Grupo 6 2019 - Feature #847: Pruebas de Moviento Avanzado Feature #847: Pruebas de Moviento Avanzado

Project: Grupo 6 2019
Status: New
Start date: 09/23/2019
Due date: 09/30/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #687: 4.1 Verificación de la inte... Feature #687: 4.1 Verificación de la interfaz gráfica

Project: Grupo 3 2019
Status: New
Start date: 09/30/2019
Due date: 10/15/2019
Assignee:
Priority: Normal

1

Grupo 4 2019 - Support #758: Diseño de la UI Support #758: Diseño de la UI

Project: Grupo 4 2019
Status: New
Start date: 10/01/2019
Due date: 10/01/2019
Assignee: Cristian Fritis
Priority: Normal
Grupo 3 2019 - Feature #871: 3.2 Inicio para implementar... Feature #871: 3.2 Inicio para implementar la Interfaz gráfica.

Project: Grupo 3 2019
Status: New
Start date: 10/01/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 4 2019 - Support #755: Creación del programa para PC Support #755: Creación del programa para PC

Project: Grupo 4 2019
Status: New
Start date: 10/01/2019
Due date: 10/31/2019
Assignee: Kevin Rodriguez
Priority: Normal

2

3

Grupo 2 2019 - Feature #722: 3.2. Hacer código de movimi... Feature #722: 3.2. Hacer código de movimientos del brazo

Project: Grupo 2 2019
Status: New
Start date: 08/27/2019
Due date: 10/03/2019
Assignee: Julio Rivera
Priority: High
Grupo 2 2019 - Feature #724: 4.1. Realizar conexión remota Feature #724: 4.1. Realizar conexión remota

Project: Grupo 2 2019
Status: New
Start date: 09/15/2019
Due date: 10/03/2019
Assignee: Mauricio Mamani
Priority: Normal
Grupo 2 2019 - Feature #883: 4.2. Realizar interfaz visual Feature #883: 4.2. Realizar interfaz visual

Project: Grupo 2 2019
Status: New
Start date: 08/20/2019
Due date: 10/03/2019
Assignee: Mauricio Mamani
Priority: Normal
Grupo 3 2019 - Feature #881: 2.9.2 Material Audiovisual ... Feature #881: 2.9.2 Material Audiovisual del robot "Crusader Fox"

Project: Grupo 3 2019
Status: New
Start date: 09/27/2019
Due date: 10/03/2019
Assignee:
Priority: Normal
Grupo 4 2019 - Feature #740: Programar el giro y el agar... Feature #740: Programar el giro y el agarre del brazo

Project: Grupo 4 2019
Status: New
Start date: 09/03/2019
Due date: 10/03/2019
Assignee: Cristian Fritis
Priority: Normal
Grupo 4 2019 - Feature #752: Prueba con la garra Feature #752: Prueba con la garra

Project: Grupo 4 2019
Status: New
Start date: 09/24/2019
Due date: 10/03/2019
Assignee: Cristian Fritis
Priority: Normal
Grupo 1 2019 - Feature #928: Realizar el informe del ava... Feature #928: Realizar el informe del avance de proyecto.

Project: Grupo 1 2019
Status: New
Start date: 10/03/2019
Due date: 10/16/2019
Assignee: Benjamin Poblete
Priority: Normal
Grupo 1 2019 - Feature #929: Realizar presentacion del a... Feature #929: Realizar presentacion del avance de proyecto.

Project: Grupo 1 2019
Status: New
Start date: 10/03/2019
Due date: 10/16/2019
Assignee: Angelina Orozco
Priority: Normal
Grupo 1 2019 - Feature #930: Realizar la documentacion d... Feature #930: Realizar la documentacion de los codigos.

Project: Grupo 1 2019
Status: New
Start date: 10/03/2019
Due date: 10/16/2019
Assignee: Angelina Orozco
Priority: Normal
Grupo 4 2019 - Support #759: Diseño de la estructura del... Support #759: Diseño de la estructura del codigo

Project: Grupo 4 2019
Status: New
Start date: 10/03/2019
Due date: 10/08/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 4 2019 - Support #888: Rediseñar la garra Support #888: Rediseñar la garra

Project: Grupo 4 2019
Status: New
Start date: 10/03/2019
Due date: 10/15/2019
Assignee: Jerson Lima
Priority: Urgent

4

5

41

6

7

Grupo 6 2019 - Feature #887: Informe 2 Feature #887: Informe 2

Project: Grupo 6 2019
Status: New
Start date: 10/07/2019
Due date: 10/16/2019
Assignee:
Priority: Normal
Grupo 6 2019 - Feature #891: Presentacion 2 Feature #891: Presentacion 2

Project: Grupo 6 2019
Status: New
Start date: 10/07/2019
Due date: 10/16/2019
Assignee:
Priority: Normal

8

Grupo 4 2019 - Support #759: Diseño de la estructura del... Support #759: Diseño de la estructura del codigo

Project: Grupo 4 2019
Status: New
Start date: 10/03/2019
Due date: 10/08/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 1 2019 - Feature #916: Realizar pruebas de funcion... Feature #916: Realizar pruebas de funcionalidad (segunda parte).

Project: Grupo 1 2019
Status: New
Start date: 10/08/2019
Due date: 12/20/2019
Assignee: Angelina Orozco
Priority: Normal

9

Grupo 3 2019 - Feature #894: 2.10 Presentacion n°2 Feature #894: 2.10 Presentacion n°2

Project: Grupo 3 2019
Status: New
Start date: 10/09/2019
Due date: 10/17/2019
Assignee:
Priority: Normal

10

Grupo 1 2019 - Feature #922: Desarrollar el codigo de la... Feature #922: Desarrollar el codigo de la interfaz.

Project: Grupo 1 2019
Status: New
Start date: 09/19/2019
Due date: 10/10/2019
Assignee: Gustavo Olivares
Priority: Normal
Grupo 2 2019 - Support #884: 6.6. Realizar segunda parte... Support #884: 6.6. Realizar segunda parte del informe del proyecto

Project: Grupo 2 2019
Status: New
Start date: 09/10/2019
Due date: 10/10/2019
Assignee: Sebastian Lukich
Priority: Normal
Grupo 1 2019 - Feature #905: Rediseñar el robot (segunda... Feature #905: Rediseñar el robot (segunda parte).

Project: Grupo 1 2019
Status: New
Start date: 10/10/2019
Due date: 10/22/2019
Assignee: Ernesto Garcia
Priority: Normal
Grupo 2 2019 - Support #885: 6.7. Realizar informe final Support #885: 6.7. Realizar informe final

Project: Grupo 2 2019
Status: New
Start date: 10/10/2019
Due date: 12/05/2019
Assignee: Sebastian Lukich
Priority: Normal
Grupo 4 2019 - Support #760: Programar el codigo Support #760: Programar el codigo

Project: Grupo 4 2019
Status: New
Start date: 10/10/2019
Due date: 10/17/2019
Assignee: Cristian Fritis
Priority: Normal

11

12

42

13

Grupo 6 2019 - Feature #848: Pruebas de Moviento con la ... Feature #848: Pruebas de Moviento con la Interfaz del Robot

Project: Grupo 6 2019
Status: New
Start date: 10/13/2019
Due date: 01/06/2020
Assignee:
Priority: Normal

14

Grupo 3 2019 - Feature #873: 3.4 Implementar interfaz gr... Feature #873: 3.4 Implementar interfaz gráfica Final

Project: Grupo 3 2019
Status: New
Start date: 10/14/2019
Due date: 10/23/2019
Assignee:
Priority: Normal

15

Grupo 1 2019 - Feature #918: Comunicacion e interfaz gra... Feature #918: Comunicacion e interfaz grafica del robot.

Project: Grupo 1 2019
Status: New
Start date: 08/29/2019
Due date: 10/15/2019
Assignee: Gustavo Olivares
Priority: Normal
Grupo 1 2019 - Feature #923: Realizar el diseño de la in... Feature #923: Realizar el diseño de la interfaz grafica.

Project: Grupo 1 2019
Status: New
Start date: 09/19/2019
Due date: 10/15/2019
Assignee: Gustavo Olivares
Priority: Normal
Grupo 3 2019 - Feature #687: 4.1 Verificación de la inte... Feature #687: 4.1 Verificación de la interfaz gráfica

Project: Grupo 3 2019
Status: New
Start date: 09/30/2019
Due date: 10/15/2019
Assignee:
Priority: Normal
Grupo 4 2019 - Feature #709: Diseño del robot Feature #709: Diseño del robot

Project: Grupo 4 2019
Status: New
Start date: 08/13/2019
Due date: 10/15/2019
Assignee: Jerson Lima
Priority: Urgent
Grupo 4 2019 - Support #888: Rediseñar la garra Support #888: Rediseñar la garra

Project: Grupo 4 2019
Status: New
Start date: 10/03/2019
Due date: 10/15/2019
Assignee: Jerson Lima
Priority: Urgent
Grupo 1 2019 - Feature #917: Calibrar los movimientos de... Feature #917: Calibrar los movimientos del robot (segunda parte).

Project: Grupo 1 2019
Status: New
Start date: 10/15/2019
Due date: 12/20/2019
Assignee: Angelina Orozco
Priority: Normal
Grupo 3 2019 - Feature #688: 4.2 Verificación remota des... Feature #688: 4.2 Verificación remota desde la Interfaz grafica

Project: Grupo 3 2019
Status: New
Start date: 10/15/2019
Due date: 10/30/2019
Assignee:
Priority: Normal
Grupo 6 2019 - Feature #851: Investigacion de como Reali... Feature #851: Investigacion de como Realizar la Interfaz del Robot

Project: Grupo 6 2019
Status: New
Start date: 10/15/2019
Due date: 10/20/2019
Assignee:
Priority: Normal

16

Grupo 1 2019 - Feature #928: Realizar el informe del ava... Feature #928: Realizar el informe del avance de proyecto.

Project: Grupo 1 2019
Status: New
Start date: 10/03/2019
Due date: 10/16/2019
Assignee: Benjamin Poblete
Priority: Normal
Grupo 1 2019 - Feature #929: Realizar presentacion del a... Feature #929: Realizar presentacion del avance de proyecto.

Project: Grupo 1 2019
Status: New
Start date: 10/03/2019
Due date: 10/16/2019
Assignee: Angelina Orozco
Priority: Normal
Grupo 1 2019 - Feature #930: Realizar la documentacion d... Feature #930: Realizar la documentacion de los codigos.

Project: Grupo 1 2019
Status: New
Start date: 10/03/2019
Due date: 10/16/2019
Assignee: Angelina Orozco
Priority: Normal
Grupo 4 2019 - Support #770: Informe #2 Avance Support #770: Informe #2 Avance

Project: Grupo 4 2019
Status: New
Start date: 09/24/2019
Due date: 10/16/2019
Assignee: Camila Cerda
Priority: Normal
Grupo 4 2019 - Support #771: Presentacion #2 Avance Support #771: Presentacion #2 Avance

Project: Grupo 4 2019
Status: New
Start date: 09/24/2019
Due date: 10/16/2019
Assignee: Camila Cerda
Priority: Normal
Grupo 6 2019 - Feature #887: Informe 2 Feature #887: Informe 2

Project: Grupo 6 2019
Status: New
Start date: 10/07/2019
Due date: 10/16/2019
Assignee:
Priority: Normal
Grupo 6 2019 - Feature #891: Presentacion 2 Feature #891: Presentacion 2

Project: Grupo 6 2019
Status: New
Start date: 10/07/2019
Due date: 10/16/2019
Assignee:
Priority: Normal

17

Grupo 3 2019 - Feature #878: 2.9 Informe de Avance Feature #878: 2.9 Informe de Avance

Project: Grupo 3 2019
Status: New
Start date: 09/24/2019
Due date: 10/17/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #894: 2.10 Presentacion n°2 Feature #894: 2.10 Presentacion n°2

Project: Grupo 3 2019
Status: New
Start date: 10/09/2019
Due date: 10/17/2019
Assignee:
Priority: Normal
Grupo 4 2019 - Support #760: Programar el codigo Support #760: Programar el codigo

Project: Grupo 4 2019
Status: New
Start date: 10/10/2019
Due date: 10/17/2019
Assignee: Cristian Fritis
Priority: Normal
Grupo 5 2019 - Feature #696: 4. Implementación de instru... Feature #696: 4. Implementación de instrucciones y movimientos complementarios.

Project: Grupo 5 2019
Status: In Progress
Start date: 08/27/2019
Due date: 10/17/2019
Assignee: Patricio Gutierrez
Priority: Normal
Grupo 5 2019 - Feature #828: 2.5 Informe de avance Feature #828: 2.5 Informe de avance

Project: Grupo 5 2019
Status: Resolved
Start date: 09/17/2019
Due date: 10/17/2019
Assignee: Katia Layi
Priority: Normal
Grupo 5 2019 - Feature #862: 2.6 Presentación de avance ... Feature #862: 2.6 Presentación de avance del proyecto

Project: Grupo 5 2019
Status: Resolved
Start date: 09/17/2019
Due date: 10/17/2019
Assignee: Sebastian Torres
Priority: Normal
Grupo 5 2019 - Feature #867: 4.4 Interfaz gráfica Feature #867: 4.4 Interfaz gráfica

Project: Grupo 5 2019
Status: In Progress
Start date: 09/24/2019
Due date: 10/17/2019
Assignee: Marco Chayo
Priority: Normal

18

19

43

20

Grupo 6 2019 - Feature #851: Investigacion de como Reali... Feature #851: Investigacion de como Realizar la Interfaz del Robot

Project: Grupo 6 2019
Status: New
Start date: 10/15/2019
Due date: 10/20/2019
Assignee:
Priority: Normal

21

Grupo 6 2019 - Support #843: Grabar Video del Funcionami... Support #843: Grabar Video del Funcionamiento del Robot

Project: Grupo 6 2019
Status: New
Start date: 10/21/2019
Due date: 01/08/2020
Assignee:
Priority: Normal

22

Grupo 1 2019 - Feature #898: Diseño del robot llamado "R... Feature #898: Diseño del robot llamado "R.S.B.A".

Project: Grupo 1 2019
Status: New
Start date: 08/20/2019
Due date: 10/22/2019
Assignee: Ernesto Garcia
Priority: Normal
Grupo 1 2019 - Feature #905: Rediseñar el robot (segunda... Feature #905: Rediseñar el robot (segunda parte).

Project: Grupo 1 2019
Status: New
Start date: 10/10/2019
Due date: 10/22/2019
Assignee: Ernesto Garcia
Priority: Normal
Grupo 4 2019 - Feature #743: Movimientos Automaticos Feature #743: Movimientos Automaticos

Project: Grupo 4 2019
Status: New
Start date: 09/10/2019
Due date: 10/22/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 4 2019 - Feature #748: Comunicación Remota Feature #748: Comunicación Remota

Project: Grupo 4 2019
Status: New
Start date: 09/17/2019
Due date: 10/22/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 4 2019 - Feature #753: Prueba de secuencia automatica Feature #753: Prueba de secuencia automatica

Project: Grupo 4 2019
Status: New
Start date: 09/19/2019
Due date: 10/22/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 1 2019 - Feature #931: Realizar el videoclip del r... Feature #931: Realizar el videoclip del robot.

Project: Grupo 1 2019
Status: New
Start date: 10/22/2019
Due date: 10/31/2019
Assignee: Daniel Ramirez
Priority: Normal
Grupo 3 2019 - Feature #690: 5.1 pruebas de velocidad y ... Feature #690: 5.1 pruebas de velocidad y estabilidad en el movimiento

Project: Grupo 3 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #691: 5.2 pruebas de velocidad y ... Feature #691: 5.2 pruebas de velocidad y estabilidad en rotaciones

Project: Grupo 3 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #692: 5.3 pruebas de velocidad y ... Feature #692: 5.3 pruebas de velocidad y estabilidad en el agarre

Project: Grupo 3 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 4 2019 - Support #761: Revision de Errores Support #761: Revision de Errores

Project: Grupo 4 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 5 2019 - Feature #863: 2.8 Presentación de proyect... Feature #863: 2.8 Presentación de proyecto final

Project: Grupo 5 2019
Status: Resolved
Start date: 10/22/2019
Due date: 11/19/2019
Assignee: Sebastian Torres
Priority: Normal
Grupo 5 2019 - Feature #864: 2.7 Informe proyecto final Feature #864: 2.7 Informe proyecto final

Project: Grupo 5 2019
Status: Resolved
Start date: 10/22/2019
Due date: 11/19/2019
Assignee: Katia Layi
Priority: Normal
Grupo 6 2019 - Feature #841: Diseño de interfaz para ope... Feature #841: Diseño de interfaz para operar al robot

Project: Grupo 6 2019
Status: New
Start date: 10/22/2019
Due date: 01/06/2020
Assignee:
Priority: Normal
Grupo 6 2019 - Feature #892: informe final Feature #892: informe final

Project: Grupo 6 2019
Status: New
Start date: 10/22/2019
Due date: 01/13/2020
Assignee:
Priority: Normal
Grupo 6 2019 - Feature #893: presentacion final Feature #893: presentacion final

Project: Grupo 6 2019
Status: New
Start date: 10/22/2019
Due date: 01/13/2020
Assignee:
Priority: Normal

23

Grupo 3 2019 - Feature #873: 3.4 Implementar interfaz gr... Feature #873: 3.4 Implementar interfaz gráfica Final

Project: Grupo 3 2019
Status: New
Start date: 10/14/2019
Due date: 10/23/2019
Assignee:
Priority: Normal

24

Grupo 3 2019 - Feature #690: 5.1 pruebas de velocidad y ... Feature #690: 5.1 pruebas de velocidad y estabilidad en el movimiento

Project: Grupo 3 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #691: 5.2 pruebas de velocidad y ... Feature #691: 5.2 pruebas de velocidad y estabilidad en rotaciones

Project: Grupo 3 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #692: 5.3 pruebas de velocidad y ... Feature #692: 5.3 pruebas de velocidad y estabilidad en el agarre

Project: Grupo 3 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #871: 3.2 Inicio para implementar... Feature #871: 3.2 Inicio para implementar la Interfaz gráfica.

Project: Grupo 3 2019
Status: New
Start date: 10/01/2019
Due date: 10/24/2019
Assignee:
Priority: Normal
Grupo 4 2019 - Feature #737: Implementación de los movim... Feature #737: Implementación de los movimientos

Project: Grupo 4 2019
Status: New
Start date: 08/22/2019
Due date: 10/24/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 4 2019 - Support #744: Revision de Errores Support #744: Revision de Errores

Project: Grupo 4 2019
Status: New
Start date: 09/12/2019
Due date: 10/24/2019
Assignee: Cristian Fritis
Priority: Normal
Grupo 4 2019 - Support #761: Revision de Errores Support #761: Revision de Errores

Project: Grupo 4 2019
Status: New
Start date: 10/22/2019
Due date: 10/24/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 3 2019 - Feature #694: 5.4 pruebas en simulación d... Feature #694: 5.4 pruebas en simulación de competencia de “Flip Tac Toe”

Project: Grupo 3 2019
Status: New
Start date: 10/24/2019
Due date: 10/29/2019
Assignee:
Priority: Normal
Grupo 3 2019 - Feature #874: 3.5 Manual de usuario Feature #874: 3.5 Manual de usuario

Project: Grupo 3 2019
Status: New
Start date: 10/24/2019
Due date: 11/06/2019
Assignee:
Priority: Normal

25

26

44

27

Grupo 2 2019 - Feature #739: 6.4. Implementar wiki del p... Feature #739: 6.4. Implementar wiki del proyecto

Project: Grupo 2 2019
Status: New
Start date: 10/27/2019
Due date: 11/09/2019
Assignee: Javier Mamani
Priority: Urgent

28

Grupo 6 2019 - Support #844: Editar el Video del Funcion... Support #844: Editar el Video del Funcionamiento del Robot

Project: Grupo 6 2019
Status: New
Start date: 10/28/2019
Due date: 01/08/2020
Assignee:
Priority: Normal

29

Grupo 3 2019 - Feature #694: 5.4 pruebas en simulación d... Feature #694: 5.4 pruebas en simulación de competencia de “Flip Tac Toe”

Project: Grupo 3 2019
Status: New
Start date: 10/24/2019
Due date: 10/29/2019
Assignee:
Priority: Normal
Grupo 4 2019 - Support #763: Pruebas con el computador Support #763: Pruebas con el computador

Project: Grupo 4 2019
Status: New
Start date: 10/29/2019
Due date: 10/31/2019
Assignee: Cristian Fritis
Priority: Normal
Grupo 5 2019 - Feature #826: 2.9 Manual de usuario Feature #826: 2.9 Manual de usuario

Project: Grupo 5 2019
Status: Resolved
Start date: 10/29/2019
Due date: 11/19/2019
Assignee: Sebastian Torres
Priority: Normal
Grupo 5 2019 - Feature #865: 2.10 Wiki Feature #865: 2.10 Wiki

Project: Grupo 5 2019
Status: Resolved
Start date: 10/29/2019
Due date: 11/19/2019
Assignee: Katia Layi
Priority: Normal
Grupo 6 2019 - Feature #842: Programar la Interfaz del R... Feature #842: Programar la Interfaz del Robot

Project: Grupo 6 2019
Status: New
Start date: 10/29/2019
Due date: 11/06/2019
Assignee:
Priority: Normal

30

Grupo 3 2019 - Feature #688: 4.2 Verificación remota des... Feature #688: 4.2 Verificación remota desde la Interfaz grafica

Project: Grupo 3 2019
Status: New
Start date: 10/15/2019
Due date: 10/30/2019
Assignee:
Priority: Normal

31

Grupo 1 2019 - Feature #927: Realizar la wiki del proyecto. Feature #927: Realizar la wiki del proyecto.

Project: Grupo 1 2019
Status: New
Start date: 09/12/2019
Due date: 10/31/2019
Assignee: Benjamin Poblete
Priority: Normal
Grupo 1 2019 - Feature #931: Realizar el videoclip del r... Feature #931: Realizar el videoclip del robot.

Project: Grupo 1 2019
Status: New
Start date: 10/22/2019
Due date: 10/31/2019
Assignee: Daniel Ramirez
Priority: Normal
Grupo 2 2019 - Feature #727: 5.1. Preparar para competir Feature #727: 5.1. Preparar para competir

Project: Grupo 2 2019
Status: New
Start date: 08/29/2019
Due date: 10/31/2019
Assignee: Sebastian Lukich
Priority: High
Grupo 4 2019 - Support #755: Creación del programa para PC Support #755: Creación del programa para PC

Project: Grupo 4 2019
Status: New
Start date: 10/01/2019
Due date: 10/31/2019
Assignee: Kevin Rodriguez
Priority: Normal
Grupo 4 2019 - Support #763: Pruebas con el computador Support #763: Pruebas con el computador

Project: Grupo 4 2019
Status: New
Start date: 10/29/2019
Due date: 10/31/2019
Assignee: Cristian Fritis
Priority: Normal
Grupo 1 2019 - Feature #932: Realizar el manual de usuario. Feature #932: Realizar el manual de usuario.

Project: Grupo 1 2019
Status: New
Start date: 10/31/2019
Due date: 11/13/2019
Assignee: Benjamin Poblete
Priority: Normal
Grupo 4 2019 - Support #772: Informe #3 Final Support #772: Informe #3 Final

Project: Grupo 4 2019
Status: New
Start date: 10/31/2019
Due date: 11/13/2019
Assignee: Camila Cerda
Priority: Normal
Grupo 4 2019 - Support #773: Presentacion #3 Final Support #773: Presentacion #3 Final

Project: Grupo 4 2019
Status: New
Start date: 10/31/2019
Due date: 11/13/2019
Assignee: Camila Cerda
Priority: Normal

1

Grupo 5 2019 - Feature #889: 2.11 Video Feature #889: 2.11 Video

Project: Grupo 5 2019
Status: Resolved
Start date: 11/01/2019
Due date: 11/19/2019
Assignee: Adolfo Navea
Priority: Normal

2