Calendar
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | |
---|---|---|---|---|---|---|---|
31 |
28 |
29 |
30 |
31 |
1 |
2 |
3 |
32 |
4 |
5 |
6 |
7 |
8
Grupo 3 B -
Feature #3789: Fase 1 - Familiarización co...
Feature #3789: Fase 1 - Familiarización con el robot
Project: Grupo 3 B Status: Resolved Start date: 08/08/2024 Due date: 09/10/2024 Assignee: Priority: Urgent
Grupo 3 B -
Feature #3799: Prototipo del Robot
Feature #3799: Prototipo del Robot
Project: Grupo 3 B Status: Resolved Start date: 08/08/2024 Due date: 08/30/2024 Assignee: Priority: High
Grupo 3 B -
Feature #3810: Primera base del robot
Feature #3810: Primera base del robot
Project: Grupo 3 B Status: Resolved Start date: 08/08/2024 Due date: 08/09/2024 Assignee: ivan collao Priority: Normal |
9
Grupo 3 B -
Feature #3810: Primera base del robot
Feature #3810: Primera base del robot
Project: Grupo 3 B Status: Resolved Start date: 08/08/2024 Due date: 08/09/2024 Assignee: ivan collao Priority: Normal
Grupo 3 B -
Feature #3940: Bitácoras
Feature #3940: Bitácoras
Project: Grupo 3 B Status: Resolved Start date: 08/09/2024 Due date: 11/12/2024 Assignee: martin delsolar Priority: Normal |
10 |
33 |
11 |
12
Grupo 1 A -
Feature #3859: Etapa N°1
Feature #3859: Etapa N°1
Project: Grupo 1 A Status: New Start date: 08/12/2024 Due date: 09/05/2024 Assignee: Priority: Immediate
Grupo 1 A -
Feature #3871: Documentacion Etapa N°1
Feature #3871: Documentacion Etapa N°1
Project: Grupo 1 A Status: New Start date: 08/12/2024 Due date: 09/05/2024 Assignee: Priority: Normal
Grupo 1 A -
Feature #3872: Bitácoras Semanales
Feature #3872: Bitácoras Semanales
Project: Grupo 1 A Status: New Start date: 08/12/2024 Due date: 09/05/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3707: Fase 1
Feature #3707: Fase 1
Project: Grupo 2 A Status: Resolved Start date: 08/12/2024 Due date: 09/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3710: Asignación de roles
Feature #3710: Asignación de roles
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3913: Avance del EV3-F1
Feature #3913: Avance del EV3-F1
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 09/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3914: Entrega del Kit EV3
Feature #3914: Entrega del Kit EV3
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3915: Investigación sobre EV3
Feature #3915: Investigación sobre EV3
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3916: Busqueda de diseño para rob...
Feature #3916: Busqueda de diseño para robot EV3
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 09/16/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #3690: Bitácora Semana 1
Support #3690: Bitácora Semana 1
Project: Grupo 3 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4010: Conexión SSH por medio de B...
Support #4010: Conexión SSH por medio de Bluetooth a EV3
Project: Grupo 3 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: JEANY ARAVENA Priority: Immediate
Grupo 4 A -
Feature #3733: Proyecto v.1
Feature #3733: Proyecto v.1
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 09/13/2024 Assignee: Priority: High
Grupo 4 A -
Feature #3735: Diseño y armado de la 1era ...
Feature #3735: Diseño y armado de la 1era version de GTP-1
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 08/26/2024 Assignee: alex munoz Priority: Normal
Grupo 4 A -
Feature #3738: Investigacion sobre la form...
Feature #3738: Investigacion sobre la forma de programar el proyecto
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 08/28/2024 Assignee: benjamin flores Priority: High
Grupo 4 A -
Support #3740: Bitacoras
Support #3740: Bitacoras
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 11/17/2024 Assignee: benjamin flores Priority: Normal
Grupo 4 A -
Support #3741: Bitacora1
Support #3741: Bitacora1
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 08/18/2024 Assignee: Priority: Normal |
13
Grupo 1 B -
Feature #3764: Conteo de piezas
Feature #3764: Conteo de piezas
Project: Grupo 1 B Status: New Start date: 08/13/2024 Due date: 08/13/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #3754: Etapa 1 (Diseño)
Feature #3754: Etapa 1 (Diseño)
Project: Grupo 1 B Status: New Start date: 08/13/2024 Due date: 09/15/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #3763: Tareas
Feature #3763: Tareas
Project: Grupo 1 B Status: New Start date: 08/13/2024 Due date: 08/15/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #3766: Prototipo del robot
Feature #3766: Prototipo del robot
Project: Grupo 1 B Status: New Start date: 08/13/2024 Due date: 08/15/2024 Assignee: Priority: Normal
Grupo 3 B -
Feature #3804: Pruebas de códigos
Feature #3804: Pruebas de códigos
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 09/03/2024 Assignee: yazuska castillo Priority: Normal
Grupo 3 B -
Feature #3805: Documentación
Feature #3805: Documentación
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 09/10/2024 Assignee: Priority: Urgent
Grupo 3 B -
Feature #3806: Seguimiento de modelos
Feature #3806: Seguimiento de modelos
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 09/03/2024 Assignee: kamila diaz Priority: High
Grupo 3 B -
Feature #3809: Instalación del sistema ope...
Feature #3809: Instalación del sistema operativo
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 3 B -
Feature #3812: Codificación
Feature #3812: Codificación
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 09/03/2024 Assignee: yazuska castillo Priority: Normal
Grupo 3 B -
Feature #3851: Asignación de cargos
Feature #3851: Asignación de cargos
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 08/20/2024 Assignee: Priority: Normal
Grupo 4 B -
Feature #3936: Etapa 1
Feature #3936: Etapa 1
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 09/08/2024 Assignee: rafael nakata Priority: Urgent
Grupo 4 B -
Feature #3938: Documentación
Feature #3938: Documentación
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 09/08/2024 Assignee: brandon jalanoca Priority: Urgent
Grupo 4 B -
Feature #3941: Bitácoras
Feature #3941: Bitácoras
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 09/08/2024 Assignee: brandon jalanoca Priority: Normal
Grupo 4 B -
Feature #3943: Informe 1
Feature #3943: Informe 1
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 09/06/2024 Assignee: rafael nakata Priority: Urgent
Grupo 4 B -
Feature #3945: Codificación
Feature #3945: Codificación
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/29/2024 Assignee: rafael nakata Priority: Normal
Grupo 4 B -
Feature #3946: Instalación ev3micropy al m...
Feature #3946: Instalación ev3micropy al microSD
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/22/2024 Assignee: rafael nakata Priority: Normal
Grupo 4 B -
Feature #3961: Construcción del Robot
Feature #3961: Construcción del Robot
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/27/2024 Assignee: joaquin jelves Priority: Normal
Grupo 4 B -
Feature #3963: Tipo de gancho
Feature #3963: Tipo de gancho
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/19/2024 Assignee: rafael nakata Priority: Normal
Grupo 5 B -
Feature #3779: Fase 1
Feature #3779: Fase 1
Project: Grupo 5 B Status: New Start date: 08/13/2024 Due date: 09/13/2024 Assignee: Priority: High
Grupo 5 B -
Feature #3781: Documentación
Feature #3781: Documentación
Project: Grupo 5 B Status: New Start date: 08/13/2024 Due date: 09/13/2024 Assignee: Guillermo Pino Priority: High
Grupo 5 B -
Feature #3831: Bitácoras
Feature #3831: Bitácoras
Project: Grupo 5 B Status: New Start date: 08/13/2024 Due date: 09/13/2024 Assignee: Guillermo Pino Priority: Normal |
14
Grupo 3 A -
Support #4014: Inventario y organización d...
Support #4014: Inventario y organización del prototipo de robot EV3.
Project: Grupo 3 A Status: New Start date: 08/14/2024 Due date: 08/14/2024 Assignee: catalina ramirez Priority: Urgent
Grupo 5 A -
Feature #4060: Conteo de piezas
Feature #4060: Conteo de piezas
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 08/14/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3917: Bitácoras
Feature #3917: Bitácoras
Project: Grupo 2 A Status: Resolved Start date: 08/14/2024 Due date: 09/08/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3918: Bitácora 1
Feature #3918: Bitácora 1
Project: Grupo 2 A Status: New Start date: 08/14/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4050: Etapa 1
Feature #4050: Etapa 1
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 09/13/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4059: Tareas
Feature #4059: Tareas
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 08/24/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4062: Codificación
Feature #4062: Codificación
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 08/24/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4063: Estudio librería EV3
Feature #4063: Estudio librería EV3
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 08/16/2024 Assignee: Priority: Normal |
15
Grupo 1 B -
Feature #3763: Tareas
Feature #3763: Tareas
Project: Grupo 1 B Status: New Start date: 08/13/2024 Due date: 08/15/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #3766: Prototipo del robot
Feature #3766: Prototipo del robot
Project: Grupo 1 B Status: New Start date: 08/13/2024 Due date: 08/15/2024 Assignee: Priority: Normal |
16
Grupo 1 A -
Feature #3875: Conteo de Piezas
Feature #3875: Conteo de Piezas
Project: Grupo 1 A Status: New Start date: 08/16/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3710: Asignación de roles
Feature #3710: Asignación de roles
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3914: Entrega del Kit EV3
Feature #3914: Entrega del Kit EV3
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3915: Investigación sobre EV3
Feature #3915: Investigación sobre EV3
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3918: Bitácora 1
Feature #3918: Bitácora 1
Project: Grupo 2 A Status: New Start date: 08/14/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #3690: Bitácora Semana 1
Support #3690: Bitácora Semana 1
Project: Grupo 3 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4010: Conexión SSH por medio de B...
Support #4010: Conexión SSH por medio de Bluetooth a EV3
Project: Grupo 3 A Status: New Start date: 08/12/2024 Due date: 08/16/2024 Assignee: JEANY ARAVENA Priority: Immediate
Grupo 3 A -
Support #4015: Propuestas de diseño para l...
Support #4015: Propuestas de diseño para la optimización del robot EV3.
Project: Grupo 3 A Status: New Start date: 08/16/2024 Due date: 08/16/2024 Assignee: brandon pizarro Priority: Normal
Grupo 5 A -
Feature #4063: Estudio librería EV3
Feature #4063: Estudio librería EV3
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 3 B -
Feature #3809: Instalación del sistema ope...
Feature #3809: Instalación del sistema operativo
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 08/16/2024 Assignee: Priority: Normal
Grupo 1 A -
Feature #3874: Desarrollo del Robot EV3
Feature #3874: Desarrollo del Robot EV3
Project: Grupo 1 A Status: New Start date: 08/16/2024 Due date: 09/04/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4064: Instalación de EV3
Feature #4064: Instalación de EV3
Project: Grupo 5 A Status: New Start date: 08/16/2024 Due date: 08/19/2024 Assignee: ana gutierrez Priority: Normal |
17 |
34 |
18
Grupo 4 A -
Support #3741: Bitacora1
Support #3741: Bitacora1
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 08/18/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #3768: Documentación
Feature #3768: Documentación
Project: Grupo 1 B Status: New Start date: 08/18/2024 Due date: 09/15/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #3852: Bitácoras
Feature #3852: Bitácoras
Project: Grupo 1 B Status: New Start date: 08/18/2024 Due date: 09/15/2024 Assignee: Priority: Normal |
19
Grupo 3 A -
Support #4016: Boceto preliminar del diseñ...
Support #4016: Boceto preliminar del diseño del robot para su construcción.
Project: Grupo 3 A Status: New Start date: 08/19/2024 Due date: 08/19/2024 Assignee: catalina ramirez Priority: Normal
Grupo 5 A -
Feature #4064: Instalación de EV3
Feature #4064: Instalación de EV3
Project: Grupo 5 A Status: New Start date: 08/16/2024 Due date: 08/19/2024 Assignee: ana gutierrez Priority: Normal
Grupo 4 B -
Feature #3963: Tipo de gancho
Feature #3963: Tipo de gancho
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/19/2024 Assignee: rafael nakata Priority: Normal
Grupo 2 A -
Feature #3919: Bitácora 2
Feature #3919: Bitácora 2
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3922: Modificación del diseño del...
Feature #3922: Modificación del diseño del robot
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3923: Se logra conectar el robot ...
Feature #3923: Se logra conectar el robot a la red
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3924: Se vinculó el robot EV3 con...
Feature #3924: Se vinculó el robot EV3 con python
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3925: Inicio del desarrollo de "L...
Feature #3925: Inicio del desarrollo de "La Garra"
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3931: Informe 1 y presentación in...
Feature #3931: Informe 1 y presentación inicial
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 09/06/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3932: Se inicia la elaboración de...
Feature #3932: Se inicia la elaboración del informe 1 y la presentación
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #3729: Bitácora Semana 2
Support #3729: Bitácora Semana 2
Project: Grupo 3 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4011: Conexión SSH por medio de W...
Support #4011: Conexión SSH por medio de WiFi y la programación de los archivos.
Project: Grupo 3 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Tiara Canepa Priority: Urgent
Grupo 3 A -
Support #4018: Primera fase de construcció...
Support #4018: Primera fase de construcción: Movilidad completa y ajustes necesarios del agarre.
Project: Grupo 3 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: catalina ramirez Priority: High
Grupo 4 A -
Support #3742: Bitacora 2
Support #3742: Bitacora 2
Project: Grupo 4 A Status: Resolved Start date: 08/19/2024 Due date: 08/25/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4055: Informe
Feature #4055: Informe
Project: Grupo 5 A Status: New Start date: 08/19/2024 Due date: 09/09/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4057: Informe 1
Feature #4057: Informe 1
Project: Grupo 5 A Status: New Start date: 08/19/2024 Due date: 09/09/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4061: Confección del diseño provi...
Feature #4061: Confección del diseño provisorio del robot EV3
Project: Grupo 5 A Status: New Start date: 08/19/2024 Due date: 08/24/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4075: Documentación
Feature #4075: Documentación
Project: Grupo 5 A Status: New Start date: 08/19/2024 Due date: 09/13/2024 Assignee: Priority: Normal
Grupo 5 B -
Feature #3833: Formulación del proyecto
Feature #3833: Formulación del proyecto
Project: Grupo 5 B Status: New Start date: 08/19/2024 Due date: 09/13/2024 Assignee: martin gonzalez Priority: High
Grupo 5 B -
Feature #3834: Tareas
Feature #3834: Tareas
Project: Grupo 5 B Status: New Start date: 08/19/2024 Due date: 09/13/2024 Assignee: pedro archile Priority: High
Grupo 5 B -
Feature #4081: Conteo del kit e investigac...
Feature #4081: Conteo del kit e investigacion del bloque EV3
Project: Grupo 5 B Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: pedro archile Priority: Normal |
20
Grupo 3 B -
Feature #3851: Asignación de cargos
Feature #3851: Asignación de cargos
Project: Grupo 3 B Status: Resolved Start date: 08/13/2024 Due date: 08/20/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #4125: Presentación 1
Feature #4125: Presentación 1
Project: Grupo 1 B Status: New Start date: 08/20/2024 Due date: 09/10/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #4126: Organización y diseño
Feature #4126: Organización y diseño
Project: Grupo 1 B Status: New Start date: 08/20/2024 Due date: 09/10/2024 Assignee: Priority: Normal
Grupo 2 B -
Feature #3899: Etapa 1
Feature #3899: Etapa 1
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 09/13/2024 Assignee: diego pizarro Priority: Urgent
Grupo 2 B -
Feature #4128: Tareas
Feature #4128: Tareas
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 09/05/2024 Assignee: Priority: Normal
Grupo 2 B -
Feature #4129: Conteo de piezas
Feature #4129: Conteo de piezas
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 08/30/2024 Assignee: andre guerra Priority: Normal
Grupo 2 B -
Feature #4130: Diseño y Construcción del p...
Feature #4130: Diseño y Construcción del prototipo final
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 09/05/2024 Assignee: Priority: Normal
Grupo 2 B -
Feature #4131: Diseño Wiki y Carta Gantt
Feature #4131: Diseño Wiki y Carta Gantt
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 09/05/2024 Assignee: Priority: High
Grupo 2 B -
Feature #4132: Logo
Feature #4132: Logo
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 08/23/2024 Assignee: christopher romo Priority: Normal
Grupo 2 B -
Feature #4133: Wiki
Feature #4133: Wiki
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 08/30/2024 Assignee: diego pizarro Priority: High
Grupo 2 B -
Feature #4134: Carta Gantt
Feature #4134: Carta Gantt
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 09/05/2024 Assignee: diego pizarro Priority: High
Grupo 3 B -
Feature #3811: Nombre del Proyecto
Feature #3811: Nombre del Proyecto
Project: Grupo 3 B Status: Resolved Start date: 08/20/2024 Due date: 08/22/2024 Assignee: kamila diaz Priority: Normal
Grupo 3 B -
Feature #3813: Prototipo de interfaz
Feature #3813: Prototipo de interfaz
Project: Grupo 3 B Status: Resolved Start date: 08/20/2024 Due date: 09/03/2024 Assignee: yazuska castillo Priority: Normal
Grupo 3 B -
Feature #3827: Wiki
Feature #3827: Wiki
Project: Grupo 3 B Status: Resolved Start date: 08/20/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 4 B -
Feature #3965: Tipo de estructura para sop...
Feature #3965: Tipo de estructura para soportar el peso
Project: Grupo 4 B Status: New Start date: 08/20/2024 Due date: 08/27/2024 Assignee: joaquin jelves Priority: Normal |
21
Grupo 1 A -
Feature #3876: Conexion Wifi con el Robot
Feature #3876: Conexion Wifi con el Robot
Project: Grupo 1 A Status: New Start date: 08/21/2024 Due date: 08/21/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4065: Pruebas de funcionamiento d...
Feature #4065: Pruebas de funcionamiento del robot EV3
Project: Grupo 5 A Status: New Start date: 08/21/2024 Due date: 08/24/2024 Assignee: Jhon Alarcón Priority: Normal |
22
Grupo 3 B -
Feature #3811: Nombre del Proyecto
Feature #3811: Nombre del Proyecto
Project: Grupo 3 B Status: Resolved Start date: 08/20/2024 Due date: 08/22/2024 Assignee: kamila diaz Priority: Normal
Grupo 4 B -
Feature #3946: Instalación ev3micropy al m...
Feature #3946: Instalación ev3micropy al microSD
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/22/2024 Assignee: rafael nakata Priority: Normal
Grupo 1 B -
Feature #4127: Creación del logo
Feature #4127: Creación del logo
Project: Grupo 1 B Status: New Start date: 08/22/2024 Due date: 09/09/2024 Assignee: Priority: Normal
Grupo 3 B -
Feature #3807: Bocetos del Logo
Feature #3807: Bocetos del Logo
Project: Grupo 3 B Status: Resolved Start date: 08/22/2024 Due date: 08/30/2024 Assignee: mayling alvarez Priority: Normal |
23
Grupo 1 A -
Feature #3879: Conexion via SSH
Feature #3879: Conexion via SSH
Project: Grupo 1 A Status: New Start date: 08/23/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3919: Bitácora 2
Feature #3919: Bitácora 2
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3922: Modificación del diseño del...
Feature #3922: Modificación del diseño del robot
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3923: Se logra conectar el robot ...
Feature #3923: Se logra conectar el robot a la red
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3924: Se vinculó el robot EV3 con...
Feature #3924: Se vinculó el robot EV3 con python
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3925: Inicio del desarrollo de "L...
Feature #3925: Inicio del desarrollo de "La Garra"
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3932: Se inicia la elaboración de...
Feature #3932: Se inicia la elaboración del informe 1 y la presentación
Project: Grupo 2 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #3729: Bitácora Semana 2
Support #3729: Bitácora Semana 2
Project: Grupo 3 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4011: Conexión SSH por medio de W...
Support #4011: Conexión SSH por medio de WiFi y la programación de los archivos.
Project: Grupo 3 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: Tiara Canepa Priority: Urgent
Grupo 3 A -
Support #4018: Primera fase de construcció...
Support #4018: Primera fase de construcción: Movilidad completa y ajustes necesarios del agarre.
Project: Grupo 3 A Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: catalina ramirez Priority: High
Grupo 2 B -
Feature #4132: Logo
Feature #4132: Logo
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 08/23/2024 Assignee: christopher romo Priority: Normal
Grupo 5 B -
Feature #4081: Conteo del kit e investigac...
Feature #4081: Conteo del kit e investigacion del bloque EV3
Project: Grupo 5 B Status: New Start date: 08/19/2024 Due date: 08/23/2024 Assignee: pedro archile Priority: Normal
Grupo 1 A -
Feature #3877: Rediseño del Robot
Feature #3877: Rediseño del Robot
Project: Grupo 1 A Status: New Start date: 08/23/2024 Due date: 09/04/2024 Assignee: Priority: Normal
Grupo 1 A -
Feature #3878: Codificacion del EV3
Feature #3878: Codificacion del EV3
Project: Grupo 1 A Status: New Start date: 08/23/2024 Due date: 09/02/2024 Assignee: Priority: Immediate
Grupo 1 A -
Feature #3880: Codificacion de Funciones g...
Feature #3880: Codificacion de Funciones generales
Project: Grupo 1 A Status: New Start date: 08/23/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 3 B -
Feature #3802: Primer brazo del robot
Feature #3802: Primer brazo del robot
Project: Grupo 3 B Status: Resolved Start date: 08/23/2024 Due date: 08/30/2024 Assignee: martin delsolar Priority: Normal
Grupo 5 B -
Feature #4082: Diseño y estructura del robot
Feature #4082: Diseño y estructura del robot
Project: Grupo 5 B Status: New Start date: 08/23/2024 Due date: 09/13/2024 Assignee: hilda albarracin Priority: High |
24
Grupo 5 A -
Feature #4059: Tareas
Feature #4059: Tareas
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 08/24/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4061: Confección del diseño provi...
Feature #4061: Confección del diseño provisorio del robot EV3
Project: Grupo 5 A Status: New Start date: 08/19/2024 Due date: 08/24/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4062: Codificación
Feature #4062: Codificación
Project: Grupo 5 A Status: New Start date: 08/14/2024 Due date: 08/24/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4065: Pruebas de funcionamiento d...
Feature #4065: Pruebas de funcionamiento del robot EV3
Project: Grupo 5 A Status: New Start date: 08/21/2024 Due date: 08/24/2024 Assignee: Jhon Alarcón Priority: Normal |
35 |
25
Grupo 4 A -
Support #3742: Bitacora 2
Support #3742: Bitacora 2
Project: Grupo 4 A Status: Resolved Start date: 08/19/2024 Due date: 08/25/2024 Assignee: Priority: Normal |
26
Grupo 3 A -
Support #4017: Diseño del logo del equipo ...
Support #4017: Diseño del logo del equipo del robot.
Project: Grupo 3 A Status: New Start date: 08/26/2024 Due date: 08/26/2024 Assignee: brandon pizarro Priority: Urgent
Grupo 4 A -
Feature #3735: Diseño y armado de la 1era ...
Feature #3735: Diseño y armado de la 1era version de GTP-1
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 08/26/2024 Assignee: alex munoz Priority: Normal
Grupo 2 A -
Feature #3920: Bitácora 3
Feature #3920: Bitácora 3
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3926: Se prosigue con la codifica...
Feature #3926: Se prosigue con la codificación de la garra
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3927: Creación archivos librería....
Feature #3927: Creación archivos librería.py y server.py
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 09/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3933: Avance en el informe, Avanc...
Feature #3933: Avance en el informe, Avance en la presentación
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #3895: Bitácora Semana 3
Support #3895: Bitácora Semana 3
Project: Grupo 3 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4012: Integración completa y cone...
Support #4012: Integración completa y conexión remota exitosa en EV3.
Project: Grupo 3 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: JEANY ARAVENA Priority: Urgent
Grupo 3 A -
Support #4019: Avance en la construcción: ...
Support #4019: Avance en la construcción: Movilidad completa y garra lista para ajustes finales.
Project: Grupo 3 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: brandon pizarro Priority: High
Grupo 4 A -
Support #3743: Bitacora 3
Support #3743: Bitacora 3
Project: Grupo 4 A Status: Resolved Start date: 08/26/2024 Due date: 09/01/2024 Assignee: Priority: Normal
Grupo 5 B -
Feature #3832: Informe 1
Feature #3832: Informe 1
Project: Grupo 5 B Status: New Start date: 08/26/2024 Due date: 09/13/2024 Assignee: martin gonzalez Priority: High
Grupo 5 B -
Feature #4084: Plataforma web y distribuci...
Feature #4084: Plataforma web y distribución del tiempo
Project: Grupo 5 B Status: New Start date: 08/26/2024 Due date: 09/13/2024 Assignee: Guillermo Pino Priority: High
Grupo 5 B -
Feature #4085: Carta Gantt
Feature #4085: Carta Gantt
Project: Grupo 5 B Status: New Start date: 08/26/2024 Due date: 09/13/2024 Assignee: Guillermo Pino Priority: High
Grupo 5 B -
Feature #4089: Creación y avance
Feature #4089: Creación y avance
Project: Grupo 5 B Status: New Start date: 08/26/2024 Due date: 09/10/2024 Assignee: martin gonzalez Priority: High
Grupo 5 B -
Feature #4091: Presentación 1
Feature #4091: Presentación 1
Project: Grupo 5 B Status: New Start date: 08/26/2024 Due date: 09/13/2024 Assignee: pedro archile Priority: Normal |
27
Grupo 4 B -
Feature #3961: Construcción del Robot
Feature #3961: Construcción del Robot
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/27/2024 Assignee: joaquin jelves Priority: Normal
Grupo 4 B -
Feature #3965: Tipo de estructura para sop...
Feature #3965: Tipo de estructura para soportar el peso
Project: Grupo 4 B Status: New Start date: 08/20/2024 Due date: 08/27/2024 Assignee: joaquin jelves Priority: Normal
Grupo 5 A -
Feature #4066: Diseño WIKI
Feature #4066: Diseño WIKI
Project: Grupo 5 A Status: New Start date: 08/27/2024 Due date: 09/08/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4071: Diseño Wiki
Feature #4071: Diseño Wiki
Project: Grupo 5 A Status: New Start date: 08/27/2024 Due date: 09/08/2024 Assignee: ana gutierrez Priority: Normal
Grupo 1 B -
Feature #3898: Programación
Feature #3898: Programación
Project: Grupo 1 B Status: New Start date: 08/27/2024 Due date: 09/13/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #4122: Conectividad del robot
Feature #4122: Conectividad del robot
Project: Grupo 1 B Status: New Start date: 08/27/2024 Due date: 09/06/2024 Assignee: Priority: Normal
Grupo 4 B -
Feature #3967: Probar librerías de EV3 y s...
Feature #3967: Probar librerías de EV3 y sus funciones
Project: Grupo 4 B Status: New Start date: 08/27/2024 Due date: 08/29/2024 Assignee: joaquin jelves Priority: Normal |
28
Grupo 4 A -
Feature #3738: Investigacion sobre la form...
Feature #3738: Investigacion sobre la forma de programar el proyecto
Project: Grupo 4 A Status: Resolved Start date: 08/12/2024 Due date: 08/28/2024 Assignee: benjamin flores Priority: High
Grupo 4 A -
Feature #3739: Programacion v.1 del proyecto
Feature #3739: Programacion v.1 del proyecto
Project: Grupo 4 A Status: Resolved Start date: 08/28/2024 Due date: 09/13/2024 Assignee: benjamin flores Priority: High
Grupo 4 A -
Feature #4780: Interfaz Grafica v.1
Feature #4780: Interfaz Grafica v.1
Project: Grupo 4 A Status: Resolved Start date: 08/28/2024 Due date: 09/13/2024 Assignee: Priority: Normal
Grupo 3 B -
Feature #3800: Conteo de piezas
Feature #3800: Conteo de piezas
Project: Grupo 3 B Status: Resolved Start date: 08/28/2024 Due date: 08/29/2024 Assignee: kamila diaz Priority: High |
29
Grupo 3 B -
Feature #3800: Conteo de piezas
Feature #3800: Conteo de piezas
Project: Grupo 3 B Status: Resolved Start date: 08/28/2024 Due date: 08/29/2024 Assignee: kamila diaz Priority: High
Grupo 4 B -
Feature #3945: Codificación
Feature #3945: Codificación
Project: Grupo 4 B Status: New Start date: 08/13/2024 Due date: 08/29/2024 Assignee: rafael nakata Priority: Normal
Grupo 4 B -
Feature #3967: Probar librerías de EV3 y s...
Feature #3967: Probar librerías de EV3 y sus funciones
Project: Grupo 4 B Status: New Start date: 08/27/2024 Due date: 08/29/2024 Assignee: joaquin jelves Priority: Normal
Grupo 3 B -
Feature #3830: Conexión desde la terminal
Feature #3830: Conexión desde la terminal
Project: Grupo 3 B Status: Resolved Start date: 08/29/2024 Due date: 09/03/2024 Assignee: mayling alvarez Priority: Normal
Grupo 4 B -
Feature #3953: Wiki
Feature #3953: Wiki
Project: Grupo 4 B Status: New Start date: 08/29/2024 Due date: 09/03/2024 Assignee: rafael nakata Priority: Normal
Grupo 4 B -
Feature #3966: Ideas para el diseño del lo...
Feature #3966: Ideas para el diseño del logo para la wiki
Project: Grupo 4 B Status: New Start date: 08/29/2024 Due date: 09/03/2024 Assignee: rafael nakata Priority: Normal |
30
Grupo 1 A -
Feature #3880: Codificacion de Funciones g...
Feature #3880: Codificacion de Funciones generales
Project: Grupo 1 A Status: New Start date: 08/23/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3920: Bitácora 3
Feature #3920: Bitácora 3
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3926: Se prosigue con la codifica...
Feature #3926: Se prosigue con la codificación de la garra
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3933: Avance en el informe, Avanc...
Feature #3933: Avance en el informe, Avance en la presentación
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #3895: Bitácora Semana 3
Support #3895: Bitácora Semana 3
Project: Grupo 3 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4012: Integración completa y cone...
Support #4012: Integración completa y conexión remota exitosa en EV3.
Project: Grupo 3 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: JEANY ARAVENA Priority: Urgent
Grupo 3 A -
Support #4019: Avance en la construcción: ...
Support #4019: Avance en la construcción: Movilidad completa y garra lista para ajustes finales.
Project: Grupo 3 A Status: New Start date: 08/26/2024 Due date: 08/30/2024 Assignee: brandon pizarro Priority: High
Grupo 2 B -
Feature #4129: Conteo de piezas
Feature #4129: Conteo de piezas
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 08/30/2024 Assignee: andre guerra Priority: Normal
Grupo 2 B -
Feature #4133: Wiki
Feature #4133: Wiki
Project: Grupo 2 B Status: Resolved Start date: 08/20/2024 Due date: 08/30/2024 Assignee: diego pizarro Priority: High
Grupo 3 B -
Feature #3799: Prototipo del Robot
Feature #3799: Prototipo del Robot
Project: Grupo 3 B Status: Resolved Start date: 08/08/2024 Due date: 08/30/2024 Assignee: Priority: High
Grupo 3 B -
Feature #3802: Primer brazo del robot
Feature #3802: Primer brazo del robot
Project: Grupo 3 B Status: Resolved Start date: 08/23/2024 Due date: 08/30/2024 Assignee: martin delsolar Priority: Normal
Grupo 3 B -
Feature #3807: Bocetos del Logo
Feature #3807: Bocetos del Logo
Project: Grupo 3 B Status: Resolved Start date: 08/22/2024 Due date: 08/30/2024 Assignee: mayling alvarez Priority: Normal
Grupo 3 B -
Feature #3827: Wiki
Feature #3827: Wiki
Project: Grupo 3 B Status: Resolved Start date: 08/20/2024 Due date: 08/30/2024 Assignee: Priority: Normal
Grupo 1 A -
Feature #3873: Informe de la etapa 1
Feature #3873: Informe de la etapa 1
Project: Grupo 1 A Status: New Start date: 08/30/2024 Due date: 09/05/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #4124: Librerías
Feature #4124: Librerías
Project: Grupo 1 B Status: New Start date: 08/30/2024 Due date: 09/13/2024 Assignee: Priority: Normal
Grupo 2 B -
Feature #4135: Codificación
Feature #4135: Codificación
Project: Grupo 2 B Status: Resolved Start date: 08/30/2024 Due date: 09/13/2024 Assignee: fernando diaz Priority: Normal
Grupo 2 B -
Feature #4136: Ingreso al servidor SS.HH
Feature #4136: Ingreso al servidor SS.HH
Project: Grupo 2 B Status: Resolved Start date: 08/30/2024 Due date: 09/06/2024 Assignee: andre guerra Priority: Normal
Grupo 2 B -
Feature #4137: Estudio de librerías EV3 Mi...
Feature #4137: Estudio de librerías EV3 MicroPython
Project: Grupo 2 B Status: Resolved Start date: 08/30/2024 Due date: 09/13/2024 Assignee: fernando diaz Priority: Normal
Grupo 2 B -
Feature #4138: Informe 1
Feature #4138: Informe 1
Project: Grupo 2 B Status: Resolved Start date: 08/30/2024 Due date: 09/09/2024 Assignee: andre guerra Priority: Urgent |
31 |
issue beginning this day issue ending this day issue beginning and ending this day