Calendar
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | |
---|---|---|---|---|---|---|---|
40 |
29
Grupo 4 A -
Support #3745: Bitacora 5
Support #3745: Bitacora 5
Project: Grupo 4 A Status: Resolved Start date: 09/23/2024 Due date: 09/29/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #4253: Documentación
Feature #4253: Documentación
Project: Grupo 1 B Status: New Start date: 09/29/2024 Due date: 11/05/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #4254: Bitácoras
Feature #4254: Bitácoras
Project: Grupo 1 B Status: New Start date: 09/29/2024 Due date: 11/05/2024 Assignee: Priority: Normal |
30
Grupo 2 A -
Feature #3707: Fase 1
Feature #3707: Fase 1
Project: Grupo 2 A Status: Resolved Start date: 08/12/2024 Due date: 09/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3913: Avance del EV3-F1
Feature #3913: Avance del EV3-F1
Project: Grupo 2 A Status: New Start date: 08/12/2024 Due date: 09/30/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #3927: Creación archivos librería....
Feature #3927: Creación archivos librería.py y server.py
Project: Grupo 2 A Status: New Start date: 08/26/2024 Due date: 09/30/2024 Assignee: Priority: Normal
Grupo 3 B -
Feature #3962: Diseño del Logo
Feature #3962: Diseño del Logo
Project: Grupo 3 B Status: Resolved Start date: 09/23/2024 Due date: 09/30/2024 Assignee: mayling alvarez Priority: Normal
Grupo 2 A -
Feature #4353: Fase 2
Feature #4353: Fase 2
Project: Grupo 2 A Status: In Progress Start date: 09/30/2024 Due date: 11/17/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4355: Bitácoras
Feature #4355: Bitácoras
Project: Grupo 2 A Status: In Progress Start date: 09/30/2024 Due date: 11/10/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4677: Diseño y armado del EV3
Feature #4677: Diseño y armado del EV3
Project: Grupo 2 A Status: Resolved Start date: 09/30/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4678: Nuevo rediseño del EV3 que ...
Feature #4678: Nuevo rediseño del EV3 que mejora la movilidad y agarre.
Project: Grupo 2 A Status: Resolved Start date: 09/30/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4682: Testing de corrección
Feature #4682: Testing de corrección
Project: Grupo 2 A Status: Resolved Start date: 09/30/2024 Due date: 11/17/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4683: Revisión del código EV3 par...
Feature #4683: Revisión del código EV3 para corregir posibles errores.
Project: Grupo 2 A Status: Resolved Start date: 09/30/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4688: Informe 2
Feature #4688: Informe 2
Project: Grupo 2 A Status: Resolved Start date: 09/30/2024 Due date: 11/17/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #4694: Bitácora semana 8
Support #4694: Bitácora semana 8
Project: Grupo 3 A Status: New Start date: 09/30/2024 Due date: 10/04/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4707: Actualización del Botón "Co...
Support #4707: Actualización del Botón "Conexión"
Project: Grupo 3 A Status: New Start date: 09/30/2024 Due date: 10/04/2024 Assignee: JEANY ARAVENA Priority: High
Grupo 3 A -
Support #4708: Implementación del Botón "C...
Support #4708: Implementación del Botón "Conectar Mando"
Project: Grupo 3 A Status: New Start date: 09/30/2024 Due date: 10/04/2024 Assignee: Tiara Canepa Priority: High
Grupo 4 A -
Support #3746: Bitacora 6
Support #3746: Bitacora 6
Project: Grupo 4 A Status: Resolved Start date: 09/30/2024 Due date: 10/06/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4072: Informe ll
Feature #4072: Informe ll
Project: Grupo 5 A Status: New Start date: 09/30/2024 Due date: 10/28/2024 Assignee: Priority: Normal
Grupo 5 B -
Feature #4003: Adaptación de los movimientos
Feature #4003: Adaptación de los movimientos
Project: Grupo 5 B Status: New Start date: 09/30/2024 Due date: 10/06/2024 Assignee: hilda albarracin Priority: High |
1
Grupo 2 B -
Feature #4443: Etapa 2
Feature #4443: Etapa 2
Project: Grupo 2 B Status: Resolved Start date: 10/01/2024 Due date: 11/15/2024 Assignee: Priority: Normal
Grupo 2 B -
Feature #4444: Bitácora Semanal
Feature #4444: Bitácora Semanal
Project: Grupo 2 B Status: Resolved Start date: 10/01/2024 Due date: 11/15/2024 Assignee: Priority: Normal |
2 |
3 |
4
Grupo 3 A -
Support #4694: Bitácora semana 8
Support #4694: Bitácora semana 8
Project: Grupo 3 A Status: New Start date: 09/30/2024 Due date: 10/04/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4707: Actualización del Botón "Co...
Support #4707: Actualización del Botón "Conexión"
Project: Grupo 3 A Status: New Start date: 09/30/2024 Due date: 10/04/2024 Assignee: JEANY ARAVENA Priority: High
Grupo 3 A -
Support #4708: Implementación del Botón "C...
Support #4708: Implementación del Botón "Conectar Mando"
Project: Grupo 3 A Status: New Start date: 09/30/2024 Due date: 10/04/2024 Assignee: Tiara Canepa Priority: High |
5 |
41 |
6
Grupo 4 A -
Support #3746: Bitacora 6
Support #3746: Bitacora 6
Project: Grupo 4 A Status: Resolved Start date: 09/30/2024 Due date: 10/06/2024 Assignee: Priority: Normal
Grupo 5 B -
Feature #4003: Adaptación de los movimientos
Feature #4003: Adaptación de los movimientos
Project: Grupo 5 B Status: New Start date: 09/30/2024 Due date: 10/06/2024 Assignee: hilda albarracin Priority: High |
7
Grupo 3 A -
Support #4711: Actualización del Prototipo...
Support #4711: Actualización del Prototipo del Robot a Versión V2
Project: Grupo 3 A Status: New Start date: 10/07/2024 Due date: 10/07/2024 Assignee: JEANY ARAVENA Priority: Normal
Grupo 3 A -
Support #4695: Bitácora semana 9
Support #4695: Bitácora semana 9
Project: Grupo 3 A Status: New Start date: 10/07/2024 Due date: 10/11/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4709: Avance en el Manual de Usuario
Support #4709: Avance en el Manual de Usuario
Project: Grupo 3 A Status: New Start date: 10/07/2024 Due date: 10/11/2024 Assignee: brandon pizarro Priority: Low
Grupo 4 A -
Support #3747: Bitacora 7
Support #3747: Bitacora 7
Project: Grupo 4 A Status: Resolved Start date: 10/07/2024 Due date: 10/13/2024 Assignee: Priority: Normal
Grupo 5 B -
Feature #4007: Servidor
Feature #4007: Servidor
Project: Grupo 5 B Status: New Start date: 10/07/2024 Due date: 10/16/2024 Assignee: martin gonzalez Priority: High
Grupo 5 B -
Feature #4008: Estudio librería socket
Feature #4008: Estudio librería socket
Project: Grupo 5 B Status: New Start date: 10/07/2024 Due date: 10/11/2024 Assignee: isaac contreras Priority: High |
8 |
9
Grupo 1 B -
Feature #4257: GUI
Feature #4257: GUI
Project: Grupo 1 B Status: New Start date: 09/24/2024 Due date: 10/09/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4684: Revisión del código complet...
Feature #4684: Revisión del código completa, ahora toca evaluar su eficiencia.
Project: Grupo 2 A Status: Resolved Start date: 10/09/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #4710: Pruebas de Precisión en el ...
Support #4710: Pruebas de Precisión en el Mecanismo de la Garra
Project: Grupo 3 A Status: New Start date: 10/09/2024 Due date: 10/11/2024 Assignee: Tiara Canepa Priority: Normal |
10 |
11
Grupo 3 A -
Support #4695: Bitácora semana 9
Support #4695: Bitácora semana 9
Project: Grupo 3 A Status: New Start date: 10/07/2024 Due date: 10/11/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4709: Avance en el Manual de Usuario
Support #4709: Avance en el Manual de Usuario
Project: Grupo 3 A Status: New Start date: 10/07/2024 Due date: 10/11/2024 Assignee: brandon pizarro Priority: Low
Grupo 3 A -
Support #4710: Pruebas de Precisión en el ...
Support #4710: Pruebas de Precisión en el Mecanismo de la Garra
Project: Grupo 3 A Status: New Start date: 10/09/2024 Due date: 10/11/2024 Assignee: Tiara Canepa Priority: Normal
Grupo 1 B -
Feature #4256: Programación
Feature #4256: Programación
Project: Grupo 1 B Status: New Start date: 09/24/2024 Due date: 10/11/2024 Assignee: Priority: Normal
Grupo 1 B -
Feature #4299: Movilidad del robot
Feature #4299: Movilidad del robot
Project: Grupo 1 B Status: New Start date: 09/26/2024 Due date: 10/11/2024 Assignee: Priority: Normal
Grupo 5 B -
Feature #4008: Estudio librería socket
Feature #4008: Estudio librería socket
Project: Grupo 5 B Status: New Start date: 10/07/2024 Due date: 10/11/2024 Assignee: isaac contreras Priority: High
Grupo 5 B -
Feature #4009: Codificación
Feature #4009: Codificación
Project: Grupo 5 B Status: New Start date: 10/11/2024 Due date: 10/16/2024 Assignee: isaac contreras Priority: Normal |
12 |
42 |
13
Grupo 4 A -
Support #3747: Bitacora 7
Support #3747: Bitacora 7
Project: Grupo 4 A Status: Resolved Start date: 10/07/2024 Due date: 10/13/2024 Assignee: Priority: Normal |
14
Grupo 1 A -
Feature #4044: Desarrollo de Manual de Usu...
Feature #4044: Desarrollo de Manual de Usuario
Project: Grupo 1 A Status: New Start date: 10/14/2024 Due date: 10/21/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4679: Integración del "Motor larg...
Feature #4679: Integración del "Motor largo" al diseño del EV3
Project: Grupo 2 A Status: Resolved Start date: 10/14/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4680: “La Garra” se modifica para...
Feature #4680: “La Garra” se modifica para levantar objetos más pesados.
Project: Grupo 2 A Status: Resolved Start date: 10/14/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4685: Test de eficiencia exitoso.
Feature #4685: Test de eficiencia exitoso.
Project: Grupo 2 A Status: Resolved Start date: 10/14/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4686: Se realiza un test de efici...
Feature #4686: Se realiza un test de eficiencia de "La Garra".
Project: Grupo 2 A Status: Resolved Start date: 10/14/2024 Due date: 11/17/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #4696: Bitácora semana 10
Support #4696: Bitácora semana 10
Project: Grupo 3 A Status: New Start date: 10/14/2024 Due date: 10/18/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4712: Avances en la Funcionalidad...
Support #4712: Avances en la Funcionalidad del Código de la Interfaz Gráfica
Project: Grupo 3 A Status: New Start date: 10/14/2024 Due date: 10/18/2024 Assignee: Tiara Canepa Priority: Low
Grupo 4 A -
Support #4720: Bitacora 8
Support #4720: Bitacora 8
Project: Grupo 4 A Status: Resolved Start date: 10/14/2024 Due date: 10/20/2024 Assignee: Priority: Normal |
15 |
16
Grupo 5 B -
Feature #4007: Servidor
Feature #4007: Servidor
Project: Grupo 5 B Status: New Start date: 10/07/2024 Due date: 10/16/2024 Assignee: martin gonzalez Priority: High
Grupo 5 B -
Feature #4009: Codificación
Feature #4009: Codificación
Project: Grupo 5 B Status: New Start date: 10/11/2024 Due date: 10/16/2024 Assignee: isaac contreras Priority: Normal
Grupo 3 A -
Support #4713: Lluvia de Ideas para la Org...
Support #4713: Lluvia de Ideas para la Organización del Manual
Project: Grupo 3 A Status: New Start date: 10/16/2024 Due date: 10/18/2024 Assignee: catalina ramirez Priority: Normal |
17
Grupo 3 B -
Feature #3815: Wiki
Feature #3815: Wiki
Project: Grupo 3 B Status: Resolved Start date: 09/23/2024 Due date: 10/17/2024 Assignee: mayling alvarez Priority: High
Grupo 3 B -
Feature #4111: Redacción
Feature #4111: Redacción
Project: Grupo 3 B Status: Resolved Start date: 09/23/2024 Due date: 10/17/2024 Assignee: mayling alvarez Priority: High
Grupo 3 B -
Feature #4110: Diseño
Feature #4110: Diseño
Project: Grupo 3 B Status: Resolved Start date: 10/17/2024 Due date: 10/31/2024 Assignee: mayling alvarez Priority: Normal
Grupo 4 B -
Feature #4665: Producción de Interfaz
Feature #4665: Producción de Interfaz
Project: Grupo 4 B Status: New Start date: 10/17/2024 Due date: 11/12/2024 Assignee: rafael nakata Priority: High
Grupo 4 B -
Feature #4666: Codificación
Feature #4666: Codificación
Project: Grupo 4 B Status: New Start date: 10/17/2024 Due date: 11/12/2024 Assignee: rafael nakata Priority: High |
18
Grupo 3 A -
Support #4696: Bitácora semana 10
Support #4696: Bitácora semana 10
Project: Grupo 3 A Status: New Start date: 10/14/2024 Due date: 10/18/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4712: Avances en la Funcionalidad...
Support #4712: Avances en la Funcionalidad del Código de la Interfaz Gráfica
Project: Grupo 3 A Status: New Start date: 10/14/2024 Due date: 10/18/2024 Assignee: Tiara Canepa Priority: Low
Grupo 3 A -
Support #4713: Lluvia de Ideas para la Org...
Support #4713: Lluvia de Ideas para la Organización del Manual
Project: Grupo 3 A Status: New Start date: 10/16/2024 Due date: 10/18/2024 Assignee: catalina ramirez Priority: Normal
Grupo 4 A -
Feature #4487: Proyecto v.3
Feature #4487: Proyecto v.3
Project: Grupo 4 A Status: Resolved Start date: 10/18/2024 Due date: 11/25/2024 Assignee: Priority: High
Grupo 4 A -
Feature #4488: Diseño y armado de la versi...
Feature #4488: Diseño y armado de la version v.3
Project: Grupo 4 A Status: Resolved Start date: 10/18/2024 Due date: 11/07/2024 Assignee: alex munoz Priority: High
Grupo 4 B -
Feature #4667: Diseño
Feature #4667: Diseño
Project: Grupo 4 B Status: New Start date: 10/18/2024 Due date: 10/21/2024 Assignee: rafael nakata Priority: High
Grupo 5 B -
Feature #3983: Interfaz EV3
Feature #3983: Interfaz EV3
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 11/01/2024 Assignee: hilda albarracin Priority: High
Grupo 5 B -
Feature #3990: Informe 2
Feature #3990: Informe 2
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 10/28/2024 Assignee: martin gonzalez Priority: High
Grupo 5 B -
Feature #3993: Presentación 2
Feature #3993: Presentación 2
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 11/22/2024 Assignee: Guillermo Pino Priority: Urgent
Grupo 5 B -
Feature #3994: Distribución, creación y di...
Feature #3994: Distribución, creación y diseño
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 11/11/2024 Assignee: pedro archile Priority: High
Grupo 5 B -
Feature #4004: Diseño
Feature #4004: Diseño
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 11/01/2024 Assignee: hilda albarracin Priority: Normal |
19 |
43 |
20
Grupo 4 A -
Support #4720: Bitacora 8
Support #4720: Bitacora 8
Project: Grupo 4 A Status: Resolved Start date: 10/14/2024 Due date: 10/20/2024 Assignee: Priority: Normal |
21
Grupo 1 A -
Feature #4044: Desarrollo de Manual de Usu...
Feature #4044: Desarrollo de Manual de Usuario
Project: Grupo 1 A Status: New Start date: 10/14/2024 Due date: 10/21/2024 Assignee: Priority: Normal
Grupo 4 B -
Feature #4667: Diseño
Feature #4667: Diseño
Project: Grupo 4 B Status: New Start date: 10/18/2024 Due date: 10/21/2024 Assignee: rafael nakata Priority: High
Grupo 2 A -
Feature #4681: Diseño del EV3 finalizado y...
Feature #4681: Diseño del EV3 finalizado y considerado versión definitiva
Project: Grupo 2 A Status: Resolved Start date: 10/21/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 2 A -
Feature #4687: Se inician pruebas de rendi...
Feature #4687: Se inician pruebas de rendimiento y respuesta del EV3.
Project: Grupo 2 A Status: Resolved Start date: 10/21/2024 Due date: 11/16/2024 Assignee: Priority: Normal
Grupo 3 A -
Support #4697: Bitácora semana 11
Support #4697: Bitácora semana 11
Project: Grupo 3 A Status: New Start date: 10/21/2024 Due date: 10/25/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4714: Verificación de la Conexión...
Support #4714: Verificación de la Conexión del Mando en la Interfaz Gráfica
Project: Grupo 3 A Status: New Start date: 10/21/2024 Due date: 10/25/2024 Assignee: JEANY ARAVENA Priority: Normal
Grupo 4 A -
Support #4721: Bitacora 9
Support #4721: Bitacora 9
Project: Grupo 4 A Status: Resolved Start date: 10/21/2024 Due date: 10/28/2024 Assignee: Priority: Normal
Grupo 4 B -
Feature #4673: Creación del Servidor
Feature #4673: Creación del Servidor
Project: Grupo 4 B Status: New Start date: 10/21/2024 Due date: 11/12/2024 Assignee: rafael nakata Priority: Normal
Grupo 4 B -
Feature #4674: Desarrollo de las funciones
Feature #4674: Desarrollo de las funciones
Project: Grupo 4 B Status: New Start date: 10/21/2024 Due date: 11/07/2024 Assignee: rafael nakata Priority: Normal |
22
Grupo 5 B -
Feature #4005: Codificación
Feature #4005: Codificación
Project: Grupo 5 B Status: New Start date: 10/22/2024 Due date: 10/29/2024 Assignee: isaac contreras Priority: High |
23
Grupo 1 B -
Feature #4255: Informe 2
Feature #4255: Informe 2
Project: Grupo 1 B Status: New Start date: 10/23/2024 Due date: 11/05/2024 Assignee: Priority: Normal |
24
Grupo 5 A -
Feature #4043: Etapa 3
Feature #4043: Etapa 3
Project: Grupo 5 A Status: New Start date: 10/24/2024 Due date: 12/13/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4069: Manual de Usuario
Feature #4069: Manual de Usuario
Project: Grupo 5 A Status: New Start date: 10/24/2024 Due date: 12/13/2024 Assignee: Priority: Normal |
25
Grupo 3 A -
Support #4697: Bitácora semana 11
Support #4697: Bitácora semana 11
Project: Grupo 3 A Status: New Start date: 10/21/2024 Due date: 10/25/2024 Assignee: catalina ramirez Priority: Normal
Grupo 3 A -
Support #4714: Verificación de la Conexión...
Support #4714: Verificación de la Conexión del Mando en la Interfaz Gráfica
Project: Grupo 3 A Status: New Start date: 10/21/2024 Due date: 10/25/2024 Assignee: JEANY ARAVENA Priority: Normal
Grupo 5 A -
Feature #4067: Informe Final
Feature #4067: Informe Final
Project: Grupo 5 A Status: New Start date: 10/25/2024 Due date: 12/13/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4070: Presentación Final
Feature #4070: Presentación Final
Project: Grupo 5 A Status: New Start date: 10/25/2024 Due date: 12/13/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4074: Bitácoras
Feature #4074: Bitácoras
Project: Grupo 5 A Status: New Start date: 10/25/2024 Due date: 12/13/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4076: Documentación
Feature #4076: Documentación
Project: Grupo 5 A Status: New Start date: 10/25/2024 Due date: 12/13/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4298: Pruebas de funcionamiento
Feature #4298: Pruebas de funcionamiento
Project: Grupo 5 A Status: New Start date: 10/25/2024 Due date: 12/13/2024 Assignee: cristobal hernandez Priority: Normal |
26 |
44 |
27
Grupo 5 B -
Feature #3982: Diseño de la arquitectura d...
Feature #3982: Diseño de la arquitectura del robot
Project: Grupo 5 B Status: New Start date: 09/23/2024 Due date: 10/27/2024 Assignee: isaac contreras Priority: High
Grupo 5 B -
Feature #4002: Movimientos del robot
Feature #4002: Movimientos del robot
Project: Grupo 5 B Status: New Start date: 09/23/2024 Due date: 10/27/2024 Assignee: isaac contreras Priority: High |
28
Grupo 4 A -
Support #4721: Bitacora 9
Support #4721: Bitacora 9
Project: Grupo 4 A Status: Resolved Start date: 10/21/2024 Due date: 10/28/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4031: Bitacoras
Feature #4031: Bitacoras
Project: Grupo 5 A Status: New Start date: 09/23/2024 Due date: 10/28/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4072: Informe ll
Feature #4072: Informe ll
Project: Grupo 5 A Status: New Start date: 09/30/2024 Due date: 10/28/2024 Assignee: Priority: Normal
Grupo 5 B -
Feature #3990: Informe 2
Feature #3990: Informe 2
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 10/28/2024 Assignee: martin gonzalez Priority: High
Grupo 3 A -
Support #4698: Bitácora semana 12
Support #4698: Bitácora semana 12
Project: Grupo 3 A Status: New Start date: 10/28/2024 Due date: 11/01/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4715: Modificación del Comportami...
Support #4715: Modificación del Comportamiento del Joystick
Project: Grupo 3 A Status: New Start date: 10/28/2024 Due date: 11/01/2024 Assignee: Tiara Canepa Priority: High
Grupo 5 B -
Feature #4006: Depuración
Feature #4006: Depuración
Project: Grupo 5 B Status: New Start date: 10/28/2024 Due date: 11/17/2024 Assignee: martin gonzalez Priority: Normal |
29
Grupo 5 B -
Feature #4005: Codificación
Feature #4005: Codificación
Project: Grupo 5 B Status: New Start date: 10/22/2024 Due date: 10/29/2024 Assignee: isaac contreras Priority: High
Grupo 4 A -
Support #4722: Bitacora 10
Support #4722: Bitacora 10
Project: Grupo 4 A Status: Resolved Start date: 10/29/2024 Due date: 11/07/2024 Assignee: Priority: Normal |
30 |
31
Grupo 5 A -
Feature #4028: Etapa 2
Feature #4028: Etapa 2
Project: Grupo 5 A Status: New Start date: 09/09/2024 Due date: 10/31/2024 Assignee: Priority: High
Grupo 5 A -
Feature #4029: Creación de Interfaz
Feature #4029: Creación de Interfaz
Project: Grupo 5 A Status: New Start date: 09/09/2024 Due date: 10/31/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4033: Codificación
Feature #4033: Codificación
Project: Grupo 5 A Status: New Start date: 09/09/2024 Due date: 10/31/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4035: Diseño
Feature #4035: Diseño
Project: Grupo 5 A Status: New Start date: 09/09/2024 Due date: 10/31/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4073: Presentación ll
Feature #4073: Presentación ll
Project: Grupo 5 A Status: New Start date: 09/23/2024 Due date: 10/31/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4077: Documentación
Feature #4077: Documentación
Project: Grupo 5 A Status: New Start date: 09/23/2024 Due date: 10/31/2024 Assignee: Priority: Normal
Grupo 5 A -
Feature #4295: Codificación de los movimie...
Feature #4295: Codificación de los movimientos del robot
Project: Grupo 5 A Status: New Start date: 09/09/2024 Due date: 10/31/2024 Assignee: cristobal hernandez Priority: High
Grupo 3 B -
Feature #4110: Diseño
Feature #4110: Diseño
Project: Grupo 3 B Status: Resolved Start date: 10/17/2024 Due date: 10/31/2024 Assignee: mayling alvarez Priority: Normal
Grupo 4 B -
Feature #4675: Codificación del Server
Feature #4675: Codificación del Server
Project: Grupo 4 B Status: New Start date: 10/31/2024 Due date: 11/12/2024 Assignee: rafael nakata Priority: Normal |
1
Grupo 3 A -
Support #4698: Bitácora semana 12
Support #4698: Bitácora semana 12
Project: Grupo 3 A Status: New Start date: 10/28/2024 Due date: 11/01/2024 Assignee: brandon pizarro Priority: Normal
Grupo 3 A -
Support #4715: Modificación del Comportami...
Support #4715: Modificación del Comportamiento del Joystick
Project: Grupo 3 A Status: New Start date: 10/28/2024 Due date: 11/01/2024 Assignee: Tiara Canepa Priority: High
Grupo 5 B -
Feature #3981: Avance del Robot
Feature #3981: Avance del Robot
Project: Grupo 5 B Status: New Start date: 09/23/2024 Due date: 11/01/2024 Assignee: isaac contreras Priority: High
Grupo 5 B -
Feature #3983: Interfaz EV3
Feature #3983: Interfaz EV3
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 11/01/2024 Assignee: hilda albarracin Priority: High
Grupo 5 B -
Feature #4004: Diseño
Feature #4004: Diseño
Project: Grupo 5 B Status: New Start date: 10/18/2024 Due date: 11/01/2024 Assignee: hilda albarracin Priority: Normal |
2 |
issue beginning this day issue ending this day issue beginning and ending this day