Project

General

Profile

Calendar

Filters

« July | September »

Apply Clear

SundayMondayTuesdayWednesdayThursdayFridaySaturday
31

28

29

30

31

1

2

3

32

4

5

6

7

8

Grupo 3 B - Feature #3789: Fase 1 - Familiarización co... Feature #3789: Fase 1 - Familiarización con el robot

Project: Grupo 3 B
Status: Resolved
Start date: 08/08/2024
Due date: 09/10/2024
Assignee:
Priority: Urgent
Grupo 3 B - Feature #3799: Prototipo del Robot Feature #3799: Prototipo del Robot

Project: Grupo 3 B
Status: Resolved
Start date: 08/08/2024
Due date: 08/30/2024
Assignee:
Priority: High
Grupo 3 B - Feature #3810: Primera base del robot Feature #3810: Primera base del robot

Project: Grupo 3 B
Status: Resolved
Start date: 08/08/2024
Due date: 08/09/2024
Assignee: ivan collao
Priority: Normal

9

Grupo 3 B - Feature #3810: Primera base del robot Feature #3810: Primera base del robot

Project: Grupo 3 B
Status: Resolved
Start date: 08/08/2024
Due date: 08/09/2024
Assignee: ivan collao
Priority: Normal
Grupo 3 B - Feature #3940: Bitácoras Feature #3940: Bitácoras

Project: Grupo 3 B
Status: Resolved
Start date: 08/09/2024
Due date: 11/12/2024
Assignee: martin delsolar
Priority: Normal

10

33

11

12

Grupo 1 A - Feature #3859: Etapa N°1 Feature #3859: Etapa N°1

Project: Grupo 1 A
Status: New
Start date: 08/12/2024
Due date: 09/05/2024
Assignee:
Priority: Immediate
Grupo 1 A - Feature #3871: Documentacion Etapa N°1 Feature #3871: Documentacion Etapa N°1

Project: Grupo 1 A
Status: New
Start date: 08/12/2024
Due date: 09/05/2024
Assignee:
Priority: Normal
Grupo 1 A - Feature #3872: Bitácoras Semanales Feature #3872: Bitácoras Semanales

Project: Grupo 1 A
Status: New
Start date: 08/12/2024
Due date: 09/05/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3707: Fase 1 Feature #3707: Fase 1

Project: Grupo 2 A
Status: Resolved
Start date: 08/12/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3710: Asignación de roles Feature #3710: Asignación de roles

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3913: Avance del EV3-F1 Feature #3913: Avance del EV3-F1

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3914: Entrega del Kit EV3 Feature #3914: Entrega del Kit EV3

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3915: Investigación sobre EV3 Feature #3915: Investigación sobre EV3

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3916: Busqueda de diseño para rob... Feature #3916: Busqueda de diseño para robot EV3

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 09/16/2024
Assignee:
Priority: Normal
Grupo 3 A - Support #3690: Bitácora Semana 1 Support #3690: Bitácora Semana 1

Project: Grupo 3 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee: catalina ramirez
Priority: Normal
Grupo 3 A - Support #4010: Conexión SSH por medio de B... Support #4010: Conexión SSH por medio de Bluetooth a EV3

Project: Grupo 3 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee: JEANY ARAVENA
Priority: Immediate
Grupo 4 A - Feature #3733: Proyecto v.1 Feature #3733: Proyecto v.1

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 09/13/2024
Assignee:
Priority: High
Grupo 4 A - Feature #3735: Diseño y armado de la 1era ... Feature #3735: Diseño y armado de la 1era version de GTP-1

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 08/26/2024
Assignee: alex munoz
Priority: Normal
Grupo 4 A - Feature #3738: Investigacion sobre la form... Feature #3738: Investigacion sobre la forma de programar el proyecto

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 08/28/2024
Assignee: benjamin flores
Priority: High
Grupo 4 A - Support #3740: Bitacoras Support #3740: Bitacoras

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 11/17/2024
Assignee: benjamin flores
Priority: Normal
Grupo 4 A - Support #3741: Bitacora1 Support #3741: Bitacora1

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 08/18/2024
Assignee:
Priority: Normal

13

Grupo 1 B - Feature #3764: Conteo de piezas Feature #3764: Conteo de piezas

Project: Grupo 1 B
Status: New
Start date: 08/13/2024
Due date: 08/13/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #3754: Etapa 1 (Diseño) Feature #3754: Etapa 1 (Diseño)

Project: Grupo 1 B
Status: New
Start date: 08/13/2024
Due date: 09/15/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #3763: Tareas Feature #3763: Tareas

Project: Grupo 1 B
Status: New
Start date: 08/13/2024
Due date: 08/15/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #3766: Prototipo del robot Feature #3766: Prototipo del robot

Project: Grupo 1 B
Status: New
Start date: 08/13/2024
Due date: 08/15/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3804: Pruebas de códigos Feature #3804: Pruebas de códigos

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 09/03/2024
Assignee: yazuska castillo
Priority: Normal
Grupo 3 B - Feature #3805: Documentación Feature #3805: Documentación

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 09/10/2024
Assignee:
Priority: Urgent
Grupo 3 B - Feature #3806: Seguimiento de modelos Feature #3806: Seguimiento de modelos

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 09/03/2024
Assignee: kamila diaz
Priority: High
Grupo 3 B - Feature #3809: Instalación del sistema ope... Feature #3809: Instalación del sistema operativo

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3812: Codificación Feature #3812: Codificación

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 09/03/2024
Assignee: yazuska castillo
Priority: Normal
Grupo 3 B - Feature #3851: Asignación de cargos Feature #3851: Asignación de cargos

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 08/20/2024
Assignee:
Priority: Normal
Grupo 4 B - Feature #3936: Etapa 1 Feature #3936: Etapa 1

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 09/08/2024
Assignee: rafael nakata
Priority: Urgent
Grupo 4 B - Feature #3938: Documentación Feature #3938: Documentación

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 09/08/2024
Assignee: brandon jalanoca
Priority: Urgent
Grupo 4 B - Feature #3941: Bitácoras Feature #3941: Bitácoras

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 09/08/2024
Assignee: brandon jalanoca
Priority: Normal
Grupo 4 B - Feature #3943: Informe 1 Feature #3943: Informe 1

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 09/06/2024
Assignee: rafael nakata
Priority: Urgent
Grupo 4 B - Feature #3945: Codificación Feature #3945: Codificación

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/29/2024
Assignee: rafael nakata
Priority: Normal
Grupo 4 B - Feature #3946: Instalación ev3micropy al m... Feature #3946: Instalación ev3micropy al microSD

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/22/2024
Assignee: rafael nakata
Priority: Normal
Grupo 4 B - Feature #3961: Construcción del Robot Feature #3961: Construcción del Robot

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/27/2024
Assignee: joaquin jelves
Priority: Normal
Grupo 4 B - Feature #3963: Tipo de gancho Feature #3963: Tipo de gancho

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/19/2024
Assignee: rafael nakata
Priority: Normal
Grupo 5 B - Feature #3779: Fase 1 Feature #3779: Fase 1

Project: Grupo 5 B
Status: New
Start date: 08/13/2024
Due date: 09/13/2024
Assignee:
Priority: High
Grupo 5 B - Feature #3781: Documentación Feature #3781: Documentación

Project: Grupo 5 B
Status: New
Start date: 08/13/2024
Due date: 09/13/2024
Assignee: Guillermo Pino
Priority: High
Grupo 5 B - Feature #3831: Bitácoras Feature #3831: Bitácoras

Project: Grupo 5 B
Status: New
Start date: 08/13/2024
Due date: 09/13/2024
Assignee: Guillermo Pino
Priority: Normal

14

Grupo 3 A - Support #4014: Inventario y organización d... Support #4014: Inventario y organización del prototipo de robot EV3.

Project: Grupo 3 A
Status: New
Start date: 08/14/2024
Due date: 08/14/2024
Assignee: catalina ramirez
Priority: Urgent
Grupo 5 A - Feature #4060: Conteo de piezas Feature #4060: Conteo de piezas

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 08/14/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3917: Bitácoras Feature #3917: Bitácoras

Project: Grupo 2 A
Status: Resolved
Start date: 08/14/2024
Due date: 09/08/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3918: Bitácora 1 Feature #3918: Bitácora 1

Project: Grupo 2 A
Status: New
Start date: 08/14/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4050: Etapa 1 Feature #4050: Etapa 1

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 09/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4059: Tareas Feature #4059: Tareas

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 08/24/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4062: Codificación Feature #4062: Codificación

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 08/24/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4063: Estudio librería EV3 Feature #4063: Estudio librería EV3

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 08/16/2024
Assignee:
Priority: Normal

15

Grupo 1 B - Feature #3763: Tareas Feature #3763: Tareas

Project: Grupo 1 B
Status: New
Start date: 08/13/2024
Due date: 08/15/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #3766: Prototipo del robot Feature #3766: Prototipo del robot

Project: Grupo 1 B
Status: New
Start date: 08/13/2024
Due date: 08/15/2024
Assignee:
Priority: Normal

16

Grupo 1 A - Feature #3875: Conteo de Piezas Feature #3875: Conteo de Piezas

Project: Grupo 1 A
Status: New
Start date: 08/16/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3710: Asignación de roles Feature #3710: Asignación de roles

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3914: Entrega del Kit EV3 Feature #3914: Entrega del Kit EV3

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3915: Investigación sobre EV3 Feature #3915: Investigación sobre EV3

Project: Grupo 2 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3918: Bitácora 1 Feature #3918: Bitácora 1

Project: Grupo 2 A
Status: New
Start date: 08/14/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 3 A - Support #3690: Bitácora Semana 1 Support #3690: Bitácora Semana 1

Project: Grupo 3 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee: catalina ramirez
Priority: Normal
Grupo 3 A - Support #4010: Conexión SSH por medio de B... Support #4010: Conexión SSH por medio de Bluetooth a EV3

Project: Grupo 3 A
Status: New
Start date: 08/12/2024
Due date: 08/16/2024
Assignee: JEANY ARAVENA
Priority: Immediate
Grupo 3 A - Support #4015: Propuestas de diseño para l... Support #4015: Propuestas de diseño para la optimización del robot EV3.

Project: Grupo 3 A
Status: New
Start date: 08/16/2024
Due date: 08/16/2024
Assignee: brandon pizarro
Priority: Normal
Grupo 5 A - Feature #4063: Estudio librería EV3 Feature #4063: Estudio librería EV3

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3809: Instalación del sistema ope... Feature #3809: Instalación del sistema operativo

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 08/16/2024
Assignee:
Priority: Normal
Grupo 1 A - Feature #3874: Desarrollo del Robot EV3 Feature #3874: Desarrollo del Robot EV3

Project: Grupo 1 A
Status: New
Start date: 08/16/2024
Due date: 09/04/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4064: Instalación de EV3 Feature #4064: Instalación de EV3

Project: Grupo 5 A
Status: New
Start date: 08/16/2024
Due date: 08/19/2024
Assignee: ana gutierrez
Priority: Normal

17

34

18

Grupo 4 A - Support #3741: Bitacora1 Support #3741: Bitacora1

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 08/18/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #3768: Documentación Feature #3768: Documentación

Project: Grupo 1 B
Status: New
Start date: 08/18/2024
Due date: 09/15/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #3852: Bitácoras Feature #3852: Bitácoras

Project: Grupo 1 B
Status: New
Start date: 08/18/2024
Due date: 09/15/2024
Assignee:
Priority: Normal

19

Grupo 3 A - Support #4016: Boceto preliminar del diseñ... Support #4016: Boceto preliminar del diseño del robot para su construcción.

Project: Grupo 3 A
Status: New
Start date: 08/19/2024
Due date: 08/19/2024
Assignee: catalina ramirez
Priority: Normal
Grupo 5 A - Feature #4064: Instalación de EV3 Feature #4064: Instalación de EV3

Project: Grupo 5 A
Status: New
Start date: 08/16/2024
Due date: 08/19/2024
Assignee: ana gutierrez
Priority: Normal
Grupo 4 B - Feature #3963: Tipo de gancho Feature #3963: Tipo de gancho

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/19/2024
Assignee: rafael nakata
Priority: Normal
Grupo 2 A - Feature #3919: Bitácora 2 Feature #3919: Bitácora 2

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3922: Modificación del diseño del... Feature #3922: Modificación del diseño del robot

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3923: Se logra conectar el robot ... Feature #3923: Se logra conectar el robot a la red

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3924: Se vinculó el robot EV3 con... Feature #3924: Se vinculó el robot EV3 con python

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3925: Inicio del desarrollo de "L... Feature #3925: Inicio del desarrollo de "La Garra"

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3931: Informe 1 y presentación in... Feature #3931: Informe 1 y presentación inicial

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 09/06/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3932: Se inicia la elaboración de... Feature #3932: Se inicia la elaboración del informe 1 y la presentación

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 3 A - Support #3729: Bitácora Semana 2 Support #3729: Bitácora Semana 2

Project: Grupo 3 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: brandon pizarro
Priority: Normal
Grupo 3 A - Support #4011: Conexión SSH por medio de W... Support #4011: Conexión SSH por medio de WiFi y la programación de los archivos.

Project: Grupo 3 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: Tiara Canepa
Priority: Urgent
Grupo 3 A - Support #4018: Primera fase de construcció... Support #4018: Primera fase de construcción: Movilidad completa y ajustes necesarios del agarre.

Project: Grupo 3 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: catalina ramirez
Priority: High
Grupo 4 A - Support #3742: Bitacora 2 Support #3742: Bitacora 2

Project: Grupo 4 A
Status: Resolved
Start date: 08/19/2024
Due date: 08/25/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4055: Informe Feature #4055: Informe

Project: Grupo 5 A
Status: New
Start date: 08/19/2024
Due date: 09/09/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4057: Informe 1 Feature #4057: Informe 1

Project: Grupo 5 A
Status: New
Start date: 08/19/2024
Due date: 09/09/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4061: Confección del diseño provi... Feature #4061: Confección del diseño provisorio del robot EV3

Project: Grupo 5 A
Status: New
Start date: 08/19/2024
Due date: 08/24/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4075: Documentación Feature #4075: Documentación

Project: Grupo 5 A
Status: New
Start date: 08/19/2024
Due date: 09/13/2024
Assignee:
Priority: Normal
Grupo 5 B - Feature #3833: Formulación del proyecto Feature #3833: Formulación del proyecto

Project: Grupo 5 B
Status: New
Start date: 08/19/2024
Due date: 09/13/2024
Assignee: martin gonzalez
Priority: High
Grupo 5 B - Feature #3834: Tareas Feature #3834: Tareas

Project: Grupo 5 B
Status: New
Start date: 08/19/2024
Due date: 09/13/2024
Assignee: pedro archile
Priority: High
Grupo 5 B - Feature #4081: Conteo del kit e investigac... Feature #4081: Conteo del kit e investigacion del bloque EV3

Project: Grupo 5 B
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: pedro archile
Priority: Normal

20

Grupo 3 B - Feature #3851: Asignación de cargos Feature #3851: Asignación de cargos

Project: Grupo 3 B
Status: Resolved
Start date: 08/13/2024
Due date: 08/20/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4125: Presentación 1 Feature #4125: Presentación 1

Project: Grupo 1 B
Status: New
Start date: 08/20/2024
Due date: 09/10/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4126: Organización y diseño Feature #4126: Organización y diseño

Project: Grupo 1 B
Status: New
Start date: 08/20/2024
Due date: 09/10/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #3899: Etapa 1 Feature #3899: Etapa 1

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 09/13/2024
Assignee: diego pizarro
Priority: Urgent
Grupo 2 B - Feature #4128: Tareas Feature #4128: Tareas

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 09/05/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #4129: Conteo de piezas Feature #4129: Conteo de piezas

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/30/2024
Assignee: andre guerra
Priority: Normal
Grupo 2 B - Feature #4130: Diseño y Construcción del p... Feature #4130: Diseño y Construcción del prototipo final

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 09/05/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #4131: Diseño Wiki y Carta Gantt Feature #4131: Diseño Wiki y Carta Gantt

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 09/05/2024
Assignee:
Priority: High
Grupo 2 B - Feature #4132: Logo Feature #4132: Logo

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/23/2024
Assignee: christopher romo
Priority: Normal
Grupo 2 B - Feature #4133: Wiki Feature #4133: Wiki

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/30/2024
Assignee: diego pizarro
Priority: High
Grupo 2 B - Feature #4134: Carta Gantt Feature #4134: Carta Gantt

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 09/05/2024
Assignee: diego pizarro
Priority: High
Grupo 3 B - Feature #3811: Nombre del Proyecto Feature #3811: Nombre del Proyecto

Project: Grupo 3 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/22/2024
Assignee: kamila diaz
Priority: Normal
Grupo 3 B - Feature #3813: Prototipo de interfaz Feature #3813: Prototipo de interfaz

Project: Grupo 3 B
Status: Resolved
Start date: 08/20/2024
Due date: 09/03/2024
Assignee: yazuska castillo
Priority: Normal
Grupo 3 B - Feature #3827: Wiki Feature #3827: Wiki

Project: Grupo 3 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 4 B - Feature #3965: Tipo de estructura para sop... Feature #3965: Tipo de estructura para soportar el peso

Project: Grupo 4 B
Status: New
Start date: 08/20/2024
Due date: 08/27/2024
Assignee: joaquin jelves
Priority: Normal

21

Grupo 1 A - Feature #3876: Conexion Wifi con el Robot Feature #3876: Conexion Wifi con el Robot

Project: Grupo 1 A
Status: New
Start date: 08/21/2024
Due date: 08/21/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4065: Pruebas de funcionamiento d... Feature #4065: Pruebas de funcionamiento del robot EV3

Project: Grupo 5 A
Status: New
Start date: 08/21/2024
Due date: 08/24/2024
Assignee: Jhon Alarcón
Priority: Normal

22

Grupo 3 B - Feature #3811: Nombre del Proyecto Feature #3811: Nombre del Proyecto

Project: Grupo 3 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/22/2024
Assignee: kamila diaz
Priority: Normal
Grupo 4 B - Feature #3946: Instalación ev3micropy al m... Feature #3946: Instalación ev3micropy al microSD

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/22/2024
Assignee: rafael nakata
Priority: Normal
Grupo 1 B - Feature #4127: Creación del logo Feature #4127: Creación del logo

Project: Grupo 1 B
Status: New
Start date: 08/22/2024
Due date: 09/09/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3807: Bocetos del Logo Feature #3807: Bocetos del Logo

Project: Grupo 3 B
Status: Resolved
Start date: 08/22/2024
Due date: 08/30/2024
Assignee: mayling alvarez
Priority: Normal

23

Grupo 1 A - Feature #3879: Conexion via SSH Feature #3879: Conexion via SSH

Project: Grupo 1 A
Status: New
Start date: 08/23/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3919: Bitácora 2 Feature #3919: Bitácora 2

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3922: Modificación del diseño del... Feature #3922: Modificación del diseño del robot

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3923: Se logra conectar el robot ... Feature #3923: Se logra conectar el robot a la red

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3924: Se vinculó el robot EV3 con... Feature #3924: Se vinculó el robot EV3 con python

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3925: Inicio del desarrollo de "L... Feature #3925: Inicio del desarrollo de "La Garra"

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3932: Se inicia la elaboración de... Feature #3932: Se inicia la elaboración del informe 1 y la presentación

Project: Grupo 2 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee:
Priority: Normal
Grupo 3 A - Support #3729: Bitácora Semana 2 Support #3729: Bitácora Semana 2

Project: Grupo 3 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: brandon pizarro
Priority: Normal
Grupo 3 A - Support #4011: Conexión SSH por medio de W... Support #4011: Conexión SSH por medio de WiFi y la programación de los archivos.

Project: Grupo 3 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: Tiara Canepa
Priority: Urgent
Grupo 3 A - Support #4018: Primera fase de construcció... Support #4018: Primera fase de construcción: Movilidad completa y ajustes necesarios del agarre.

Project: Grupo 3 A
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: catalina ramirez
Priority: High
Grupo 2 B - Feature #4132: Logo Feature #4132: Logo

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/23/2024
Assignee: christopher romo
Priority: Normal
Grupo 5 B - Feature #4081: Conteo del kit e investigac... Feature #4081: Conteo del kit e investigacion del bloque EV3

Project: Grupo 5 B
Status: New
Start date: 08/19/2024
Due date: 08/23/2024
Assignee: pedro archile
Priority: Normal
Grupo 1 A - Feature #3877: Rediseño del Robot Feature #3877: Rediseño del Robot

Project: Grupo 1 A
Status: New
Start date: 08/23/2024
Due date: 09/04/2024
Assignee:
Priority: Normal
Grupo 1 A - Feature #3878: Codificacion del EV3 Feature #3878: Codificacion del EV3

Project: Grupo 1 A
Status: New
Start date: 08/23/2024
Due date: 09/02/2024
Assignee:
Priority: Immediate
Grupo 1 A - Feature #3880: Codificacion de Funciones g... Feature #3880: Codificacion de Funciones generales

Project: Grupo 1 A
Status: New
Start date: 08/23/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3802: Primer brazo del robot Feature #3802: Primer brazo del robot

Project: Grupo 3 B
Status: Resolved
Start date: 08/23/2024
Due date: 08/30/2024
Assignee: martin delsolar
Priority: Normal
Grupo 5 B - Feature #4082: Diseño y estructura del robot Feature #4082: Diseño y estructura del robot

Project: Grupo 5 B
Status: New
Start date: 08/23/2024
Due date: 09/13/2024
Assignee: hilda albarracin
Priority: High

24

Grupo 5 A - Feature #4059: Tareas Feature #4059: Tareas

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 08/24/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4061: Confección del diseño provi... Feature #4061: Confección del diseño provisorio del robot EV3

Project: Grupo 5 A
Status: New
Start date: 08/19/2024
Due date: 08/24/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4062: Codificación Feature #4062: Codificación

Project: Grupo 5 A
Status: New
Start date: 08/14/2024
Due date: 08/24/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4065: Pruebas de funcionamiento d... Feature #4065: Pruebas de funcionamiento del robot EV3

Project: Grupo 5 A
Status: New
Start date: 08/21/2024
Due date: 08/24/2024
Assignee: Jhon Alarcón
Priority: Normal
35

25

Grupo 4 A - Support #3742: Bitacora 2 Support #3742: Bitacora 2

Project: Grupo 4 A
Status: Resolved
Start date: 08/19/2024
Due date: 08/25/2024
Assignee:
Priority: Normal

26

Grupo 3 A - Support #4017: Diseño del logo del equipo ... Support #4017: Diseño del logo del equipo del robot.

Project: Grupo 3 A
Status: New
Start date: 08/26/2024
Due date: 08/26/2024
Assignee: brandon pizarro
Priority: Urgent
Grupo 4 A - Feature #3735: Diseño y armado de la 1era ... Feature #3735: Diseño y armado de la 1era version de GTP-1

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 08/26/2024
Assignee: alex munoz
Priority: Normal
Grupo 2 A - Feature #3920: Bitácora 3 Feature #3920: Bitácora 3

Project: Grupo 2 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3926: Se prosigue con la codifica... Feature #3926: Se prosigue con la codificación de la garra

Project: Grupo 2 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3927: Creación archivos librería.... Feature #3927: Creación archivos librería.py y server.py

Project: Grupo 2 A
Status: New
Start date: 08/26/2024
Due date: 09/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3933: Avance en el informe, Avanc... Feature #3933: Avance en el informe, Avance en la presentación

Project: Grupo 2 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 3 A - Support #3895: Bitácora Semana 3 Support #3895: Bitácora Semana 3

Project: Grupo 3 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee: catalina ramirez
Priority: Normal
Grupo 3 A - Support #4012: Integración completa y cone... Support #4012: Integración completa y conexión remota exitosa en EV3.

Project: Grupo 3 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee: JEANY ARAVENA
Priority: Urgent
Grupo 3 A - Support #4019: Avance en la construcción: ... Support #4019: Avance en la construcción: Movilidad completa y garra lista para ajustes finales.

Project: Grupo 3 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee: brandon pizarro
Priority: High
Grupo 4 A - Support #3743: Bitacora 3 Support #3743: Bitacora 3

Project: Grupo 4 A
Status: Resolved
Start date: 08/26/2024
Due date: 09/01/2024
Assignee:
Priority: Normal
Grupo 5 B - Feature #3832: Informe 1 Feature #3832: Informe 1

Project: Grupo 5 B
Status: New
Start date: 08/26/2024
Due date: 09/13/2024
Assignee: martin gonzalez
Priority: High
Grupo 5 B - Feature #4084: Plataforma web y distribuci... Feature #4084: Plataforma web y distribución del tiempo

Project: Grupo 5 B
Status: New
Start date: 08/26/2024
Due date: 09/13/2024
Assignee: Guillermo Pino
Priority: High
Grupo 5 B - Feature #4085: Carta Gantt Feature #4085: Carta Gantt

Project: Grupo 5 B
Status: New
Start date: 08/26/2024
Due date: 09/13/2024
Assignee: Guillermo Pino
Priority: High
Grupo 5 B - Feature #4089: Creación y avance Feature #4089: Creación y avance

Project: Grupo 5 B
Status: New
Start date: 08/26/2024
Due date: 09/10/2024
Assignee: martin gonzalez
Priority: High
Grupo 5 B - Feature #4091: Presentación 1 Feature #4091: Presentación 1

Project: Grupo 5 B
Status: New
Start date: 08/26/2024
Due date: 09/13/2024
Assignee: pedro archile
Priority: Normal

27

Grupo 4 B - Feature #3961: Construcción del Robot Feature #3961: Construcción del Robot

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/27/2024
Assignee: joaquin jelves
Priority: Normal
Grupo 4 B - Feature #3965: Tipo de estructura para sop... Feature #3965: Tipo de estructura para soportar el peso

Project: Grupo 4 B
Status: New
Start date: 08/20/2024
Due date: 08/27/2024
Assignee: joaquin jelves
Priority: Normal
Grupo 5 A - Feature #4066: Diseño WIKI Feature #4066: Diseño WIKI

Project: Grupo 5 A
Status: New
Start date: 08/27/2024
Due date: 09/08/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4071: Diseño Wiki Feature #4071: Diseño Wiki

Project: Grupo 5 A
Status: New
Start date: 08/27/2024
Due date: 09/08/2024
Assignee: ana gutierrez
Priority: Normal
Grupo 1 B - Feature #3898: Programación Feature #3898: Programación

Project: Grupo 1 B
Status: New
Start date: 08/27/2024
Due date: 09/13/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4122: Conectividad del robot Feature #4122: Conectividad del robot

Project: Grupo 1 B
Status: New
Start date: 08/27/2024
Due date: 09/06/2024
Assignee:
Priority: Normal
Grupo 4 B - Feature #3967: Probar librerías de EV3 y s... Feature #3967: Probar librerías de EV3 y sus funciones

Project: Grupo 4 B
Status: New
Start date: 08/27/2024
Due date: 08/29/2024
Assignee: joaquin jelves
Priority: Normal

28

Grupo 4 A - Feature #3738: Investigacion sobre la form... Feature #3738: Investigacion sobre la forma de programar el proyecto

Project: Grupo 4 A
Status: Resolved
Start date: 08/12/2024
Due date: 08/28/2024
Assignee: benjamin flores
Priority: High
Grupo 4 A - Feature #3739: Programacion v.1 del proyecto Feature #3739: Programacion v.1 del proyecto

Project: Grupo 4 A
Status: Resolved
Start date: 08/28/2024
Due date: 09/13/2024
Assignee: benjamin flores
Priority: High
Grupo 4 A - Feature #4780: Interfaz Grafica v.1 Feature #4780: Interfaz Grafica v.1

Project: Grupo 4 A
Status: Resolved
Start date: 08/28/2024
Due date: 09/13/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3800: Conteo de piezas Feature #3800: Conteo de piezas

Project: Grupo 3 B
Status: Resolved
Start date: 08/28/2024
Due date: 08/29/2024
Assignee: kamila diaz
Priority: High

29

Grupo 3 B - Feature #3800: Conteo de piezas Feature #3800: Conteo de piezas

Project: Grupo 3 B
Status: Resolved
Start date: 08/28/2024
Due date: 08/29/2024
Assignee: kamila diaz
Priority: High
Grupo 4 B - Feature #3945: Codificación Feature #3945: Codificación

Project: Grupo 4 B
Status: New
Start date: 08/13/2024
Due date: 08/29/2024
Assignee: rafael nakata
Priority: Normal
Grupo 4 B - Feature #3967: Probar librerías de EV3 y s... Feature #3967: Probar librerías de EV3 y sus funciones

Project: Grupo 4 B
Status: New
Start date: 08/27/2024
Due date: 08/29/2024
Assignee: joaquin jelves
Priority: Normal
Grupo 3 B - Feature #3830: Conexión desde la terminal Feature #3830: Conexión desde la terminal

Project: Grupo 3 B
Status: Resolved
Start date: 08/29/2024
Due date: 09/03/2024
Assignee: mayling alvarez
Priority: Normal
Grupo 4 B - Feature #3953: Wiki Feature #3953: Wiki

Project: Grupo 4 B
Status: New
Start date: 08/29/2024
Due date: 09/03/2024
Assignee: rafael nakata
Priority: Normal
Grupo 4 B - Feature #3966: Ideas para el diseño del lo... Feature #3966: Ideas para el diseño del logo para la wiki

Project: Grupo 4 B
Status: New
Start date: 08/29/2024
Due date: 09/03/2024
Assignee: rafael nakata
Priority: Normal

30

Grupo 1 A - Feature #3880: Codificacion de Funciones g... Feature #3880: Codificacion de Funciones generales

Project: Grupo 1 A
Status: New
Start date: 08/23/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3920: Bitácora 3 Feature #3920: Bitácora 3

Project: Grupo 2 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3926: Se prosigue con la codifica... Feature #3926: Se prosigue con la codificación de la garra

Project: Grupo 2 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #3933: Avance en el informe, Avanc... Feature #3933: Avance en el informe, Avance en la presentación

Project: Grupo 2 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 3 A - Support #3895: Bitácora Semana 3 Support #3895: Bitácora Semana 3

Project: Grupo 3 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee: catalina ramirez
Priority: Normal
Grupo 3 A - Support #4012: Integración completa y cone... Support #4012: Integración completa y conexión remota exitosa en EV3.

Project: Grupo 3 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee: JEANY ARAVENA
Priority: Urgent
Grupo 3 A - Support #4019: Avance en la construcción: ... Support #4019: Avance en la construcción: Movilidad completa y garra lista para ajustes finales.

Project: Grupo 3 A
Status: New
Start date: 08/26/2024
Due date: 08/30/2024
Assignee: brandon pizarro
Priority: High
Grupo 2 B - Feature #4129: Conteo de piezas Feature #4129: Conteo de piezas

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/30/2024
Assignee: andre guerra
Priority: Normal
Grupo 2 B - Feature #4133: Wiki Feature #4133: Wiki

Project: Grupo 2 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/30/2024
Assignee: diego pizarro
Priority: High
Grupo 3 B - Feature #3799: Prototipo del Robot Feature #3799: Prototipo del Robot

Project: Grupo 3 B
Status: Resolved
Start date: 08/08/2024
Due date: 08/30/2024
Assignee:
Priority: High
Grupo 3 B - Feature #3802: Primer brazo del robot Feature #3802: Primer brazo del robot

Project: Grupo 3 B
Status: Resolved
Start date: 08/23/2024
Due date: 08/30/2024
Assignee: martin delsolar
Priority: Normal
Grupo 3 B - Feature #3807: Bocetos del Logo Feature #3807: Bocetos del Logo

Project: Grupo 3 B
Status: Resolved
Start date: 08/22/2024
Due date: 08/30/2024
Assignee: mayling alvarez
Priority: Normal
Grupo 3 B - Feature #3827: Wiki Feature #3827: Wiki

Project: Grupo 3 B
Status: Resolved
Start date: 08/20/2024
Due date: 08/30/2024
Assignee:
Priority: Normal
Grupo 1 A - Feature #3873: Informe de la etapa 1 Feature #3873: Informe de la etapa 1

Project: Grupo 1 A
Status: New
Start date: 08/30/2024
Due date: 09/05/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4124: Librerías Feature #4124: Librerías

Project: Grupo 1 B
Status: New
Start date: 08/30/2024
Due date: 09/13/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #4135: Codificación Feature #4135: Codificación

Project: Grupo 2 B
Status: Resolved
Start date: 08/30/2024
Due date: 09/13/2024
Assignee: fernando diaz
Priority: Normal
Grupo 2 B - Feature #4136: Ingreso al servidor SS.HH Feature #4136: Ingreso al servidor SS.HH

Project: Grupo 2 B
Status: Resolved
Start date: 08/30/2024
Due date: 09/06/2024
Assignee: andre guerra
Priority: Normal
Grupo 2 B - Feature #4137: Estudio de librerías EV3 Mi... Feature #4137: Estudio de librerías EV3 MicroPython

Project: Grupo 2 B
Status: Resolved
Start date: 08/30/2024
Due date: 09/13/2024
Assignee: fernando diaz
Priority: Normal
Grupo 2 B - Feature #4138: Informe 1 Feature #4138: Informe 1

Project: Grupo 2 B
Status: Resolved
Start date: 08/30/2024
Due date: 09/09/2024
Assignee: andre guerra
Priority: Urgent

31

issue beginning this day issue ending this day issue beginning and ending this day