grupo 1 2018 -
Feature #261: Adaptación del Movimiento d...
Feature #261: Adaptación del Movimiento del Robot
Project: Grupo 1 2018 Status: New Start date: 09/04/2018 Due date: 09/27/2018 Assignee: Diego Berrios Priority: Normal
Grupo 1 2018 -
Feature #317: Programación
Feature #317: Programación
Project: Grupo 1 2018 Status: New Start date: 09/04/2018 Due date: 11/27/2018 Assignee: Miguel Rivero Priority: Normal
Grupo 1 2018 -
Feature #318: Programación de los Algorit...
Feature #318: Programación de los Algoritmos Rubik
Project: Grupo 1 2018 Status: New Start date: 09/04/2018 Due date: 11/27/2018 Assignee: Miguel Rivero Priority: Normal
Grupo 3 2018 -
Feature #394: Investigación de Python y l...
Feature #394: Investigación de Python y librería ev3dev-lang-python.
Project: Grupo 3 2018 Status: Resolved Start date: 09/04/2018 Due date: 09/06/2018 Assignee: Nicolas Colque Priority: Normal
Grupo 4 2018 -
Feature #422: Programación
Feature #422: Programación
Project: Grupo 4 2018 Status: New Start date: 09/04/2018 Due date: 11/29/2018 Assignee: Priority: High
Grupo 4 2018 -
Feature #423: Estudio del Lenguaje de Pro...
Feature #423: Estudio del Lenguaje de Programación Python
Project: Grupo 4 2018 Status: New Start date: 09/04/2018 Due date: 09/13/2018 Assignee: Priority: High
Grupo 4 2018 -
Feature #424: Estudio de la Librería ev3dev
Feature #424: Estudio de la Librería ev3dev
Project: Grupo 4 2018 Status: New Start date: 09/04/2018 Due date: 09/13/2018 Assignee: Priority: High
Grupo 4 2018 -
Feature #429: Presentación I
Feature #429: Presentación I
Project: Grupo 4 2018 Status: New Start date: 09/04/2018 Due date: 09/12/2018 Assignee: Priority: Normal |
5 |
6
Grupo 1 2018 -
Feature #201: Formulación del Proyecto pa...
Feature #201: Formulación del Proyecto parte I
Project: Grupo 1 2018 Status: New Start date: 08/16/2018 Due date: 09/06/2018 Assignee: Priority: Normal
Grupo 1 2018 -
Feature #264: Presentación I
Feature #264: Presentación I
Project: Grupo 1 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Scarlett Oswald Priority: Normal
Grupo 1 2018 -
Feature #266: Informe I
Feature #266: Informe I
Project: Grupo 1 2018 Status: New Start date: 08/16/2018 Due date: 09/06/2018 Assignee: Priority: Normal
Grupo 1 2018 -
Feature #313: Prueba 1
Feature #313: Prueba 1
Project: Grupo 1 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Diego Berrios Priority: Normal
Grupo 2 2018 -
Feature #238: Proyecto: Parte 2
Feature #238: Proyecto: Parte 2
Project: Grupo 2 2018 Status: In Progress Start date: 08/23/2018 Due date: 09/06/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 2 2018 -
Feature #241: Ampliar Conocimiento Python
Feature #241: Ampliar Conocimiento Python
Project: Grupo 2 2018 Status: In Progress Start date: 08/23/2018 Due date: 09/06/2018 Assignee: José Ignacio Le Blanc Priority: Normal
Grupo 2 2018 -
Feature #242: Ideas Previas Aplicación
Feature #242: Ideas Previas Aplicación
Project: Grupo 2 2018 Status: In Progress Start date: 08/23/2018 Due date: 09/06/2018 Assignee: Luis Soto Priority: Normal
Grupo 2 2018 -
Feature #262: Realizar Presentación
Feature #262: Realizar Presentación
Project: Grupo 2 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 3 2018 -
Feature #394: Investigación de Python y l...
Feature #394: Investigación de Python y librería ev3dev-lang-python.
Project: Grupo 3 2018 Status: Resolved Start date: 09/04/2018 Due date: 09/06/2018 Assignee: Nicolas Colque Priority: Normal
Grupo 6 2018 -
Feature #211: Armar Robot
Feature #211: Armar Robot
Project: Grupo 6 2018 Status: New Start date: 08/21/2018 Due date: 09/06/2018 Assignee: Nicolas Vargas Priority: High
Grupo 6 2018 -
Feature #251: Informe 1
Feature #251: Informe 1
Project: Grupo 6 2018 Status: New Start date: 08/28/2018 Due date: 09/06/2018 Assignee: Nicolas Vargas Priority: High
Grupo 6 2018 -
Feature #376: Aprender html
Feature #376: Aprender html
Project: Grupo 6 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: David Orellana Priority: Normal
Grupo 6 2018 -
Bug #388: Conexión Computador Robot
Bug #388: Conexión Computador Robot
Project: Grupo 6 2018 Status: New Start date: 08/30/2018 Due date: 09/06/2018 Assignee: Nicolas Vargas Priority: High
Grupo 2 2018 -
Feature #263: Exponer Proyecto
Feature #263: Exponer Proyecto
Project: Grupo 2 2018 Status: New Start date: 09/06/2018 Due date: 09/11/2018 Assignee: Nicolas Jorquera Priority: Normal
Grupo 6 2018 -
Feature #253: Presentacion 1
Feature #253: Presentacion 1
Project: Grupo 6 2018 Status: New Start date: 09/06/2018 Due date: 09/13/2018 Assignee: Nicolas Vargas Priority: High
Grupo 6 2018 -
Bug #307: Buscar algoritmos del movim...
Bug #307: Buscar algoritmos del movimiento del Cubo Rubik
Project: Grupo 6 2018 Status: New Start date: 09/06/2018 Due date: 09/27/2018 Assignee: David Orellana Priority: Normal |
7 |
8 |
37 |
9
Grupo 5 2018 -
Feature #442: Informe I
Feature #442: Informe I
Project: Grupo 5 2018 Status: New Start date: 09/09/2018 Due date: 09/13/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Bug #444: Presentación I
Bug #444: Presentación I
Project: Grupo 5 2018 Status: New Start date: 09/09/2018 Due date: 09/13/2018 Assignee: Scarlet Gavia Mondaca Priority: Normal |
10 |
11
Grupo 2 2018 -
Feature #256: Proyecto: Parte 3
Feature #256: Proyecto: Parte 3
Project: Grupo 2 2018 Status: In Progress Start date: 08/23/2018 Due date: 09/11/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 2 2018 -
Feature #263: Exponer Proyecto
Feature #263: Exponer Proyecto
Project: Grupo 2 2018 Status: New Start date: 09/06/2018 Due date: 09/11/2018 Assignee: Nicolas Jorquera Priority: Normal
Grupo 3 2018 -
Feature #381: Carta Gantt
Feature #381: Carta Gantt
Project: Grupo 3 2018 Status: Resolved Start date: 08/30/2018 Due date: 09/11/2018 Assignee: Gabriel Echeverria Priority: Normal
Grupo 3 2018 -
Feature #382: Formulación del proyecto
Feature #382: Formulación del proyecto
Project: Grupo 3 2018 Status: Resolved Start date: 08/16/2018 Due date: 09/11/2018 Assignee: Gabriel Echeverria Priority: Normal
Grupo 4 2018 -
Feature #434: Costeo
Feature #434: Costeo
Project: Grupo 4 2018 Status: New Start date: 09/11/2018 Due date: 09/13/2018 Assignee: Christian Caceres Priority: Normal
Grupo 5 2018 -
Support #230: Estudio de la Libreria ev3d...
Support #230: Estudio de la Libreria ev3dev-lang-python
Project: Grupo 5 2018 Status: New Start date: 09/11/2018 Due date: 10/25/2018 Assignee: Priority: Normal
Grupo 6 2018 -
Feature #377: Completar Wiki
Feature #377: Completar Wiki
Project: Grupo 6 2018 Status: New Start date: 09/11/2018 Due date: 11/22/2018 Assignee: David Orellana Priority: Normal
Grupo 6 2018 -
Support #390: Implementación de Códigos p...
Support #390: Implementación de Códigos para el Robot
Project: Grupo 6 2018 Status: New Start date: 09/11/2018 Due date: 10/25/2018 Assignee: Nicolas Vargas Priority: High |
12
Grupo 4 2018 -
Feature #429: Presentación I
Feature #429: Presentación I
Project: Grupo 4 2018 Status: New Start date: 09/04/2018 Due date: 09/12/2018 Assignee: Priority: Normal |
13
Grupo 4 2018 -
Feature #423: Estudio del Lenguaje de Pro...
Feature #423: Estudio del Lenguaje de Programación Python
Project: Grupo 4 2018 Status: New Start date: 09/04/2018 Due date: 09/13/2018 Assignee: Priority: High
Grupo 4 2018 -
Feature #424: Estudio de la Librería ev3dev
Feature #424: Estudio de la Librería ev3dev
Project: Grupo 4 2018 Status: New Start date: 09/04/2018 Due date: 09/13/2018 Assignee: Priority: High
Grupo 4 2018 -
Feature #434: Costeo
Feature #434: Costeo
Project: Grupo 4 2018 Status: New Start date: 09/11/2018 Due date: 09/13/2018 Assignee: Christian Caceres Priority: Normal
Grupo 5 2018 -
Feature #442: Informe I
Feature #442: Informe I
Project: Grupo 5 2018 Status: New Start date: 09/09/2018 Due date: 09/13/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Bug #444: Presentación I
Bug #444: Presentación I
Project: Grupo 5 2018 Status: New Start date: 09/09/2018 Due date: 09/13/2018 Assignee: Scarlet Gavia Mondaca Priority: Normal
Grupo 6 2018 -
Support #252: Aprender Python
Support #252: Aprender Python
Project: Grupo 6 2018 Status: New Start date: 08/28/2018 Due date: 09/13/2018 Assignee: Priority: Normal
Grupo 6 2018 -
Feature #253: Presentacion 1
Feature #253: Presentacion 1
Project: Grupo 6 2018 Status: New Start date: 09/06/2018 Due date: 09/13/2018 Assignee: Nicolas Vargas Priority: High |
14 |
15 |
38 |
16 |
17 |
18
Grupo 4 2018 -
Feature #436: Programación de los Algorit...
Feature #436: Programación de los Algoritmos Rubik's
Project: Grupo 4 2018 Status: New Start date: 09/18/2018 Due date: 10/30/2018 Assignee: Priority: Normal |
19 |
20 |
21 |
22 |
39 |
23 |
24 |
25
Grupo 4 2018 -
Feature #416: Formulación del Proyecto
Feature #416: Formulación del Proyecto
Project: Grupo 4 2018 Status: New Start date: 08/14/2018 Due date: 09/25/2018 Assignee: Priority: Normal
Grupo 4 2018 -
Feature #417: Avance Carta Gantt
Feature #417: Avance Carta Gantt
Project: Grupo 4 2018 Status: New Start date: 08/14/2018 Due date: 09/25/2018 Assignee: Priority: Normal
Grupo 1 2018 -
Feature #314: Prueba 2
Feature #314: Prueba 2
Project: Grupo 1 2018 Status: New Start date: 09/25/2018 Due date: 10/02/2018 Assignee: Diego Berrios Priority: Normal
Grupo 1 2018 -
Feature #322: Diseño de Arquitectura
Feature #322: Diseño de Arquitectura
Project: Grupo 1 2018 Status: New Start date: 09/25/2018 Due date: 10/11/2018 Assignee: Scarlett Oswald Priority: Normal
Grupo 2 2018 -
Feature #271: Proyecto: Parte 4
Feature #271: Proyecto: Parte 4
Project: Grupo 2 2018 Status: New Start date: 09/25/2018 Due date: 12/07/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 2 2018 -
Feature #272: Desarrollo Conexión Remoto
Feature #272: Desarrollo Conexión Remoto
Project: Grupo 2 2018 Status: New Start date: 09/25/2018 Due date: 11/15/2018 Assignee: Luis Soto Priority: Normal
Grupo 2 2018 -
Feature #273: Codigo Fuente Robot "EV3"
Feature #273: Codigo Fuente Robot "EV3"
Project: Grupo 2 2018 Status: New Start date: 09/25/2018 Due date: 11/15/2018 Assignee: José Ignacio Le Blanc Priority: Normal
Grupo 2 2018 -
Feature #274: Armado Cubo Rubik
Feature #274: Armado Cubo Rubik
Project: Grupo 2 2018 Status: New Start date: 09/25/2018 Due date: 11/13/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 2 2018 -
Feature #538: Aplicación EV3
Feature #538: Aplicación EV3
Project: Grupo 2 2018 Status: New Start date: 09/25/2018 Due date: 12/07/2018 Assignee: Priority: Normal |
26 |
27
Grupo 1 2018 -
Feature #261: Adaptación del Movimiento d...
Feature #261: Adaptación del Movimiento del Robot
Project: Grupo 1 2018 Status: New Start date: 09/04/2018 Due date: 09/27/2018 Assignee: Diego Berrios Priority: Normal
Grupo 6 2018 -
Bug #307: Buscar algoritmos del movim...
Bug #307: Buscar algoritmos del movimiento del Cubo Rubik
Project: Grupo 6 2018 Status: New Start date: 09/06/2018 Due date: 09/27/2018 Assignee: David Orellana Priority: Normal
Grupo 3 2018 -
Feature #383: Avance 1 + Corrección
Feature #383: Avance 1 + Corrección
Project: Grupo 3 2018 Status: New Start date: 09/27/2018 Due date: 11/22/2018 Assignee: Gabriel Echeverria Priority: Normal
Grupo 3 2018 -
Feature #543: Conexión remota con cliente...
Feature #543: Conexión remota con cliente SSH.
Project: Grupo 3 2018 Status: New Start date: 09/27/2018 Due date: 10/04/2018 Assignee: Priority: Normal |
28 |
29 |
40 |
30 |
1 |
2
Grupo 1 2018 -
Feature #314: Prueba 2
Feature #314: Prueba 2
Project: Grupo 1 2018 Status: New Start date: 09/25/2018 Due date: 10/02/2018 Assignee: Diego Berrios Priority: Normal
Grupo 1 2018 -
Feature #327: Formulación del Proyecto pa...
Feature #327: Formulación del Proyecto parte II
Project: Grupo 1 2018 Status: New Start date: 10/02/2018 Due date: 10/23/2018 Assignee: Scarlett Oswald Priority: Normal
Grupo 1 2018 -
Feature #328: Informe II
Feature #328: Informe II
Project: Grupo 1 2018 Status: New Start date: 10/02/2018 Due date: 10/23/2018 Assignee: Priority: Normal
Grupo 2 2018 -
Feature #526: 2do Informe
Feature #526: 2do Informe
Project: Grupo 2 2018 Status: New Start date: 10/02/2018 Due date: 10/23/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 4 2018 -
Feature #430: Documentación Parte II
Feature #430: Documentación Parte II
Project: Grupo 4 2018 Status: New Start date: 10/02/2018 Due date: 10/25/2018 Assignee: Priority: Normal
Grupo 4 2018 -
Feature #431: Informe de Avance I
Feature #431: Informe de Avance I
Project: Grupo 4 2018 Status: New Start date: 10/02/2018 Due date: 10/25/2018 Assignee: Priority: Normal
Grupo 4 2018 -
Feature #432: Presentación Avance I
Feature #432: Presentación Avance I
Project: Grupo 4 2018 Status: New Start date: 10/02/2018 Due date: 10/25/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Support #235: Estudio de medio de Comunic...
Support #235: Estudio de medio de Comunicacion con EV3
Project: Grupo 5 2018 Status: New Start date: 10/02/2018 Due date: 11/13/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Support #236: Implementacion de la soluci...
Support #236: Implementacion de la solucion de comunicacion remota
Project: Grupo 5 2018 Status: New Start date: 10/02/2018 Due date: 11/13/2018 Assignee: Jonathan Bravo Priority: Normal
Grupo 5 2018 -
Feature #443: Informe II
Feature #443: Informe II
Project: Grupo 5 2018 Status: New Start date: 10/02/2018 Due date: 10/25/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Bug #557: Presentación II
Bug #557: Presentación II
Project: Grupo 5 2018 Status: New Start date: 10/02/2018 Due date: 10/25/2018 Assignee: Priority: Normal |
3 |
4
Grupo 3 2018 -
Feature #543: Conexión remota con cliente...
Feature #543: Conexión remota con cliente SSH.
Project: Grupo 3 2018 Status: New Start date: 09/27/2018 Due date: 10/04/2018 Assignee: Priority: Normal
Grupo 2 2018 -
Feature #527: 2da presentación
Feature #527: 2da presentación
Project: Grupo 2 2018 Status: New Start date: 10/04/2018 Due date: 10/25/2018 Assignee: Matias Sandoval Priority: Normal
Grupo 4 2018 -
Feature #524: Manual Del Robot
Feature #524: Manual Del Robot
Project: Grupo 4 2018 Status: New Start date: 10/04/2018 Due date: 12/06/2018 Assignee: Priority: High
Grupo 5 2018 -
Support #231: Programas del Robot EV3
Support #231: Programas del Robot EV3
Project: Grupo 5 2018 Status: New Start date: 10/04/2018 Due date: 12/06/2018 Assignee: Priority: Normal
Grupo 5 2018 -
Bug #232: Adaptacion del Movimiento d...
Bug #232: Adaptacion del Movimiento del Robot
Project: Grupo 5 2018 Status: New Start date: 10/04/2018 Due date: 11/15/2018 Assignee: Jonathan Bravo Priority: Normal
Grupo 5 2018 -
Support #233: Programacion de Algoritmos ...
Support #233: Programacion de Algoritmos Rubik
Project: Grupo 5 2018 Status: New Start date: 10/04/2018 Due date: 11/22/2018 Assignee: Scarlet Gavia Mondaca Priority: Normal |
5 |
6 |
issue beginning this day issue ending this day issue beginning and ending this day