Grupo 4A 2025 -
Feature #5496: Maqueta
Feature #5496: Maqueta
Project: Grupo 4A 2025 Status: Resolved Start date: 09/29/2025 Due date: 10/15/2025 Assignee: yazuska castillo Priority: High
Grupo 4A 2025 -
Feature #5503: Unity
Feature #5503: Unity
Project: Grupo 4A 2025 Status: Resolved Start date: 09/29/2025 Due date: 10/15/2025 Assignee: yazuska castillo Priority: High |
30
Grupo 2A 2025 -
Feature #5502: Modelo 3D(Unity)
Feature #5502: Modelo 3D(Unity)
Project: Grupo 2A 2025 Status: Resolved Start date: 09/30/2025 Due date: 10/07/2025 Assignee: Priority: Normal |
1
Grupo 1A 2025 -
Feature #4793: Diseño y modelado 3D en Unity
Feature #4793: Diseño y modelado 3D en Unity
Project: Grupo 1A 2025 Status: Resolved Start date: 09/22/2025 Due date: 10/01/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #4794: Creación de la maqueta 3D.
Feature #4794: Creación de la maqueta 3D.
Project: Grupo 1A 2025 Status: Resolved Start date: 09/22/2025 Due date: 10/01/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5800: Maqueta de la solución prop...
Feature #5800: Maqueta de la solución propuesta
Project: Grupo 6A 2025 Status: Resolved Start date: 10/01/2025 Due date: 10/14/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5868: Dibujar boceto de la maqueta
Feature #5868: Dibujar boceto de la maqueta
Project: Grupo 6A 2025 Status: Resolved Start date: 10/01/2025 Due date: 10/07/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5869: Investigación sobre Unity
Feature #5869: Investigación sobre Unity
Project: Grupo 6A 2025 Status: Resolved Start date: 10/01/2025 Due date: 10/07/2025 Assignee: Priority: Normal |
2 |
3 |
4 |
| 41 |
5
Grupo 4A 2025 -
Feature #5506: Presentación
Feature #5506: Presentación
Project: Grupo 4A 2025 Status: In Progress Start date: 10/05/2025 Due date: 11/18/2025 Assignee: israel tebes Priority: Normal
Grupo 4A 2025 -
Feature #5539: Maqueta
Feature #5539: Maqueta
Project: Grupo 4A 2025 Status: Resolved Start date: 10/05/2025 Due date: 10/14/2025 Assignee: israel tebes Priority: Normal |
6
Grupo 5A 2025 -
Feature #4817: Confección de la Maqueta VR
Feature #4817: Confección de la Maqueta VR
Project: Grupo 5A 2025 Status: New Start date: 09/24/2025 Due date: 10/06/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #4861: Presentación Maqueta
Feature #4861: Presentación Maqueta
Project: Grupo 3A 2025 Status: New Start date: 10/06/2025 Due date: 10/08/2025 Assignee: Guillermo Pino Priority: Normal
Grupo 4A 2025 -
Feature #5499: Wiki
Feature #5499: Wiki
Project: Grupo 4A 2025 Status: In Progress Start date: 10/06/2025 Due date: 10/28/2025 Assignee: israel tebes Priority: Normal |
7
Grupo 2A 2025 -
Feature #5502: Modelo 3D(Unity)
Feature #5502: Modelo 3D(Unity)
Project: Grupo 2A 2025 Status: Resolved Start date: 09/30/2025 Due date: 10/07/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #4785: Maqueta
Feature #4785: Maqueta
Project: Grupo 3A 2025 Status: New Start date: 09/24/2025 Due date: 10/07/2025 Assignee: Iván Collao Priority: Normal
Grupo 6A 2025 -
Feature #5868: Dibujar boceto de la maqueta
Feature #5868: Dibujar boceto de la maqueta
Project: Grupo 6A 2025 Status: Resolved Start date: 10/01/2025 Due date: 10/07/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5869: Investigación sobre Unity
Feature #5869: Investigación sobre Unity
Project: Grupo 6A 2025 Status: Resolved Start date: 10/01/2025 Due date: 10/07/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #5626: Informe 1
Feature #5626: Informe 1
Project: Grupo 3A 2025 Status: New Start date: 10/07/2025 Due date: 10/29/2025 Assignee: giorgio rojas Priority: High
Grupo 3A 2025 -
Feature #5627: Asignación de roles
Feature #5627: Asignación de roles
Project: Grupo 3A 2025 Status: Resolved Start date: 10/07/2025 Due date: 10/08/2025 Assignee: giorgio rojas Priority: Normal
Grupo 4A 2025 -
Feature #5500: Asignación de Cargos
Feature #5500: Asignación de Cargos
Project: Grupo 4A 2025 Status: Resolved Start date: 10/07/2025 Due date: 10/15/2025 Assignee: rene ayca Priority: Normal
Grupo 5A 2025 -
Feature #5597: Muestra Maqueta y Esquema
Feature #5597: Muestra Maqueta y Esquema
Project: Grupo 5A 2025 Status: New Start date: 10/07/2025 Due date: 10/10/2025 Assignee: Priority: Normal |
8
Grupo 3A 2025 -
Feature #4861: Presentación Maqueta
Feature #4861: Presentación Maqueta
Project: Grupo 3A 2025 Status: New Start date: 10/06/2025 Due date: 10/08/2025 Assignee: Guillermo Pino Priority: Normal
Grupo 3A 2025 -
Feature #5627: Asignación de roles
Feature #5627: Asignación de roles
Project: Grupo 3A 2025 Status: Resolved Start date: 10/07/2025 Due date: 10/08/2025 Assignee: giorgio rojas Priority: Normal
Grupo 3A 2025 -
Feature #5628: Suposiciones y restricciones
Feature #5628: Suposiciones y restricciones
Project: Grupo 3A 2025 Status: New Start date: 10/08/2025 Due date: 10/10/2025 Assignee: Sebastián Eyraud Priority: Normal
Grupo 6A 2025 -
Feature #5870: Implementar boceto en unity
Feature #5870: Implementar boceto en unity
Project: Grupo 6A 2025 Status: Resolved Start date: 10/08/2025 Due date: 10/10/2025 Assignee: Priority: Normal |
9 |
10
Grupo 1A 2025 -
Feature #5545: Presentación e Informe I
Feature #5545: Presentación e Informe I
Project: Grupo 1A 2025 Status: Resolved Start date: 10/10/2025 Due date: 10/10/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #5628: Suposiciones y restricciones
Feature #5628: Suposiciones y restricciones
Project: Grupo 3A 2025 Status: New Start date: 10/08/2025 Due date: 10/10/2025 Assignee: Sebastián Eyraud Priority: Normal
Grupo 5A 2025 -
Feature #5597: Muestra Maqueta y Esquema
Feature #5597: Muestra Maqueta y Esquema
Project: Grupo 5A 2025 Status: New Start date: 10/07/2025 Due date: 10/10/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5870: Implementar boceto en unity
Feature #5870: Implementar boceto en unity
Project: Grupo 6A 2025 Status: Resolved Start date: 10/08/2025 Due date: 10/10/2025 Assignee: Priority: Normal |
11
Grupo 6A 2025 -
Feature #5871: Visualizar maqueta con Meta...
Feature #5871: Visualizar maqueta con MetaQuest
Project: Grupo 6A 2025 Status: Resolved Start date: 10/11/2025 Due date: 10/14/2025 Assignee: Priority: Normal |
| 42 |
12 |
13
Grupo 5A 2025 -
Feature #4819: Etapa 2
Feature #4819: Etapa 2
Project: Grupo 5A 2025 Status: New Start date: 10/13/2025 Due date: 11/28/2025 Assignee: Priority: Urgent
Grupo 5A 2025 -
Feature #5604: Instalación del SO
Feature #5604: Instalación del SO
Project: Grupo 5A 2025 Status: New Start date: 10/13/2025 Due date: 10/17/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5605: Conteo de Piezas
Feature #5605: Conteo de Piezas
Project: Grupo 5A 2025 Status: New Start date: 10/13/2025 Due date: 10/15/2025 Assignee: Priority: Normal |
14
Grupo 2A 2025 -
Feature #4799: Fase 1: Investigación y Pro...
Feature #4799: Fase 1: Investigación y Prototipo Inicial
Project: Grupo 2A 2025 Status: New Start date: 09/03/2025 Due date: 10/14/2025 Assignee: Priority: Normal
Grupo 4A 2025 -
Feature #5539: Maqueta
Feature #5539: Maqueta
Project: Grupo 4A 2025 Status: Resolved Start date: 10/05/2025 Due date: 10/14/2025 Assignee: israel tebes Priority: Normal
Grupo 5A 2025 -
Feature #5661: instalacion de drivers, lib...
Feature #5661: instalacion de drivers, librerias y APIs
Project: Grupo 5A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/14/2025 Assignee: Priority: Urgent
Grupo 6A 2025 -
Feature #4821: Bitácoras
Feature #4821: Bitácoras
Project: Grupo 6A 2025 Status: Resolved Start date: 09/23/2025 Due date: 10/14/2025 Assignee: bastian cruz Priority: Normal
Grupo 6A 2025 -
Feature #5800: Maqueta de la solución prop...
Feature #5800: Maqueta de la solución propuesta
Project: Grupo 6A 2025 Status: Resolved Start date: 10/01/2025 Due date: 10/14/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5801: Informe 1
Feature #5801: Informe 1
Project: Grupo 6A 2025 Status: Resolved Start date: 09/23/2025 Due date: 10/14/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5871: Visualizar maqueta con Meta...
Feature #5871: Visualizar maqueta con MetaQuest
Project: Grupo 6A 2025 Status: Resolved Start date: 10/11/2025 Due date: 10/14/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #4883: Planificación de sensores y...
Feature #4883: Planificación de sensores y componentes
Project: Grupo 1A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5000: Análisis de riesgos
Feature #5000: Análisis de riesgos
Project: Grupo 1A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5546: Identificación de sensores ...
Feature #5546: Identificación de sensores y Raspberry Pi 4
Project: Grupo 1A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #4807: Fase 2: Planificación y Def...
Feature #4807: Fase 2: Planificación y Definición
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/28/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #4809: Estudio acerca de raspberry
Feature #4809: Estudio acerca de raspberry
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/22/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5507: Estudio acerca de los tipos...
Feature #5507: Estudio acerca de los tipos de sensores
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/21/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5508: Planificación de estimaciones
Feature #5508: Planificación de estimaciones
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5513: Instalacion del SO
Feature #5513: Instalacion del SO
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/15/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #5629: Sistema operativo
Feature #5629: Sistema operativo
Project: Grupo 3A 2025 Status: New Start date: 10/14/2025 Due date: 10/15/2025 Assignee: Iván Collao Priority: Normal
Grupo 4A 2025 -
Feature #5501: Informe 1
Feature #5501: Informe 1
Project: Grupo 4A 2025 Status: In Progress Start date: 10/14/2025 Due date: 10/28/2025 Assignee: israel tebes Priority: Normal
Grupo 5A 2025 -
Feature #5598: Informe 1
Feature #5598: Informe 1
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/27/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5599: Panorama General
Feature #5599: Panorama General
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/21/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5600: Organización del Proyecto
Feature #5600: Organización del Proyecto
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/21/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5606: Investigación Previa Raspberry
Feature #5606: Investigación Previa Raspberry
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/20/2025 Assignee: Priority: Normal |
15
Grupo 2A 2025 -
Feature #5513: Instalacion del SO
Feature #5513: Instalacion del SO
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/15/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #5629: Sistema operativo
Feature #5629: Sistema operativo
Project: Grupo 3A 2025 Status: New Start date: 10/14/2025 Due date: 10/15/2025 Assignee: Iván Collao Priority: Normal
Grupo 4A 2025 -
Feature #5496: Maqueta
Feature #5496: Maqueta
Project: Grupo 4A 2025 Status: Resolved Start date: 09/29/2025 Due date: 10/15/2025 Assignee: yazuska castillo Priority: High
Grupo 4A 2025 -
Feature #5500: Asignación de Cargos
Feature #5500: Asignación de Cargos
Project: Grupo 4A 2025 Status: Resolved Start date: 10/07/2025 Due date: 10/15/2025 Assignee: rene ayca Priority: Normal
Grupo 4A 2025 -
Feature #5503: Unity
Feature #5503: Unity
Project: Grupo 4A 2025 Status: Resolved Start date: 09/29/2025 Due date: 10/15/2025 Assignee: yazuska castillo Priority: High
Grupo 4A 2025 -
Feature #5504: Video
Feature #5504: Video
Project: Grupo 4A 2025 Status: Resolved Start date: 10/15/2025 Due date: 10/15/2025 Assignee: israel tebes Priority: Normal
Grupo 5A 2025 -
Feature #5605: Conteo de Piezas
Feature #5605: Conteo de Piezas
Project: Grupo 5A 2025 Status: New Start date: 10/13/2025 Due date: 10/15/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #4820: Fase 1
Feature #4820: Fase 1
Project: Grupo 6A 2025 Status: Resolved Start date: 09/23/2025 Due date: 10/15/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5862: Presentación 1
Feature #5862: Presentación 1
Project: Grupo 6A 2025 Status: Resolved Start date: 10/15/2025 Due date: 10/15/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #5630: Planificación de estimaciones
Feature #5630: Planificación de estimaciones
Project: Grupo 3A 2025 Status: Resolved Start date: 10/15/2025 Due date: 10/17/2025 Assignee: giorgio rojas Priority: Normal
Grupo 4A 2025 -
Feature #5510: Fase 2
Feature #5510: Fase 2
Project: Grupo 4A 2025 Status: In Progress Start date: 10/15/2025 Due date: 11/26/2025 Assignee: rene ayca Priority: Normal
Grupo 4A 2025 -
Feature #5541: Raspberry
Feature #5541: Raspberry
Project: Grupo 4A 2025 Status: In Progress Start date: 10/15/2025 Due date: 11/26/2025 Assignee: claudio carvajal Priority: Normal
Grupo 4A 2025 -
Feature #5543: Investigar
Feature #5543: Investigar
Project: Grupo 4A 2025 Status: In Progress Start date: 10/15/2025 Due date: 10/30/2025 Assignee: claudio carvajal Priority: Normal |
16 |
17
Grupo 3A 2025 -
Feature #5630: Planificación de estimaciones
Feature #5630: Planificación de estimaciones
Project: Grupo 3A 2025 Status: Resolved Start date: 10/15/2025 Due date: 10/17/2025 Assignee: giorgio rojas Priority: Normal
Grupo 5A 2025 -
Feature #5604: Instalación del SO
Feature #5604: Instalación del SO
Project: Grupo 5A 2025 Status: New Start date: 10/13/2025 Due date: 10/17/2025 Assignee: Priority: Normal |
18 |
| 43 |
19 |
20
Grupo 4A 2025 -
Feature #5512: Análisis
Feature #5512: Análisis
Project: Grupo 4A 2025 Status: In Progress Start date: 09/09/2025 Due date: 10/20/2025 Assignee: rene ayca Priority: Normal
Grupo 5A 2025 -
Feature #5606: Investigación Previa Raspberry
Feature #5606: Investigación Previa Raspberry
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/20/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5607: Conexión Remota Raspberry
Feature #5607: Conexión Remota Raspberry
Project: Grupo 5A 2025 Status: New Start date: 10/20/2025 Due date: 10/22/2025 Assignee: Priority: Normal |
21
Grupo 2A 2025 -
Feature #5507: Estudio acerca de los tipos...
Feature #5507: Estudio acerca de los tipos de sensores
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/21/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5599: Panorama General
Feature #5599: Panorama General
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/21/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5600: Organización del Proyecto
Feature #5600: Organización del Proyecto
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/21/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #4999: Etapa ll Diseño Detallado, ...
Feature #4999: Etapa ll Diseño Detallado, Implementación y Pruebas
Project: Grupo 1A 2025 Status: In Progress Start date: 10/21/2025 Due date: 12/19/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5548: Implementación electrónica
Feature #5548: Implementación electrónica
Project: Grupo 1A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/31/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5553: Establecer las conexiones e...
Feature #5553: Establecer las conexiones entre los dispositivos electrónicos (sensores, actuadores, Raspberry Pi)
Project: Grupo 1A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/31/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5505: Elaboración Informe 1
Feature #5505: Elaboración Informe 1
Project: Grupo 2A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/28/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5509: Planificación de Riesgos
Feature #5509: Planificación de Riesgos
Project: Grupo 2A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #5631: Gestión de riesgos
Feature #5631: Gestión de riesgos
Project: Grupo 3A 2025 Status: New Start date: 10/21/2025 Due date: 10/22/2025 Assignee: giorgio rojas Priority: Normal
Grupo 4A 2025 -
Feature #5511: Logo
Feature #5511: Logo
Project: Grupo 4A 2025 Status: New Start date: 10/21/2025 Due date: 10/28/2025 Assignee: claudio carvajal Priority: Low
Grupo 4A 2025 -
Feature #5544: Conexión
Feature #5544: Conexión
Project: Grupo 4A 2025 Status: In Progress Start date: 10/21/2025 Due date: 11/12/2025 Assignee: claudio carvajal Priority: Normal
Grupo 5A 2025 -
Feature #5601: Estimación de Costos
Feature #5601: Estimación de Costos
Project: Grupo 5A 2025 Status: New Start date: 10/21/2025 Due date: 10/27/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5602: Planificación Posibles Riesgos
Feature #5602: Planificación Posibles Riesgos
Project: Grupo 5A 2025 Status: New Start date: 10/21/2025 Due date: 10/27/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5658: Prueba de los sensores
Feature #5658: Prueba de los sensores
Project: Grupo 5A 2025 Status: New Start date: 10/21/2025 Due date: 10/31/2025 Assignee: Cristián Fernando Gutierrez Fuentes Priority: High
Grupo 6A 2025 -
Feature #5608: Fase 2
Feature #5608: Fase 2
Project: Grupo 6A 2025 Status: Resolved Start date: 10/21/2025 Due date: 11/25/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5796: Informe 2
Feature #5796: Informe 2
Project: Grupo 6A 2025 Status: Resolved Start date: 10/21/2025 Due date: 11/24/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5803: Producto Raspberry PI 4
Feature #5803: Producto Raspberry PI 4
Project: Grupo 6A 2025 Status: Resolved Start date: 10/21/2025 Due date: 11/18/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5863: Investigación sobre softwar...
Feature #5863: Investigación sobre software Raspberry
Project: Grupo 6A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/28/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5879: Bitácoras
Feature #5879: Bitácoras
Project: Grupo 6A 2025 Status: Resolved Start date: 10/21/2025 Due date: 11/24/2025 Assignee: Priority: Normal |
22
Grupo 2A 2025 -
Feature #4809: Estudio acerca de raspberry
Feature #4809: Estudio acerca de raspberry
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/22/2025 Assignee: Priority: Normal
Grupo 3A 2025 -
Feature #5631: Gestión de riesgos
Feature #5631: Gestión de riesgos
Project: Grupo 3A 2025 Status: New Start date: 10/21/2025 Due date: 10/22/2025 Assignee: giorgio rojas Priority: Normal
Grupo 5A 2025 -
Feature #5607: Conexión Remota Raspberry
Feature #5607: Conexión Remota Raspberry
Project: Grupo 5A 2025 Status: New Start date: 10/20/2025 Due date: 10/22/2025 Assignee: Priority: Normal |
23
Grupo 3A 2025 -
Feature #5632: Planificacion de RRHH
Feature #5632: Planificacion de RRHH
Project: Grupo 3A 2025 Status: New Start date: 10/23/2025 Due date: 10/24/2025 Assignee: Guillermo Pino Priority: Normal |
24
Grupo 3A 2025 -
Feature #5632: Planificacion de RRHH
Feature #5632: Planificacion de RRHH
Project: Grupo 3A 2025 Status: New Start date: 10/23/2025 Due date: 10/24/2025 Assignee: Guillermo Pino Priority: Normal |
25
Grupo 3A 2025 -
Feature #5633: Presentación 2
Feature #5633: Presentación 2
Project: Grupo 3A 2025 Status: New Start date: 10/25/2025 Due date: 10/29/2025 Assignee: Sebastián Eyraud Priority: High |
| 44 |
26
Grupo 1A 2025 -
Feature #4789: Etapa l Planificación y Aná...
Feature #4789: Etapa l Planificación y Análisis del Proyecto
Project: Grupo 1A 2025 Status: Resolved Start date: 09/15/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #4883: Planificación de sensores y...
Feature #4883: Planificación de sensores y componentes
Project: Grupo 1A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5000: Análisis de riesgos
Feature #5000: Análisis de riesgos
Project: Grupo 1A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5546: Identificación de sensores ...
Feature #5546: Identificación de sensores y Raspberry Pi 4
Project: Grupo 1A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5508: Planificación de estimaciones
Feature #5508: Planificación de estimaciones
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/26/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5509: Planificación de Riesgos
Feature #5509: Planificación de Riesgos
Project: Grupo 2A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/26/2025 Assignee: Priority: Normal |
27
Grupo 5A 2025 -
Feature #5598: Informe 1
Feature #5598: Informe 1
Project: Grupo 5A 2025 Status: New Start date: 10/14/2025 Due date: 10/27/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5601: Estimación de Costos
Feature #5601: Estimación de Costos
Project: Grupo 5A 2025 Status: New Start date: 10/21/2025 Due date: 10/27/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5602: Planificación Posibles Riesgos
Feature #5602: Planificación Posibles Riesgos
Project: Grupo 5A 2025 Status: New Start date: 10/21/2025 Due date: 10/27/2025 Assignee: Priority: Normal |
28
Grupo 2A 2025 -
Feature #4807: Fase 2: Planificación y Def...
Feature #4807: Fase 2: Planificación y Definición
Project: Grupo 2A 2025 Status: Resolved Start date: 10/14/2025 Due date: 10/28/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5505: Elaboración Informe 1
Feature #5505: Elaboración Informe 1
Project: Grupo 2A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/28/2025 Assignee: Priority: Normal
Grupo 4A 2025 -
Feature #5499: Wiki
Feature #5499: Wiki
Project: Grupo 4A 2025 Status: In Progress Start date: 10/06/2025 Due date: 10/28/2025 Assignee: israel tebes Priority: Normal
Grupo 4A 2025 -
Feature #5501: Informe 1
Feature #5501: Informe 1
Project: Grupo 4A 2025 Status: In Progress Start date: 10/14/2025 Due date: 10/28/2025 Assignee: israel tebes Priority: Normal
Grupo 4A 2025 -
Feature #5511: Logo
Feature #5511: Logo
Project: Grupo 4A 2025 Status: New Start date: 10/21/2025 Due date: 10/28/2025 Assignee: claudio carvajal Priority: Low
Grupo 6A 2025 -
Feature #5863: Investigación sobre softwar...
Feature #5863: Investigación sobre software Raspberry
Project: Grupo 6A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/28/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #4818: Presentación 1
Feature #4818: Presentación 1
Project: Grupo 5A 2025 Status: New Start date: 10/28/2025 Due date: 10/29/2025 Assignee: Priority: Normal |
29
Grupo 3A 2025 -
Feature #4784: Fase 1
Feature #4784: Fase 1
Project: Grupo 3A 2025 Status: New Start date: 09/23/2025 Due date: 10/29/2025 Assignee: Guillermo Pino Priority: High
Grupo 3A 2025 -
Feature #5626: Informe 1
Feature #5626: Informe 1
Project: Grupo 3A 2025 Status: New Start date: 10/07/2025 Due date: 10/29/2025 Assignee: giorgio rojas Priority: High
Grupo 3A 2025 -
Feature #5633: Presentación 2
Feature #5633: Presentación 2
Project: Grupo 3A 2025 Status: New Start date: 10/25/2025 Due date: 10/29/2025 Assignee: Sebastián Eyraud Priority: High
Grupo 5A 2025 -
Feature #4811: Etapa 1
Feature #4811: Etapa 1
Project: Grupo 5A 2025 Status: New Start date: 09/02/2025 Due date: 10/29/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #4818: Presentación 1
Feature #4818: Presentación 1
Project: Grupo 5A 2025 Status: New Start date: 10/28/2025 Due date: 10/29/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5554: Realizar pruebas iniciales ...
Feature #5554: Realizar pruebas iniciales de funcionamiento del sistema
Project: Grupo 1A 2025 Status: Resolved Start date: 10/29/2025 Due date: 10/31/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5514: Fase 3: Desarrollo e implem...
Feature #5514: Fase 3: Desarrollo e implementación
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/25/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5837: Ingeniería de Software
Feature #5837: Ingeniería de Software
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5838: Implementación Temprana y P...
Feature #5838: Implementación Temprana y Pruebas Unitarias
Project: Grupo 2A 2025 Status: New Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5839: Definición requisitos funci...
Feature #5839: Definición requisitos funcionales y no funcionales
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/11/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5844: Pruebas de Sensores
Feature #5844: Pruebas de Sensores
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5845: Pruebas de Visión
Feature #5845: Pruebas de Visión
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5846: Conexión en Protoboard
Feature #5846: Conexión en Protoboard
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5847: Desarrollo de scripts de pr...
Feature #5847: Desarrollo de scripts de prueba en Python (lectura de distancia/movimiento)
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5848: Conexión de cámara a Raspbe...
Feature #5848: Conexión de cámara a Raspberry Pi
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5849: Prueba de captura de imagen...
Feature #5849: Prueba de captura de imagen y primeras pruebas de librerías LPR
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/23/2025 Assignee: Priority: Normal
Grupo 2A 2025 -
Feature #5850: Entrega Informe II
Feature #5850: Entrega Informe II
Project: Grupo 2A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/25/2025 Assignee: Priority: Normal
Grupo 6A 2025 -
Feature #5864: Conexión con los sensores
Feature #5864: Conexión con los sensores
Project: Grupo 6A 2025 Status: Resolved Start date: 10/29/2025 Due date: 11/04/2025 Assignee: Priority: Normal |
30
Grupo 4A 2025 -
Feature #5543: Investigar
Feature #5543: Investigar
Project: Grupo 4A 2025 Status: In Progress Start date: 10/15/2025 Due date: 10/30/2025 Assignee: claudio carvajal Priority: Normal |
31
Grupo 1A 2025 -
Feature #5548: Implementación electrónica
Feature #5548: Implementación electrónica
Project: Grupo 1A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/31/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5553: Establecer las conexiones e...
Feature #5553: Establecer las conexiones entre los dispositivos electrónicos (sensores, actuadores, Raspberry Pi)
Project: Grupo 1A 2025 Status: Resolved Start date: 10/21/2025 Due date: 10/31/2025 Assignee: Priority: Normal
Grupo 1A 2025 -
Feature #5554: Realizar pruebas iniciales ...
Feature #5554: Realizar pruebas iniciales de funcionamiento del sistema
Project: Grupo 1A 2025 Status: Resolved Start date: 10/29/2025 Due date: 10/31/2025 Assignee: Priority: Normal
Grupo 5A 2025 -
Feature #5658: Prueba de los sensores
Feature #5658: Prueba de los sensores
Project: Grupo 5A 2025 Status: New Start date: 10/21/2025 Due date: 10/31/2025 Assignee: Cristián Fernando Gutierrez Fuentes Priority: High
Grupo 3A 2025 -
Feature #5654: Fase 2
Feature #5654: Fase 2
Project: Grupo 3A 2025 Status: New Start date: 10/31/2025 Due date: 11/25/2025 Assignee: Priority: Urgent
Grupo 3A 2025 -
Feature #5927: Instalacion del sistema ope...
Feature #5927: Instalacion del sistema operativo.
Project: Grupo 3A 2025 Status: New Start date: 10/31/2025 Due date: 11/14/2025 Assignee: Sebastián Eyraud Priority: High
Grupo 3A 2025 -
Feature #5928: Investigacion de la literat...
Feature #5928: Investigacion de la literatura.
Project: Grupo 3A 2025 Status: New Start date: 10/31/2025 Due date: 11/04/2025 Assignee: Sebastián Eyraud Priority: Normal
Grupo 4A 2025 -
Feature #5542: Informe II
Feature #5542: Informe II
Project: Grupo 4A 2025 Status: New Start date: 10/31/2025 Due date: 11/12/2025 Assignee: israel tebes Priority: Normal |