40

29

Grupo 5B-2024 - Bug #4629: Informe 1 Bug #4629: Informe 1

Project: Grupo 5B-2024
Status: New
Start date: 08/12/2024
Due date: 09/29/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4496: Presentación del informe Bug #4496: Presentación del informe

Project: Grupo 5B-2024
Status: New
Start date: 09/29/2024
Due date: 09/30/2024
Assignee:
Priority: Normal

30

Grupo 1B-2024 - Feature #4418: Preparar Presentación Feature #4418: Preparar Presentación

Project: Grupo 1B-2024
Status: New
Start date: 09/27/2024
Due date: 09/30/2024
Assignee: Sebastian Cayupi
Priority: High
Grupo 5B-2024 - Bug #4495: Informe fase 1 Bug #4495: Informe fase 1

Project: Grupo 5B-2024
Status: New
Start date: 08/12/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4496: Presentación del informe Bug #4496: Presentación del informe

Project: Grupo 5B-2024
Status: New
Start date: 09/29/2024
Due date: 09/30/2024
Assignee:
Priority: Normal

1

Grupo 3B-2024 - Feature #4247: Fase I - Planificación del ... Feature #4247: Fase I - Planificación del Proyecto

Project: Grupo 3B-2024
Status: New
Start date: 08/12/2024
Due date: 10/01/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4251: Desarrollo Informe I Feature #4251: Desarrollo Informe I

Project: Grupo 3B-2024
Status: New
Start date: 09/09/2024
Due date: 10/01/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4430: Desarrollo Presentación Inf... Feature #4430: Desarrollo Presentación Informe I

Project: Grupo 3B-2024
Status: New
Start date: 09/24/2024
Due date: 10/01/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4194: Fase 1 Feature #4194: Fase 1

Project: Grupo 4B-2024
Status: New
Start date: 08/12/2024
Due date: 10/01/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4198: Informe Inicial Feature #4198: Informe Inicial

Project: Grupo 4B-2024
Status: New
Start date: 09/05/2024
Due date: 10/01/2024
Assignee: Cesar Jimenez
Priority: Normal
Grupo 4B-2024 - Feature #4204: Presentación I Feature #4204: Presentación I

Project: Grupo 4B-2024
Status: New
Start date: 09/05/2024
Due date: 10/01/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4206: Planeación del proyecto Feature #4206: Planeación del proyecto

Project: Grupo 4B-2024
Status: New
Start date: 09/09/2024
Due date: 10/01/2024
Assignee: Andrea Navia
Priority: Normal
Grupo 4B-2024 - Feature #4259: Estimación de Costos Feature #4259: Estimación de Costos

Project: Grupo 4B-2024
Status: New
Start date: 09/09/2024
Due date: 10/01/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 1B-2024 - Feature #4422: Presentación Fase I Feature #4422: Presentación Fase I

Project: Grupo 1B-2024
Status: Resolved
Start date: 10/01/2024
Due date: 10/03/2024
Assignee: Juan Meneses
Priority: Normal
Grupo 1B-2024 - Feature #4425: Informe Fase II Feature #4425: Informe Fase II

Project: Grupo 1B-2024
Status: New
Start date: 10/01/2024
Due date: 10/31/2024
Assignee: Sebastian Cayupi
Priority: Normal
Grupo 2B-2024 - Feature #4446: Termino y entrega del infor... Feature #4446: Termino y entrega del informe de avance

Project: Grupo 2B-2024
Status: New
Start date: 10/01/2024
Due date: 10/10/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4450: Informe ll Feature #4450: Informe ll

Project: Grupo 2B-2024
Status: New
Start date: 10/01/2024
Due date: 11/01/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4451: Conexion de sensores Feature #4451: Conexion de sensores

Project: Grupo 2B-2024
Status: New
Start date: 10/01/2024
Due date: 11/01/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4207: Fase 2 Feature #4207: Fase 2

Project: Grupo 4B-2024
Status: New
Start date: 10/01/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4213: Informe 2 Feature #4213: Informe 2

Project: Grupo 4B-2024
Status: New
Start date: 10/01/2024
Due date: 11/05/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4214: Presentación 2 Feature #4214: Presentación 2

Project: Grupo 4B-2024
Status: New
Start date: 10/01/2024
Due date: 11/05/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 5B-2024 - Bug #4498: Informe fase 2 Bug #4498: Informe fase 2

Project: Grupo 5B-2024
Status: New
Start date: 10/01/2024
Due date: 11/04/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4499: Correcciones de informe 1 Bug #4499: Correcciones de informe 1

Project: Grupo 5B-2024
Status: New
Start date: 10/01/2024
Due date: 10/10/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4501: Interfaz Grafica de Usuario Bug #4501: Interfaz Grafica de Usuario

Project: Grupo 5B-2024
Status: New
Start date: 10/01/2024
Due date: 11/01/2024
Assignee:
Priority: Normal

2

3

Grupo 1B-2024 - Feature #4417: Informe Fase I Feature #4417: Informe Fase I

Project: Grupo 1B-2024
Status: New
Start date: 09/10/2024
Due date: 10/03/2024
Assignee: Sebastian Cayupi
Priority: High
Grupo 1B-2024 - Feature #4422: Presentación Fase I Feature #4422: Presentación Fase I

Project: Grupo 1B-2024
Status: Resolved
Start date: 10/01/2024
Due date: 10/03/2024
Assignee: Juan Meneses
Priority: Normal
Grupo 5B-2024 - Bug #4502: Modelos de interaccion Bug #4502: Modelos de interaccion

Project: Grupo 5B-2024
Status: New
Start date: 10/03/2024
Due date: 10/31/2024
Assignee:
Priority: Normal

4

Grupo 1B-2024 - Feature #4421: Conexión al lector de huellas Feature #4421: Conexión al lector de huellas

Project: Grupo 1B-2024
Status: New
Start date: 10/04/2024
Due date: 10/18/2024
Assignee: Manuel Lopez Muñoz
Priority: Immediate
Grupo 1B-2024 - Feature #4439: Programación Feature #4439: Programación

Project: Grupo 1B-2024
Status: In Progress
Start date: 10/04/2024
Due date: 10/27/2024
Assignee: Manuel Lopez Muñoz
Priority: Immediate

5

41

6

7

Grupo 3B-2024 - Feature #4447: Fase II - Inicio del Proyecto Feature #4447: Fase II - Inicio del Proyecto

Project: Grupo 3B-2024
Status: New
Start date: 10/07/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4585: Estudio Raspberry PI, cuida... Feature #4585: Estudio Raspberry PI, cuidados y recomendaciones

Project: Grupo 3B-2024
Status: New
Start date: 10/07/2024
Due date: 10/13/2024
Assignee:
Priority: Normal

8

Grupo 2B-2024 - Feature #4155: Problematica del Proyecto (... Feature #4155: Problematica del Proyecto (Control y Gestión de Parametros de las Naranjas)

Project: Grupo 2B-2024
Status: New
Start date: 08/13/2024
Due date: 10/08/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4156: Solución de la Problematica Feature #4156: Solución de la Problematica

Project: Grupo 2B-2024
Status: New
Start date: 08/20/2024
Due date: 10/08/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4157: Inicio de la Maqueta Feature #4157: Inicio de la Maqueta

Project: Grupo 2B-2024
Status: New
Start date: 08/27/2024
Due date: 10/08/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4158: Termino y Presentacion del ... Feature #4158: Termino y Presentacion del Proyecto (Maqueta)

Project: Grupo 2B-2024
Status: New
Start date: 09/03/2024
Due date: 10/08/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4159: Comienzo de Redacción de In... Feature #4159: Comienzo de Redacción de Informe del Proyecto

Project: Grupo 2B-2024
Status: New
Start date: 09/10/2024
Due date: 10/08/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4258: Revisión de Redaccion del I... Feature #4258: Revisión de Redaccion del Informe del Proyecto

Project: Grupo 2B-2024
Status: New
Start date: 09/24/2024
Due date: 10/08/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4531: Creacion de requerimientos Feature #4531: Creacion de requerimientos

Project: Grupo 4B-2024
Status: New
Start date: 10/08/2024
Due date: 11/05/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4532: Creación de los casos de uso Feature #4532: Creación de los casos de uso

Project: Grupo 4B-2024
Status: New
Start date: 10/08/2024
Due date: 11/05/2024
Assignee: Andrea Navia
Priority: Normal
Grupo 4B-2024 - Feature #4534: Fijar arquitectura proyecto Feature #4534: Fijar arquitectura proyecto

Project: Grupo 4B-2024
Status: New
Start date: 10/08/2024
Due date: 11/05/2024
Assignee: Cesar Jimenez
Priority: Normal
Grupo 5B-2024 - Bug #4500: Modelos de diseño Bug #4500: Modelos de diseño

Project: Grupo 5B-2024
Status: New
Start date: 10/08/2024
Due date: 10/31/2024
Assignee:
Priority: Normal

9

Grupo 5B-2024 - Bug #4201: desarrollo de la funcionali... Bug #4201: desarrollo de la funcionalidad de evadir obstáculos

Project: Grupo 5B-2024
Status: New
Start date: 10/09/2024
Due date: 11/21/2024
Assignee:
Priority: Normal

10

Grupo 2B-2024 - Feature #4446: Termino y entrega del infor... Feature #4446: Termino y entrega del informe de avance

Project: Grupo 2B-2024
Status: New
Start date: 10/01/2024
Due date: 10/10/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4499: Correcciones de informe 1 Bug #4499: Correcciones de informe 1

Project: Grupo 5B-2024
Status: New
Start date: 10/01/2024
Due date: 10/10/2024
Assignee:
Priority: Normal

11

12

42

13

Grupo 3B-2024 - Feature #4585: Estudio Raspberry PI, cuida... Feature #4585: Estudio Raspberry PI, cuidados y recomendaciones

Project: Grupo 3B-2024
Status: New
Start date: 10/07/2024
Due date: 10/13/2024
Assignee:
Priority: Normal

14

Grupo 3B-2024 - Feature #4584: Instalación SO Raspberry Pi Feature #4584: Instalación SO Raspberry Pi

Project: Grupo 3B-2024
Status: New
Start date: 10/14/2024
Due date: 10/21/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4590: Estudiar librería Tkinter Feature #4590: Estudiar librería Tkinter

Project: Grupo 3B-2024
Status: New
Start date: 10/14/2024
Due date: 10/20/2024
Assignee:
Priority: Normal

15

Grupo 4B-2024 - Feature #4533: Diseño interfaz de usuario Feature #4533: Diseño interfaz de usuario

Project: Grupo 4B-2024
Status: New
Start date: 10/15/2024
Due date: 11/05/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4535: Uso inicial de raspberry pi Feature #4535: Uso inicial de raspberry pi

Project: Grupo 4B-2024
Status: New
Start date: 10/15/2024
Due date: 11/05/2024
Assignee: Cesar Jimenez
Priority: Normal

16

17

Grupo 2B-2024 - Feature #4490: Conexión a la Raspberry PI Feature #4490: Conexión a la Raspberry PI

Project: Grupo 2B-2024
Status: New
Start date: 10/17/2024
Due date: 10/22/2024
Assignee:
Priority: Normal

18

Grupo 1B-2024 - Feature #4421: Conexión al lector de huellas Feature #4421: Conexión al lector de huellas

Project: Grupo 1B-2024
Status: New
Start date: 10/04/2024
Due date: 10/18/2024
Assignee: Manuel Lopez Muñoz
Priority: Immediate

19

43

20

Grupo 3B-2024 - Feature #4590: Estudiar librería Tkinter Feature #4590: Estudiar librería Tkinter

Project: Grupo 3B-2024
Status: New
Start date: 10/14/2024
Due date: 10/20/2024
Assignee:
Priority: Normal

21

Grupo 3B-2024 - Feature #4584: Instalación SO Raspberry Pi Feature #4584: Instalación SO Raspberry Pi

Project: Grupo 3B-2024
Status: New
Start date: 10/14/2024
Due date: 10/21/2024
Assignee:
Priority: Normal
Grupo 1B-2024 - Feature #4426: Confección Base Datos Feature #4426: Confección Base Datos

Project: Grupo 1B-2024
Status: New
Start date: 10/21/2024
Due date: 10/27/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4586: Estudio Fase de Planificación Feature #4586: Estudio Fase de Planificación

Project: Grupo 3B-2024
Status: New
Start date: 10/21/2024
Due date: 10/28/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4591: Configurar Conexión Raspber... Feature #4591: Configurar Conexión Raspberry Pi - Smartphone

Project: Grupo 3B-2024
Status: New
Start date: 10/21/2024
Due date: 10/28/2024
Assignee:
Priority: Normal

22

Grupo 2B-2024 - Feature #4490: Conexión a la Raspberry PI Feature #4490: Conexión a la Raspberry PI

Project: Grupo 2B-2024
Status: New
Start date: 10/17/2024
Due date: 10/22/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4491: Corrección Entrega Informe 1 Feature #4491: Corrección Entrega Informe 1

Project: Grupo 2B-2024
Status: New
Start date: 10/22/2024
Due date: 11/01/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4492: Implementación casos de uso Feature #4492: Implementación casos de uso

Project: Grupo 2B-2024
Status: New
Start date: 10/22/2024
Due date: 11/07/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4582: Programación de sistema Feature #4582: Programación de sistema

Project: Grupo 2B-2024
Status: New
Start date: 10/22/2024
Due date: 11/14/2024
Assignee:
Priority: Normal

23

24

Grupo 5B-2024 - Bug #4505: Programar movilidad autonoma Bug #4505: Programar movilidad autonoma

Project: Grupo 5B-2024
Status: New
Start date: 10/24/2024
Due date: 11/22/2024
Assignee:
Priority: Normal

25

26

44

27

Grupo 1B-2024 - Feature #4426: Confección Base Datos Feature #4426: Confección Base Datos

Project: Grupo 1B-2024
Status: New
Start date: 10/21/2024
Due date: 10/27/2024
Assignee:
Priority: Normal
Grupo 1B-2024 - Feature #4439: Programación Feature #4439: Programación

Project: Grupo 1B-2024
Status: In Progress
Start date: 10/04/2024
Due date: 10/27/2024
Assignee: Manuel Lopez Muñoz
Priority: Immediate
Grupo 5B-2024 - Bug #4208: realizar pruebad de estabil... Bug #4208: realizar pruebad de estabilidad con el sensor imu

Project: Grupo 5B-2024
Status: New
Start date: 10/27/2024
Due date: 11/15/2024
Assignee:
Priority: Normal

28

Grupo 3B-2024 - Feature #4586: Estudio Fase de Planificación Feature #4586: Estudio Fase de Planificación

Project: Grupo 3B-2024
Status: New
Start date: 10/21/2024
Due date: 10/28/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4591: Configurar Conexión Raspber... Feature #4591: Configurar Conexión Raspberry Pi - Smartphone

Project: Grupo 3B-2024
Status: New
Start date: 10/21/2024
Due date: 10/28/2024
Assignee:
Priority: Normal

29

Grupo 1B-2024 - Bug #4442: Presentación Fase II Bug #4442: Presentación Fase II

Project: Grupo 1B-2024
Status: New
Start date: 10/29/2024
Due date: 10/29/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4587: Realización 2do Informe Feature #4587: Realización 2do Informe

Project: Grupo 3B-2024
Status: New
Start date: 10/29/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 3B-2024 - Feature #4589: Desarrollo 2da Presentación Feature #4589: Desarrollo 2da Presentación

Project: Grupo 3B-2024
Status: New
Start date: 10/29/2024
Due date: 11/05/2024
Assignee:
Priority: Normal

30

31

Grupo 1B-2024 - Feature #4425: Informe Fase II Feature #4425: Informe Fase II

Project: Grupo 1B-2024
Status: New
Start date: 10/01/2024
Due date: 10/31/2024
Assignee: Sebastian Cayupi
Priority: Normal
Grupo 5B-2024 - Bug #4500: Modelos de diseño Bug #4500: Modelos de diseño

Project: Grupo 5B-2024
Status: New
Start date: 10/08/2024
Due date: 10/31/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4502: Modelos de interaccion Bug #4502: Modelos de interaccion

Project: Grupo 5B-2024
Status: New
Start date: 10/03/2024
Due date: 10/31/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4503: Presentación Informe 2 Bug #4503: Presentación Informe 2

Project: Grupo 5B-2024
Status: New
Start date: 10/31/2024
Due date: 11/04/2024
Assignee:
Priority: Normal

1

Grupo 2B-2024 - Feature #4450: Informe ll Feature #4450: Informe ll

Project: Grupo 2B-2024
Status: New
Start date: 10/01/2024
Due date: 11/01/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4451: Conexion de sensores Feature #4451: Conexion de sensores

Project: Grupo 2B-2024
Status: New
Start date: 10/01/2024
Due date: 11/01/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4491: Corrección Entrega Informe 1 Feature #4491: Corrección Entrega Informe 1

Project: Grupo 2B-2024
Status: New
Start date: 10/22/2024
Due date: 11/01/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4501: Interfaz Grafica de Usuario Bug #4501: Interfaz Grafica de Usuario

Project: Grupo 5B-2024
Status: New
Start date: 10/01/2024
Due date: 11/01/2024
Assignee:
Priority: Normal
Grupo 1B-2024 - Feature #4435: Informe Fase III Feature #4435: Informe Fase III

Project: Grupo 1B-2024
Status: New
Start date: 11/01/2024
Due date: 11/30/2024
Assignee: Sebastian Cayupi
Priority: Normal
Grupo 1B-2024 - Feature #4440: Confección Interfaz Gráfica Feature #4440: Confección Interfaz Gráfica

Project: Grupo 1B-2024
Status: New
Start date: 11/01/2024
Due date: 11/15/2024
Assignee:
Priority: Normal

2