Project

General

Profile

Calendar

Filters

« November | January 2023 »

Apply Clear

SundayMondayTuesdayWednesdayThursdayFridaySaturday
48

27

Grupo 4 A 2022 - Support #2287: Entrega bitácora #11 Support #2287: Entrega bitácora #11

Project: Grupo 4 A 2022
Status: New
Start date: 11/21/2022
Due date: 11/27/2022
Assignee: dylan rivero
Priority: Normal

28

Grupo 4 A 2022 - Support #2288: Entrega bitácora #12 Support #2288: Entrega bitácora #12

Project: Grupo 4 A 2022
Status: New
Start date: 11/28/2022
Due date: 12/04/2022
Assignee: dylan rivero
Priority: Normal

29

Grupo 6 A 2022 - Feature #1913: Depuración código Feature #1913: Depuración código

Project: Grupo 6 A 2022
Status: New
Start date: 11/29/2022
Due date: 12/01/2022
Assignee: luis huanca
Priority: Normal

30

Grupo 3 B 2022 - Feature #2336: Creación de la interfaz Feature #2336: Creación de la interfaz

Project: Grupo 3 B 2022
Status: New
Start date: 11/30/2022
Due date: 12/12/2022
Assignee: felipe guzman
Priority: Normal

1

Grupo 3 B 2022 - Feature #2344: Modificación del código Feature #2344: Modificación del código

Project: Grupo 3 B 2022
Status: New
Start date: 11/11/2022
Due date: 12/01/2022
Assignee: felipe guzman
Priority: Normal
Grupo 4 B 2022 - Feature #2330: Avance en la interfaz del p... Feature #2330: Avance en la interfaz del proyecto

Project: Grupo 4 B 2022
Status: Resolved
Start date: 11/24/2022
Due date: 12/01/2022
Assignee:
Priority: Normal
Grupo 6 A 2022 - Feature #1913: Depuración código Feature #1913: Depuración código

Project: Grupo 6 A 2022
Status: New
Start date: 11/29/2022
Due date: 12/01/2022
Assignee: luis huanca
Priority: Normal
Grupo 6 A 2022 - Feature #1918: Implementar efectos sonoros Feature #1918: Implementar efectos sonoros

Project: Grupo 6 A 2022
Status: New
Start date: 11/11/2022
Due date: 12/01/2022
Assignee: luciano vera
Priority: Normal
Grupo 3 B 2022 - Feature #2338: Creación código server Feature #2338: Creación código server

Project: Grupo 3 B 2022
Status: New
Start date: 12/01/2022
Due date: 12/05/2022
Assignee: felipe guzman
Priority: High
Grupo 4 B 2022 - Feature #2331: Ampliacion de la interfaz y... Feature #2331: Ampliacion de la interfaz y correcion de errores

Project: Grupo 4 B 2022
Status: Resolved
Start date: 12/01/2022
Due date: 12/19/2022
Assignee:
Priority: High
Grupo 6 A 2022 - Feature #2286: Confección de poster Feature #2286: Confección de poster

Project: Grupo 6 A 2022
Status: New
Start date: 12/01/2022
Due date: 12/09/2022
Assignee: luciano vera
Priority: Normal

2

Grupo 2 A 2022 - Feature #1895: Programación de la interfaz... Feature #1895: Programación de la interfaz gráfica

Project: Grupo 2 A 2022
Status: Resolved
Start date: 10/14/2022
Due date: 12/02/2022
Assignee: ivan viscarra
Priority: Normal
Grupo 2 A 2022 - Support #2158: Diseño de la interfaz gráfica Support #2158: Diseño de la interfaz gráfica

Project: Grupo 2 A 2022
Status: Resolved
Start date: 10/18/2022
Due date: 12/02/2022
Assignee: jhosep marca
Priority: Normal
Grupo 2 A 2022 - Support #2251: Prueba de función del sensor Support #2251: Prueba de función del sensor

Project: Grupo 2 A 2022
Status: Resolved
Start date: 11/04/2022
Due date: 12/02/2022
Assignee: Fabián orellana
Priority: Normal
Grupo 2 A 2022 - Feature #2265: Redacción del Manual Feature #2265: Redacción del Manual

Project: Grupo 2 A 2022
Status: Resolved
Start date: 11/10/2022
Due date: 12/02/2022
Assignee: jhosep marca
Priority: Normal
Grupo 2 A 2022 - Support #2274: Prueba funcionamiento de la... Support #2274: Prueba funcionamiento de la torreta

Project: Grupo 2 A 2022
Status: Resolved
Start date: 11/08/2022
Due date: 12/02/2022
Assignee:
Priority: Normal
Grupo 2 A 2022 - Feature #2317: Pruebas de funcionamiento Feature #2317: Pruebas de funcionamiento

Project: Grupo 2 A 2022
Status: New
Start date: 09/05/2022
Due date: 12/02/2022
Assignee:
Priority: Normal
Grupo 5 A 2022 - Feature #1946: Programación de la interfaz... Feature #1946: Programación de la interfaz ev3

Project: Grupo 5 A 2022
Status: In Progress
Start date: 10/24/2022
Due date: 12/02/2022
Assignee: fernanda ventura
Priority: Immediate
Grupo 5 A 2022 - Feature #1949: Codigo fuente Feature #1949: Codigo fuente

Project: Grupo 5 A 2022
Status: In Progress
Start date: 09/26/2022
Due date: 12/02/2022
Assignee: bryan vidaurre
Priority: High
Grupo 5 A 2022 - Feature #1953: Preaparación informe y pres... Feature #1953: Preaparación informe y presentación final

Project: Grupo 5 A 2022
Status: In Progress
Start date: 11/21/2022
Due date: 12/02/2022
Assignee: fernanda ventura
Priority: Normal

3

49

4

Grupo 4 A 2022 - Support #2288: Entrega bitácora #12 Support #2288: Entrega bitácora #12

Project: Grupo 4 A 2022
Status: New
Start date: 11/28/2022
Due date: 12/04/2022
Assignee: dylan rivero
Priority: Normal

5

Grupo 3 B 2022 - Feature #2337: Conexión del Robot EV3 WiFi Feature #2337: Conexión del Robot EV3 WiFi

Project: Grupo 3 B 2022
Status: New
Start date: 12/05/2022
Due date: 12/05/2022
Assignee: felipe guzman
Priority: Normal
Grupo 3 B 2022 - Feature #2338: Creación código server Feature #2338: Creación código server

Project: Grupo 3 B 2022
Status: New
Start date: 12/01/2022
Due date: 12/05/2022
Assignee: felipe guzman
Priority: High
Grupo 6 A 2022 - Feature #2277: Manual de Usuario Feature #2277: Manual de Usuario

Project: Grupo 6 A 2022
Status: New
Start date: 11/15/2022
Due date: 12/05/2022
Assignee: luciano vera
Priority: Normal
Grupo 3 B 2022 - Feature #2339: Creación código función Feature #2339: Creación código función

Project: Grupo 3 B 2022
Status: New
Start date: 12/05/2022
Due date: 12/08/2022
Assignee: felipe guzman
Priority: Normal
Grupo 5 A 2022 - Feature #1954: Preparación panel para la f... Feature #1954: Preparación panel para la feria

Project: Grupo 5 A 2022
Status: In Progress
Start date: 12/05/2022
Due date: 12/09/2022
Assignee: fernanda ventura
Priority: Normal

6

Grupo 6 A 2022 - Feature #1922: Informe final Feature #1922: Informe final

Project: Grupo 6 A 2022
Status: New
Start date: 12/06/2022
Due date: 12/14/2022
Assignee: Vranika Santiago
Priority: Normal

7

8

Grupo 3 B 2022 - Feature #2339: Creación código función Feature #2339: Creación código función

Project: Grupo 3 B 2022
Status: New
Start date: 12/05/2022
Due date: 12/08/2022
Assignee: felipe guzman
Priority: Normal

9

Grupo 5 A 2022 - Feature #1954: Preparación panel para la f... Feature #1954: Preparación panel para la feria

Project: Grupo 5 A 2022
Status: In Progress
Start date: 12/05/2022
Due date: 12/09/2022
Assignee: fernanda ventura
Priority: Normal
Grupo 5 A 2022 - Feature #1957: Manual de usario Feature #1957: Manual de usario

Project: Grupo 5 A 2022
Status: In Progress
Start date: 11/21/2022
Due date: 12/09/2022
Assignee: Alan rivera
Priority: Immediate
Grupo 6 A 2022 - Feature #2286: Confección de poster Feature #2286: Confección de poster

Project: Grupo 6 A 2022
Status: New
Start date: 12/01/2022
Due date: 12/09/2022
Assignee: luciano vera
Priority: Normal

10

Grupo 3 B 2022 - Feature #2334: Informe 3 Feature #2334: Informe 3

Project: Grupo 3 B 2022
Status: New
Start date: 12/10/2022
Due date: 12/16/2022
Assignee: felipe guzman
Priority: High
50

11

12

Grupo 3 B 2022 - Feature #2336: Creación de la interfaz Feature #2336: Creación de la interfaz

Project: Grupo 3 B 2022
Status: New
Start date: 11/30/2022
Due date: 12/12/2022
Assignee: felipe guzman
Priority: Normal
Grupo 4 A 2022 - Support #2011: Presentación e Informe Final Support #2011: Presentación e Informe Final

Project: Grupo 4 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/16/2022
Assignee:
Priority: Normal
Grupo 4 A 2022 - Feature #2016: Exhibición y presentación Feature #2016: Exhibición y presentación

Project: Grupo 4 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/18/2022
Assignee:
Priority: Normal
Grupo 4 A 2022 - Support #2018: Resultados del proyecto Support #2018: Resultados del proyecto

Project: Grupo 4 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/18/2022
Assignee:
Priority: Normal
Grupo 5 A 2022 - Feature #1955: Presentación del producto f... Feature #1955: Presentación del producto final

Project: Grupo 5 A 2022
Status: In Progress
Start date: 12/12/2022
Due date: 12/16/2022
Assignee: Alan rivera
Priority: Normal
Grupo 5 A 2022 - Feature #1956: Exhibición de los resultado... Feature #1956: Exhibición de los resultados del proyecto

Project: Grupo 5 A 2022
Status: In Progress
Start date: 12/12/2022
Due date: 12/16/2022
Assignee: Alan rivera
Priority: Normal
Grupo 6 A 2022 - Feature #1923: Presentación final Feature #1923: Presentación final

Project: Grupo 6 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/15/2022
Assignee: luciano vera
Priority: Normal

13

Grupo 5 A 2022 - Feature #1936: Ejecución del proyecto Feature #1936: Ejecución del proyecto

Project: Grupo 5 A 2022
Status: In Progress
Start date: 08/15/2022
Due date: 12/13/2022
Assignee: Alan rivera
Priority: High
Grupo 5 A 2022 - Feature #1941: Bitácoras Feature #1941: Bitácoras

Project: Grupo 5 A 2022
Status: In Progress
Start date: 08/15/2022
Due date: 12/13/2022
Assignee: Alan rivera
Priority: Immediate
Grupo 2 B 2022 - Feature #2318: Informe lll Feature #2318: Informe lll

Project: Grupo 2 B 2022
Status: New
Start date: 12/13/2022
Due date: 12/14/2022
Assignee: benjamin varas
Priority: Normal
Grupo 2 B 2022 - Feature #2319: Presentación lll Feature #2319: Presentación lll

Project: Grupo 2 B 2022
Status: New
Start date: 12/13/2022
Due date: 12/14/2022
Assignee: juan yampara
Priority: Normal

14

Grupo 2 B 2022 - Feature #2280: Programación del Robot Lego... Feature #2280: Programación del Robot Lego Mindstorm EV3 lll

Project: Grupo 2 B 2022
Status: New
Start date: 11/11/2022
Due date: 12/14/2022
Assignee: Hernán Vazque
Priority: Normal
Grupo 2 B 2022 - Feature #2318: Informe lll Feature #2318: Informe lll

Project: Grupo 2 B 2022
Status: New
Start date: 12/13/2022
Due date: 12/14/2022
Assignee: benjamin varas
Priority: Normal
Grupo 2 B 2022 - Feature #2319: Presentación lll Feature #2319: Presentación lll

Project: Grupo 2 B 2022
Status: New
Start date: 12/13/2022
Due date: 12/14/2022
Assignee: juan yampara
Priority: Normal
Grupo 2 B 2022 - Feature #2320: Creación de la Wiki Feature #2320: Creación de la Wiki

Project: Grupo 2 B 2022
Status: New
Start date: 11/11/2022
Due date: 12/14/2022
Assignee: joaquin guarachi
Priority: Normal
Grupo 2 B 2022 - Feature #2322: Cambios en la Interfaz Gráfica Feature #2322: Cambios en la Interfaz Gráfica

Project: Grupo 2 B 2022
Status: New
Start date: 11/11/2022
Due date: 12/14/2022
Assignee: Hernán Vazque
Priority: Normal
Grupo 3 B 2022 - Feature #2342: Ultimas modificaciones en l... Feature #2342: Ultimas modificaciones en la wiki

Project: Grupo 3 B 2022
Status: New
Start date: 12/14/2022
Due date: 12/14/2022
Assignee: felipe guzman
Priority: Normal
Grupo 6 A 2022 - Feature #1922: Informe final Feature #1922: Informe final

Project: Grupo 6 A 2022
Status: New
Start date: 12/06/2022
Due date: 12/14/2022
Assignee: Vranika Santiago
Priority: Normal

15

Grupo 1 A 2022 - Feature #1829: Proyecto Feature #1829: Proyecto

Project: Grupo 1 A 2022
Status: New
Start date: 08/23/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 1 A 2022 - Feature #1844: Formulacion de Proyecto Feature #1844: Formulacion de Proyecto

Project: Grupo 1 A 2022
Status: New
Start date: 08/23/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 1 A 2022 - Feature #1846: Programación del Robot Feature #1846: Programación del Robot

Project: Grupo 1 A 2022
Status: New
Start date: 08/30/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 1 A 2022 - Feature #1851: Integración / Pruebas Prepa... Feature #1851: Integración / Pruebas Preparación presentación final

Project: Grupo 1 A 2022
Status: New
Start date: 11/01/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 1 A 2022 - Feature #1882: Presentacion Final Feature #1882: Presentacion Final

Project: Grupo 1 A 2022
Status: New
Start date: 10/27/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 1 A 2022 - Feature #2155: Programación de Software de... Feature #2155: Programación de Software de tiro y movimiento

Project: Grupo 1 A 2022
Status: New
Start date: 10/06/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 2 A 2022 - Feature #1814: Presentación e Informe Fina... Feature #1814: Presentación e Informe Final del Proyecto

Project: Grupo 2 A 2022
Status: Resolved
Start date: 11/15/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 2 A 2022 - Support #2275: Desarrollo del Informe Fina... Support #2275: Desarrollo del Informe Final del Proyecto

Project: Grupo 2 A 2022
Status: Resolved
Start date: 11/15/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 2 A 2022 - Support #2276: Desarrollo de la Presentaci... Support #2276: Desarrollo de la Presentación del Informe Final

Project: Grupo 2 A 2022
Status: Resolved
Start date: 11/22/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 2 B 2022 - Feature #2266: Entrega lll Feature #2266: Entrega lll

Project: Grupo 2 B 2022
Status: New
Start date: 11/11/2022
Due date: 12/15/2022
Assignee:
Priority: Normal
Grupo 2 B 2022 - Feature #2279: Creación Manual de Usuario Feature #2279: Creación Manual de Usuario

Project: Grupo 2 B 2022
Status: New
Start date: 11/22/2022
Due date: 12/15/2022
Assignee: bairon nunez
Priority: Normal
Grupo 2 B 2022 - Feature #2281: Construcción del Robot Lego... Feature #2281: Construcción del Robot Lego Mindstorm EV3 ll

Project: Grupo 2 B 2022
Status: New
Start date: 11/22/2022
Due date: 12/15/2022
Assignee: juan yampara
Priority: Normal
Grupo 2 B 2022 - Feature #2282: Construcción de la pala del... Feature #2282: Construcción de la pala del Robot

Project: Grupo 2 B 2022
Status: New
Start date: 11/22/2022
Due date: 12/15/2022
Assignee: juan yampara
Priority: Normal
Grupo 3 A 2022 - Feature #1697: Informe 3 y Manual Feature #1697: Informe 3 y Manual

Project: Grupo 3 A 2022
Status: New
Start date: 11/08/2022
Due date: 12/15/2022
Assignee: francisco pantoja
Priority: High
Grupo 3 A 2022 - Feature #1699: Redactar Informe Feature #1699: Redactar Informe

Project: Grupo 3 A 2022
Status: New
Start date: 11/15/2022
Due date: 12/15/2022
Assignee: francisco pantoja
Priority: Normal
Grupo 3 A 2022 - Feature #1700: Redactar Manual Feature #1700: Redactar Manual

Project: Grupo 3 A 2022
Status: New
Start date: 11/08/2022
Due date: 12/15/2022
Assignee: daniel alday
Priority: Normal
Grupo 3 A 2022 - Feature #1701: Dar Formato al informe, pre... Feature #1701: Dar Formato al informe, presentación y manual

Project: Grupo 3 A 2022
Status: New
Start date: 11/15/2022
Due date: 12/15/2022
Assignee: Tomás Silva
Priority: Normal
Grupo 3 B 2022 - Bug #2340: Modificaciones en la Interf... Bug #2340: Modificaciones en la Interfaz Grafica

Project: Grupo 3 B 2022
Status: New
Start date: 12/15/2022
Due date: 12/15/2022
Assignee: felipe guzman
Priority: Normal
Grupo 6 A 2022 - Feature #1877: Parte lll Feature #1877: Parte lll

Project: Grupo 6 A 2022
Status: New
Start date: 11/08/2022
Due date: 12/15/2022
Assignee: Vranika Santiago
Priority: Normal
Grupo 6 A 2022 - Feature #1923: Presentación final Feature #1923: Presentación final

Project: Grupo 6 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/15/2022
Assignee: luciano vera
Priority: Normal
Grupo 4 A 2022 - Support #2017: Presentación producto final Support #2017: Presentación producto final

Project: Grupo 4 A 2022
Status: New
Start date: 12/15/2022
Due date: 12/16/2022
Assignee:
Priority: Normal

16

Grupo 3 B 2022 - Feature #2334: Informe 3 Feature #2334: Informe 3

Project: Grupo 3 B 2022
Status: New
Start date: 12/10/2022
Due date: 12/16/2022
Assignee: felipe guzman
Priority: High
Grupo 3 B 2022 - Feature #2335: Presentación N°3 Feature #2335: Presentación N°3

Project: Grupo 3 B 2022
Status: New
Start date: 12/16/2022
Due date: 12/16/2022
Assignee: felipe guzman
Priority: Normal
Grupo 3 B 2022 - Feature #2341: Pruebas de funcionamiento Feature #2341: Pruebas de funcionamiento

Project: Grupo 3 B 2022
Status: New
Start date: 12/16/2022
Due date: 12/16/2022
Assignee: felipe guzman
Priority: Normal
Grupo 4 A 2022 - Feature #1994: Documentación Feature #1994: Documentación

Project: Grupo 4 A 2022
Status: New
Start date: 08/15/2022
Due date: 12/16/2022
Assignee: dylan rivero
Priority: Normal
Grupo 4 A 2022 - Support #2011: Presentación e Informe Final Support #2011: Presentación e Informe Final

Project: Grupo 4 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/16/2022
Assignee:
Priority: Normal
Grupo 4 A 2022 - Support #2017: Presentación producto final Support #2017: Presentación producto final

Project: Grupo 4 A 2022
Status: New
Start date: 12/15/2022
Due date: 12/16/2022
Assignee:
Priority: Normal
Grupo 5 A 2022 - Feature #1952: Cierre del proyecto Feature #1952: Cierre del proyecto

Project: Grupo 5 A 2022
Status: In Progress
Start date: 11/21/2022
Due date: 12/16/2022
Assignee: Alan rivera
Priority: High
Grupo 5 A 2022 - Feature #1955: Presentación del producto f... Feature #1955: Presentación del producto final

Project: Grupo 5 A 2022
Status: In Progress
Start date: 12/12/2022
Due date: 12/16/2022
Assignee: Alan rivera
Priority: Normal
Grupo 5 A 2022 - Feature #1956: Exhibición de los resultado... Feature #1956: Exhibición de los resultados del proyecto

Project: Grupo 5 A 2022
Status: In Progress
Start date: 12/12/2022
Due date: 12/16/2022
Assignee: Alan rivera
Priority: Normal

17

51

18

Grupo 3 B 2022 - Feature #2333: Manual de usuario Feature #2333: Manual de usuario

Project: Grupo 3 B 2022
Status: New
Start date: 11/17/2022
Due date: 12/18/2022
Assignee: milenka marca
Priority: Normal
Grupo 4 A 2022 - Feature #2016: Exhibición y presentación Feature #2016: Exhibición y presentación

Project: Grupo 4 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/18/2022
Assignee:
Priority: Normal
Grupo 4 A 2022 - Support #2018: Resultados del proyecto Support #2018: Resultados del proyecto

Project: Grupo 4 A 2022
Status: New
Start date: 12/12/2022
Due date: 12/18/2022
Assignee:
Priority: Normal

19

Grupo 4 B 2022 - Feature #2331: Ampliacion de la interfaz y... Feature #2331: Ampliacion de la interfaz y correcion de errores

Project: Grupo 4 B 2022
Status: Resolved
Start date: 12/01/2022
Due date: 12/19/2022
Assignee:
Priority: High
Grupo 4 B 2022 - Bug #2332: Presentacion e informe 3 Bug #2332: Presentacion e informe 3

Project: Grupo 4 B 2022
Status: Resolved
Start date: 11/24/2022
Due date: 12/19/2022
Assignee:
Priority: Urgent

20

21

22

23

24

52

25

26

27

28

29

30

31

issue beginning this day issue ending this day issue beginning and ending this day