Grupo 1A-2024 - Feature #3693: Fase I: Diseño y Construcci... Feature #3693: Fase I: Diseño y Construcción de la Maqueta

Project: Grupo 1A-2024
Status: New
Start date: 08/12/2024
Due date: 09/30/2024
Assignee: Cristian Huanca
Priority: High
Grupo 1A-2024 - Feature #3823: Informe I Feature #3823: Informe I

Project: Grupo 1A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee: Tihare Cabello
Priority: High
Grupo 2A-2024 - Feature #4164: Fase I : Planificación y di... Feature #4164: Fase I : Planificación y diseño del proyecto

Project: Grupo 2A-2024
Status: New
Start date: 08/07/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4173: Creación Informe (Plan de p... Feature #4173: Creación Informe (Plan de proyecto)

Project: Grupo 2A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4177: Panorama General Feature #4177: Panorama General

Project: Grupo 2A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4179: Referencias Feature #4179: Referencias

Project: Grupo 2A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4180: Organización del Proyecto Feature #4180: Organización del Proyecto

Project: Grupo 2A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4181: Planificación de los procesos Feature #4181: Planificación de los procesos

Project: Grupo 2A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4183: Planificación de los proces... Feature #4183: Planificación de los procesos técnicos

Project: Grupo 2A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4184: Planificación de los proces... Feature #4184: Planificación de los procesos de soporte

Project: Grupo 2A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #3818: Fase 1 Feature #3818: Fase 1

Project: Grupo 3A-2024
Status: New
Start date: 08/13/2024
Due date: 09/30/2024
Assignee: Cristian Sanchez
Priority: High
Grupo 3A-2024 - Feature #4330: Presentación I Feature #4330: Presentación I

Project: Grupo 3A-2024
Status: New
Start date: 09/27/2024
Due date: 09/30/2024
Assignee: Bruno Amestica
Priority: Normal
Grupo 6A-2024 - Feature #3890: Fase I Feature #3890: Fase I

Project: Grupo 6A-2024
Status: New
Start date: 08/13/2024
Due date: 09/30/2024
Assignee:
Priority: High
Grupo 6A-2024 - Feature #4222: Redactar informe I Feature #4222: Redactar informe I

Project: Grupo 6A-2024
Status: New
Start date: 09/10/2024
Due date: 09/30/2024
Assignee:
Priority: High
Grupo 6A-2024 - Feature #4228: Presentar informe I Feature #4228: Presentar informe I

Project: Grupo 6A-2024
Status: New
Start date: 09/24/2024
Due date: 09/30/2024
Assignee:
Priority: High
Grupo 2A-2024 - Feature #4169: Fase II : Desarrollo Feature #4169: Fase II : Desarrollo

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4546: Creación Informe II Feature #4546: Creación Informe II

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee: Fabian Quezada
Priority: Normal
Grupo 2A-2024 - Feature #4547: Planificación de procesos T... Feature #4547: Planificación de procesos Técnicos

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4548: Herramientas y Técnicas Feature #4548: Herramientas y Técnicas

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4549: Analisis Feature #4549: Analisis

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4550: Diseño Feature #4550: Diseño

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4552: Modelo de Diseño (Caso de u... Feature #4552: Modelo de Diseño (Caso de uso general)

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4553: Descripción de la Arquitect... Feature #4553: Descripción de la Arquitectura (vista del modelo diseño)

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4554: Documento de Diseño de Inte... Feature #4554: Documento de Diseño de Interface Usuario

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4555: Especificación de Requerimi... Feature #4555: Especificación de Requerimientos

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4556: Modelo de Diseño (Diagrama ... Feature #4556: Modelo de Diseño (Diagrama de clases)

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4557: Modelo de Interacción (Diag... Feature #4557: Modelo de Interacción (Diagrama de secuencia, o flujo de las acciones)

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4558: Descripción de la Arquitect... Feature #4558: Descripción de la Arquitectura con respecto a los modelos.

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4570: Corrección Informe I Feature #4570: Corrección Informe I

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Feature #4729: Presentación Fase II Feature #4729: Presentación Fase II

Project: Grupo 2A-2024
Status: New
Start date: 09/30/2024
Due date: 11/05/2024
Assignee:
Priority: Normal

1

Grupo 4A-2024 - Bug #4170: Parte II Bug #4170: Parte II

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 11/13/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4466: Estudio de los sensores Bug #4466: Estudio de los sensores

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4467: Estudio de raspberry Pi Bug #4467: Estudio de raspberry Pi

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 10/29/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4468: Realizar el Informe II Bug #4468: Realizar el Informe II

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4469: Presentar El informe II Bug #4469: Presentar El informe II

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4470: Ensamblar la maqueta con Ra... Bug #4470: Ensamblar la maqueta con Raspberry

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 11/13/2024
Assignee:
Priority: Normal
Grupo 6A-2024 - Feature #4223: Fase II Feature #4223: Fase II

Project: Grupo 6A-2024
Status: New
Start date: 10/01/2024
Due date: 11/05/2024
Assignee:
Priority: High
Grupo 6A-2024 - Feature #4224: Estudio de hardware Feature #4224: Estudio de hardware

Project: Grupo 6A-2024
Status: New
Start date: 10/01/2024
Due date: 10/08/2024
Assignee:
Priority: High

2

Grupo 3A-2024 - Feature #4331: Fase 2 Feature #4331: Fase 2

Project: Grupo 3A-2024
Status: New
Start date: 10/02/2024
Due date: 11/05/2024
Assignee:
Priority: High
Grupo 3A-2024 - Feature #4453: Instalacion del SO Feature #4453: Instalacion del SO

Project: Grupo 3A-2024
Status: New
Start date: 10/02/2024
Due date: 10/15/2024
Assignee: Cristian Sanchez
Priority: High
Grupo 7A-2024 - Feature #4270: Fase II Feature #4270: Fase II

Project: Grupo 7A-2024
Status: Resolved
Start date: 10/02/2024
Due date: 11/08/2024
Assignee:
Priority: High
Grupo 7A-2024 - Feature #4305: Estudiar las característica... Feature #4305: Estudiar las características Raspberry-Pi

Project: Grupo 7A-2024
Status: New
Start date: 10/02/2024
Due date: 10/06/2024
Assignee:
Priority: High

3

4

5

41

6

Grupo 7A-2024 - Feature #4305: Estudiar las característica... Feature #4305: Estudiar las características Raspberry-Pi

Project: Grupo 7A-2024
Status: New
Start date: 10/02/2024
Due date: 10/06/2024
Assignee:
Priority: High

7

8

Grupo 6A-2024 - Feature #4224: Estudio de hardware Feature #4224: Estudio de hardware

Project: Grupo 6A-2024
Status: New
Start date: 10/01/2024
Due date: 10/08/2024
Assignee:
Priority: High
Grupo 2A-2024 - Bug #4574: Desarrollo sensores Bug #4574: Desarrollo sensores

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4575: Conexión y Funcionamiento P... Bug #4575: Conexión y Funcionamiento Pantalla Azul

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4576: Conexión y Funcionamiento L... Bug #4576: Conexión y Funcionamiento Luces Leds

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4577: Conexión y Funcionamiento S... Bug #4577: Conexión y Funcionamiento Servo Motor

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4578: Conexión y Funcionamiento C... Bug #4578: Conexión y Funcionamiento Cerradura Eléctrica

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4579: Conexión y Funcionamiento S... Bug #4579: Conexión y Funcionamiento Sensor Huella digital

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4580: Conexión y Funcionamiento T... Bug #4580: Conexión y Funcionamiento Teclado Matricial

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4581: Fase III: Implementación Bug #4581: Fase III: Implementación

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #4486: Conexion remota al raspberr... Feature #4486: Conexion remota al raspberry pi 3

Project: Grupo 3A-2024
Status: New
Start date: 10/08/2024
Due date: 10/16/2024
Assignee: Cristian Sanchez
Priority: Normal
Grupo 6A-2024 - Feature #4730: Instalar el S.O. a la Raspb... Feature #4730: Instalar el S.O. a la Raspberry Pi

Project: Grupo 6A-2024
Status: New
Start date: 10/08/2024
Due date: 10/15/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4275: Prueba de los equipos solic... Feature #4275: Prueba de los equipos solicitados

Project: Grupo 7A-2024
Status: New
Start date: 10/08/2024
Due date: 10/22/2024
Assignee:
Priority: High

9

10

11

12

42

13

14

Grupo 1A-2024 - Feature #3821: Fase II: Programación Feature #3821: Fase II: Programación

Project: Grupo 1A-2024
Status: New
Start date: 10/14/2024
Due date: 11/04/2024
Assignee:
Priority: Normal
Grupo 1A-2024 - Feature #4281: Estudiar las característica... Feature #4281: Estudiar las características Rasperry-Pi

Project: Grupo 1A-2024
Status: New
Start date: 10/14/2024
Due date: 10/23/2024
Assignee:
Priority: Normal
Grupo 1A-2024 - Feature #4519: Conectividad VNC Feature #4519: Conectividad VNC

Project: Grupo 1A-2024
Status: New
Start date: 10/14/2024
Due date: 10/23/2024
Assignee: Cristian Huanca
Priority: Normal

15

Grupo 3A-2024 - Feature #4453: Instalacion del SO Feature #4453: Instalacion del SO

Project: Grupo 3A-2024
Status: New
Start date: 10/02/2024
Due date: 10/15/2024
Assignee: Cristian Sanchez
Priority: High
Grupo 6A-2024 - Feature #4730: Instalar el S.O. a la Raspb... Feature #4730: Instalar el S.O. a la Raspberry Pi

Project: Grupo 6A-2024
Status: New
Start date: 10/08/2024
Due date: 10/15/2024
Assignee:
Priority: Normal
Grupo 1A-2024 - Feature #4597: Planificacion Feature #4597: Planificacion

Project: Grupo 1A-2024
Status: New
Start date: 10/15/2024
Due date: 10/31/2024
Assignee: Tihare Cabello
Priority: Normal
Grupo 1A-2024 - Feature #4598: Analisis Feature #4598: Analisis

Project: Grupo 1A-2024
Status: New
Start date: 10/15/2024
Due date: 10/21/2024
Assignee: Cristian Huanca
Priority: Normal
Grupo 1A-2024 - Feature #4601: Especificación de requerimi... Feature #4601: Especificación de requerimientos

Project: Grupo 1A-2024
Status: New
Start date: 10/15/2024
Due date: 10/17/2024
Assignee: Tihare Cabello
Priority: Normal
Grupo 6A-2024 - Feature #4225: Elaborar casos de uso Feature #4225: Elaborar casos de uso

Project: Grupo 6A-2024
Status: New
Start date: 10/15/2024
Due date: 11/05/2024
Assignee:
Priority: High
Grupo 7A-2024 - Feature #4395: Diseñar Casos de Usos Feature #4395: Diseñar Casos de Usos

Project: Grupo 7A-2024
Status: New
Start date: 10/15/2024
Due date: 11/08/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4396: Desarrollar informe 2 Feature #4396: Desarrollar informe 2

Project: Grupo 7A-2024
Status: New
Start date: 10/15/2024
Due date: 11/05/2024
Assignee:
Priority: Normal

16

Grupo 3A-2024 - Feature #4486: Conexion remota al raspberr... Feature #4486: Conexion remota al raspberry pi 3

Project: Grupo 3A-2024
Status: New
Start date: 10/08/2024
Due date: 10/16/2024
Assignee: Cristian Sanchez
Priority: Normal

17

Grupo 1A-2024 - Feature #4601: Especificación de requerimi... Feature #4601: Especificación de requerimientos

Project: Grupo 1A-2024
Status: New
Start date: 10/15/2024
Due date: 10/17/2024
Assignee: Tihare Cabello
Priority: Normal
Grupo 1A-2024 - Feature #4600: Arquitectura Cliente-Servidor Feature #4600: Arquitectura Cliente-Servidor

Project: Grupo 1A-2024
Status: New
Start date: 10/17/2024
Due date: 10/19/2024
Assignee: Cristian Huanca
Priority: Normal
Grupo 3A-2024 - Feature #4515: Establecer requerimientos Feature #4515: Establecer requerimientos

Project: Grupo 3A-2024
Status: New
Start date: 10/17/2024
Due date: 10/20/2024
Assignee:
Priority: Normal

18

Grupo 1A-2024 - Feature #4606: Herramientas y tecnicas Feature #4606: Herramientas y tecnicas

Project: Grupo 1A-2024
Status: New
Start date: 10/18/2024
Due date: 11/01/2024
Assignee: Tihare Cabello
Priority: Normal

19

Grupo 1A-2024 - Feature #4600: Arquitectura Cliente-Servidor Feature #4600: Arquitectura Cliente-Servidor

Project: Grupo 1A-2024
Status: New
Start date: 10/17/2024
Due date: 10/19/2024
Assignee: Cristian Huanca
Priority: Normal
Grupo 1A-2024 - Feature #4602: Creacion Casos de Uso Feature #4602: Creacion Casos de Uso

Project: Grupo 1A-2024
Status: New
Start date: 10/19/2024
Due date: 10/21/2024
Assignee: byron santibanez
Priority: Normal
43

20

Grupo 3A-2024 - Feature #4515: Establecer requerimientos Feature #4515: Establecer requerimientos

Project: Grupo 3A-2024
Status: New
Start date: 10/17/2024
Due date: 10/20/2024
Assignee:
Priority: Normal
Grupo 1A-2024 - Feature #4279: Informe II Feature #4279: Informe II

Project: Grupo 1A-2024
Status: New
Start date: 10/20/2024
Due date: 11/04/2024
Assignee:
Priority: Normal
Grupo 1A-2024 - Feature #4283: Presentacion Fase II Feature #4283: Presentacion Fase II

Project: Grupo 1A-2024
Status: New
Start date: 10/20/2024
Due date: 11/04/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #4516: Establecer arquitectura Feature #4516: Establecer arquitectura

Project: Grupo 3A-2024
Status: New
Start date: 10/20/2024
Due date: 10/23/2024
Assignee:
Priority: Normal

21

Grupo 1A-2024 - Feature #4598: Analisis Feature #4598: Analisis

Project: Grupo 1A-2024
Status: New
Start date: 10/15/2024
Due date: 10/21/2024
Assignee: Cristian Huanca
Priority: Normal
Grupo 1A-2024 - Feature #4602: Creacion Casos de Uso Feature #4602: Creacion Casos de Uso

Project: Grupo 1A-2024
Status: New
Start date: 10/19/2024
Due date: 10/21/2024
Assignee: byron santibanez
Priority: Normal
Grupo 1A-2024 - Feature #4599: Diseño Feature #4599: Diseño

Project: Grupo 1A-2024
Status: New
Start date: 10/21/2024
Due date: 10/31/2024
Assignee: Liliana Galvez
Priority: Normal
Grupo 1A-2024 - Feature #4603: Creacion Diagrama de Secuencia Feature #4603: Creacion Diagrama de Secuencia

Project: Grupo 1A-2024
Status: New
Start date: 10/21/2024
Due date: 10/24/2024
Assignee: Cristian Huanca
Priority: Normal
Grupo 3A-2024 - Feature #4517: Realizar casos de uso Feature #4517: Realizar casos de uso

Project: Grupo 3A-2024
Status: New
Start date: 10/21/2024
Due date: 10/27/2024
Assignee:
Priority: Normal

22

Grupo 7A-2024 - Feature #4275: Prueba de los equipos solic... Feature #4275: Prueba de los equipos solicitados

Project: Grupo 7A-2024
Status: New
Start date: 10/08/2024
Due date: 10/22/2024
Assignee:
Priority: High
Grupo 4A-2024 - Bug #4508: Hacer caso de uso general Bug #4508: Hacer caso de uso general

Project: Grupo 4A-2024
Status: New
Start date: 10/22/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4509: Hacer casos de uso relacion... Bug #4509: Hacer casos de uso relacionados

Project: Grupo 4A-2024
Status: New
Start date: 10/22/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 6A-2024 - Feature #4229: Redactar informe II Feature #4229: Redactar informe II

Project: Grupo 6A-2024
Status: New
Start date: 10/22/2024
Due date: 11/05/2024
Assignee:
Priority: High

23

Grupo 1A-2024 - Feature #4281: Estudiar las característica... Feature #4281: Estudiar las características Rasperry-Pi

Project: Grupo 1A-2024
Status: New
Start date: 10/14/2024
Due date: 10/23/2024
Assignee:
Priority: Normal
Grupo 1A-2024 - Feature #4519: Conectividad VNC Feature #4519: Conectividad VNC

Project: Grupo 1A-2024
Status: New
Start date: 10/14/2024
Due date: 10/23/2024
Assignee: Cristian Huanca
Priority: Normal
Grupo 3A-2024 - Feature #4516: Establecer arquitectura Feature #4516: Establecer arquitectura

Project: Grupo 3A-2024
Status: New
Start date: 10/20/2024
Due date: 10/23/2024
Assignee:
Priority: Normal

24

Grupo 1A-2024 - Feature #4603: Creacion Diagrama de Secuencia Feature #4603: Creacion Diagrama de Secuencia

Project: Grupo 1A-2024
Status: New
Start date: 10/21/2024
Due date: 10/24/2024
Assignee: Cristian Huanca
Priority: Normal
Grupo 1A-2024 - Feature #4604: Diagrama de Clases Feature #4604: Diagrama de Clases

Project: Grupo 1A-2024
Status: New
Start date: 10/24/2024
Due date: 10/27/2024
Assignee: Tihare Cabello
Priority: Normal

25

26

Grupo 1A-2024 - Feature #4605: Diseño de interfaz Feature #4605: Diseño de interfaz

Project: Grupo 1A-2024
Status: New
Start date: 10/26/2024
Due date: 10/31/2024
Assignee: Liliana Galvez
Priority: Normal
44

27

Grupo 1A-2024 - Feature #4604: Diagrama de Clases Feature #4604: Diagrama de Clases

Project: Grupo 1A-2024
Status: New
Start date: 10/24/2024
Due date: 10/27/2024
Assignee: Tihare Cabello
Priority: Normal
Grupo 3A-2024 - Feature #4517: Realizar casos de uso Feature #4517: Realizar casos de uso

Project: Grupo 3A-2024
Status: New
Start date: 10/21/2024
Due date: 10/27/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4510: Realizar diseño de arquitec... Bug #4510: Realizar diseño de arquitectura del proyecto

Project: Grupo 4A-2024
Status: New
Start date: 10/27/2024
Due date: 10/30/2024
Assignee:
Priority: Normal

28

Grupo 3A-2024 - Feature #4518: Creación de boceto de inter... Feature #4518: Creación de boceto de interfaz de usuario

Project: Grupo 3A-2024
Status: New
Start date: 10/28/2024
Due date: 10/30/2024
Assignee:
Priority: Normal

29

Grupo 4A-2024 - Bug #4467: Estudio de raspberry Pi Bug #4467: Estudio de raspberry Pi

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 10/29/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #4454: Informe II Feature #4454: Informe II

Project: Grupo 3A-2024
Status: New
Start date: 10/29/2024
Due date: 11/05/2024
Assignee:
Priority: High
Grupo 6A-2024 - Feature #4230: Presentar informe II Feature #4230: Presentar informe II

Project: Grupo 6A-2024
Status: New
Start date: 10/29/2024
Due date: 11/05/2024
Assignee:
Priority: High

30

Grupo 3A-2024 - Feature #4518: Creación de boceto de inter... Feature #4518: Creación de boceto de interfaz de usuario

Project: Grupo 3A-2024
Status: New
Start date: 10/28/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4466: Estudio de los sensores Bug #4466: Estudio de los sensores

Project: Grupo 4A-2024
Status: New
Start date: 10/01/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4508: Hacer caso de uso general Bug #4508: Hacer caso de uso general

Project: Grupo 4A-2024
Status: New
Start date: 10/22/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4509: Hacer casos de uso relacion... Bug #4509: Hacer casos de uso relacionados

Project: Grupo 4A-2024
Status: New
Start date: 10/22/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4510: Realizar diseño de arquitec... Bug #4510: Realizar diseño de arquitectura del proyecto

Project: Grupo 4A-2024
Status: New
Start date: 10/27/2024
Due date: 10/30/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #4456: Presentación II Feature #4456: Presentación II

Project: Grupo 3A-2024
Status: New
Start date: 10/30/2024
Due date: 11/05/2024
Assignee:
Priority: High

31

Grupo 1A-2024 - Feature #4597: Planificacion Feature #4597: Planificacion

Project: Grupo 1A-2024
Status: New
Start date: 10/15/2024
Due date: 10/31/2024
Assignee: Tihare Cabello
Priority: Normal
Grupo 1A-2024 - Feature #4599: Diseño Feature #4599: Diseño

Project: Grupo 1A-2024
Status: New
Start date: 10/21/2024
Due date: 10/31/2024
Assignee: Liliana Galvez
Priority: Normal
Grupo 1A-2024 - Feature #4605: Diseño de interfaz Feature #4605: Diseño de interfaz

Project: Grupo 1A-2024
Status: New
Start date: 10/26/2024
Due date: 10/31/2024
Assignee: Liliana Galvez
Priority: Normal

1

Grupo 1A-2024 - Feature #4606: Herramientas y tecnicas Feature #4606: Herramientas y tecnicas

Project: Grupo 1A-2024
Status: New
Start date: 10/18/2024
Due date: 11/01/2024
Assignee: Tihare Cabello
Priority: Normal
Grupo 7A-2024 - Feature #4397: Presentación Informe 2 Feature #4397: Presentación Informe 2

Project: Grupo 7A-2024
Status: New
Start date: 11/01/2024
Due date: 11/05/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4583: Diseño base de la interfaza... Feature #4583: Diseño base de la interfaza de usuario

Project: Grupo 7A-2024
Status: New
Start date: 11/01/2024
Due date: 11/05/2024
Assignee:
Priority: Normal