General

Profile

Calendar

Filters

« November | January 2025 »

Apply Clear

SundayMondayTuesdayWednesdayThursdayFridaySaturday
49

1

Grupo 1 B - Feature #4768: GUI Feature #4768: GUI

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/01/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4769: Revisión del diseño de la GUI Feature #4769: Revisión del diseño de la GUI

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/01/2024
Assignee:
Priority: Normal
Grupo 5 B - Feature #3999: Informe final Feature #3999: Informe final

Project: Grupo 5 B
Status: New
Start date: 11/25/2024
Due date: 12/01/2024
Assignee: hilda albarracin
Priority: High
Grupo 5 B - Feature #4001: Funcionamiento del robot Feature #4001: Funcionamiento del robot

Project: Grupo 5 B
Status: New
Start date: 11/25/2024
Due date: 12/01/2024
Assignee: isaac contreras
Priority: Normal
Grupo 3A-2024 - Feature #4461: Informe III Feature #4461: Informe III

Project: Grupo 3A-2024
Status: New
Start date: 11/25/2024
Due date: 12/01/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #4463: Manual de usuario Feature #4463: Manual de usuario

Project: Grupo 3A-2024
Status: New
Start date: 11/25/2024
Due date: 12/01/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #4465: Poster promocional Feature #4465: Poster promocional

Project: Grupo 3A-2024
Status: New
Start date: 11/25/2024
Due date: 12/01/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4745: Implementación Feature #4745: Implementación

Project: Grupo 7A-2024
Status: New
Start date: 11/04/2024
Due date: 12/01/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #4777: Etapa 3 Feature #4777: Etapa 3

Project: Grupo 2 B
Status: Resolved
Start date: 12/01/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #4779: Presentación final Feature #4779: Presentación final

Project: Grupo 2 B
Status: Resolved
Start date: 12/01/2024
Due date: 12/13/2024
Assignee:
Priority: Normal

2

Grupo 2B-2024 - Feature #4733: Modulos Feature #4733: Modulos

Project: Grupo 2B-2024
Status: New
Start date: 11/25/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4734: Instalación de sensor NPK Feature #4734: Instalación de sensor NPK

Project: Grupo 2B-2024
Status: New
Start date: 11/21/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4217: Informe final Feature #4217: Informe final

Project: Grupo 4B-2024
Status: New
Start date: 11/06/2024
Due date: 12/02/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4219: Manual de usuario Feature #4219: Manual de usuario

Project: Grupo 4B-2024
Status: New
Start date: 11/06/2024
Due date: 12/02/2024
Assignee: Cesar Jimenez
Priority: Normal
Grupo 4B-2024 - Feature #4737: Creación de poster Feature #4737: Creación de poster

Project: Grupo 4B-2024
Status: New
Start date: 11/06/2024
Due date: 12/02/2024
Assignee: Andrea Navia
Priority: Normal
Grupo 7A-2024 - Feature #4272: Fase III Feature #4272: Fase III

Project: Grupo 7A-2024
Status: New
Start date: 11/04/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4315: Redactar manual de usuario Feature #4315: Redactar manual de usuario

Project: Grupo 7A-2024
Status: New
Start date: 11/15/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4398: Desarrollar informe final Feature #4398: Desarrollar informe final

Project: Grupo 7A-2024
Status: New
Start date: 11/08/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4746: Creación poster Feature #4746: Creación poster

Project: Grupo 7A-2024
Status: New
Start date: 11/25/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Grupo 7A-2024 - Feature #4747: Pruebas de funcionamiento Feature #4747: Pruebas de funcionamiento

Project: Grupo 7A-2024
Status: New
Start date: 11/27/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Codelco - Support #4363: Creacion del modelo de pred... Support #4363: Creacion del modelo de prediccion

Project: Codelco
Status: In Progress
Start date: 11/18/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Codelco - Support #4748: Se agregan datos faltantes ... Support #4748: Se agregan datos faltantes a la fuente de datos

Project: Codelco
Status: New
Start date: 11/29/2024
Due date: 12/02/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4735: manual de usuario Bug #4735: manual de usuario

Project: Grupo 4A-2024
Status: New
Start date: 12/02/2024
Due date:
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4736: poster Bug #4736: poster

Project: Grupo 4A-2024
Status: New
Start date: 12/02/2024
Due date:
Assignee:
Priority: Normal
RAcuerpoPlastinado - Bug #4749: Mostrar avance final. Bug #4749: Mostrar avance final.

Project: RAcuerpoPlastinado
Status: New
Start date: 12/02/2024
Due date: 12/06/2024
Assignee: David Orellana
Priority: Normal
Grupo 2 B - Feature #4778: Informe 3 Feature #4778: Informe 3

Project: Grupo 2 B
Status: Resolved
Start date: 12/02/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 4 B - Feature #3970: Etapa 3 Feature #3970: Etapa 3

Project: Grupo 4 B
Status: New
Start date: 12/02/2024
Due date: 12/12/2024
Assignee: rafael nakata
Priority: High
Grupo 4 B - Feature #4775: Informe final Feature #4775: Informe final

Project: Grupo 4 B
Status: New
Start date: 12/02/2024
Due date: 12/12/2024
Assignee: brandon jalanoca
Priority: High

3

Grupo 2B-2024 - Feature #4614: Informe lll Feature #4614: Informe lll

Project: Grupo 2B-2024
Status: New
Start date: 11/06/2024
Due date: 12/03/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4615: Implementación de interfaz Feature #4615: Implementación de interfaz

Project: Grupo 2B-2024
Status: New
Start date: 11/06/2024
Due date: 12/03/2024
Assignee:
Priority: Normal
Grupo 6A-2024 - Feature #4233: Fase de pruebas Feature #4233: Fase de pruebas

Project: Grupo 6A-2024
Status: New
Start date: 12/03/2024
Due date: 12/17/2024
Assignee:
Priority: High

4

Grupo 4A-2024 - Bug #4471: Parte III Bug #4471: Parte III

Project: Grupo 4A-2024
Status: New
Start date: 11/11/2024
Due date: 12/04/2024
Assignee:
Priority: Normal
Grupo 4A-2024 - Bug #4476: Presentar El informe III Bug #4476: Presentar El informe III

Project: Grupo 4A-2024
Status: New
Start date: 11/26/2024
Due date: 12/04/2024
Assignee:
Priority: Normal
Grupo 1 A - Feature #4097: Etapa N°3 Feature #4097: Etapa N°3

Project: Grupo 1 A
Status: New
Start date: 11/18/2024
Due date: 12/04/2024
Assignee:
Priority: Normal
Grupo 1 A - Feature #4098: Documentacion Etapa N°3 Feature #4098: Documentacion Etapa N°3

Project: Grupo 1 A
Status: New
Start date: 11/18/2024
Due date: 12/04/2024
Assignee:
Priority: Normal
Grupo 1 A - Feature #4101: Informe Final Feature #4101: Informe Final

Project: Grupo 1 A
Status: New
Start date: 11/20/2024
Due date: 12/04/2024
Assignee:
Priority: Normal
Grupo 6A-2024 - Feature #4232: Implementar la arquitectura... Feature #4232: Implementar la arquitectura de comunicación con el celular

Project: Grupo 6A-2024
Status: New
Start date: 11/20/2024
Due date: 12/04/2024
Assignee:
Priority: High
Grupo 6A-2024 - Feature #4636: Programar el sistema Feature #4636: Programar el sistema

Project: Grupo 6A-2024
Status: New
Start date: 11/20/2024
Due date: 12/04/2024
Assignee:
Priority: Normal
Grupo 6A-2024 - Feature #4234: Redactar informe III Feature #4234: Redactar informe III

Project: Grupo 6A-2024
Status: New
Start date: 12/04/2024
Due date: 12/19/2024
Assignee:
Priority: High

5

Grupo 5B-2024 - Bug #4630: Informe Fase 3 Bug #4630: Informe Fase 3

Project: Grupo 5B-2024
Status: New
Start date: 11/05/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 5B-2024 - Bug #4631: Producto final Bug #4631: Producto final

Project: Grupo 5B-2024
Status: New
Start date: 11/05/2024
Due date: 12/05/2024
Assignee: pablo varas
Priority: Normal
Grupo 2A-2024 - Bug #4574: Desarrollo sensores Bug #4574: Desarrollo sensores

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4575: Conexión y Funcionamiento P... Bug #4575: Conexión y Funcionamiento Pantalla Azul

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4576: Conexión y Funcionamiento L... Bug #4576: Conexión y Funcionamiento Luces Leds

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4577: Conexión y Funcionamiento S... Bug #4577: Conexión y Funcionamiento Servo Motor

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4578: Conexión y Funcionamiento C... Bug #4578: Conexión y Funcionamiento Cerradura Eléctrica

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4579: Conexión y Funcionamiento S... Bug #4579: Conexión y Funcionamiento Sensor Huella digital

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4580: Conexión y Funcionamiento T... Bug #4580: Conexión y Funcionamiento Teclado Matricial

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2A-2024 - Bug #4581: Fase III: Implementación Bug #4581: Fase III: Implementación

Project: Grupo 2A-2024
Status: New
Start date: 10/08/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4731: Redaccion de Manual de Usuario Feature #4731: Redaccion de Manual de Usuario

Project: Grupo 2B-2024
Status: New
Start date: 11/26/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 2B-2024 - Feature #4732: Creación poster(afiche) Feature #4732: Creación poster(afiche)

Project: Grupo 2B-2024
Status: New
Start date: 11/26/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4142: Documentación del proyecto Feature #4142: Documentación del proyecto

Project: Grupo 4B-2024
Status: New
Start date: 08/12/2024
Due date: 12/05/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4143: Bitácoras Feature #4143: Bitácoras

Project: Grupo 4B-2024
Status: New
Start date: 08/12/2024
Due date: 12/05/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4144: Carta Gantt Feature #4144: Carta Gantt

Project: Grupo 4B-2024
Status: New
Start date: 08/29/2024
Due date: 12/05/2024
Assignee: Ignacio Garrido
Priority: Normal
Grupo 4B-2024 - Feature #4145: Wiki Feature #4145: Wiki

Project: Grupo 4B-2024
Status: New
Start date: 09/03/2024
Due date: 12/05/2024
Assignee: Andrea Navia
Priority: Normal
Grupo 4B-2024 - Feature #4215: Fase 3 Feature #4215: Fase 3

Project: Grupo 4B-2024
Status: New
Start date: 11/06/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4216: Proyecto Final Feature #4216: Proyecto Final

Project: Grupo 4B-2024
Status: New
Start date: 11/06/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 4B-2024 - Feature #4218: Presentación final Feature #4218: Presentación final

Project: Grupo 4B-2024
Status: New
Start date: 11/06/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
FacOdon-1 - Feature #4352: Informe de Avance 3 Feature #4352: Informe de Avance 3

Project: FacOdon-1
Status: Resolved
Start date: 10/28/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Codelco - Support #4364: Pruebas sobre el modelo Support #4364: Pruebas sobre el modelo

Project: Codelco
Status: New
Start date: 11/25/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Codelco - Support #4365: Reparación del modelo en ca... Support #4365: Reparación del modelo en caso de ser necesario

Project: Codelco
Status: In Progress
Start date: 11/30/2024
Due date: 12/05/2024
Assignee:
Priority: Normal
Grupo 4 B - Feature #4773: Pruebas Finales del Robot Feature #4773: Pruebas Finales del Robot

Project: Grupo 4 B
Status: New
Start date: 12/05/2024
Due date: 12/12/2024
Assignee: rafael nakata
Priority: High

6

RAcuerpoPlastinado - Bug #4749: Mostrar avance final. Bug #4749: Mostrar avance final.

Project: RAcuerpoPlastinado
Status: New
Start date: 12/02/2024
Due date: 12/06/2024
Assignee: David Orellana
Priority: Normal
RAcuerpoPlastinado - Bug #4750: Pruebas de modelos AR Bug #4750: Pruebas de modelos AR

Project: RAcuerpoPlastinado
Status: New
Start date: 11/11/2024
Due date: 12/06/2024
Assignee: David Orellana
Priority: Normal
RAcuerpoPlastinado - Bug #4751: Agregar rotulaciones Bug #4751: Agregar rotulaciones

Project: RAcuerpoPlastinado
Status: New
Start date: 11/25/2024
Due date: 12/06/2024
Assignee: David Orellana
Priority: Normal
Grupo 3A-2024 - Feature #4760: Pruebas de funcionamiento Feature #4760: Pruebas de funcionamiento

Project: Grupo 3A-2024
Status: New
Start date: 11/27/2024
Due date: 12/06/2024
Assignee:
Priority: Normal
FacOdon-1 - Feature #4347: Documentación Feature #4347: Documentación

Project: FacOdon-1
Status: New
Start date: 09/09/2024
Due date: 12/06/2024
Assignee: Camilo Valenzuela
Priority: Normal
FacOdon-1 - Feature #4348: Crear manual de usuario Feature #4348: Crear manual de usuario

Project: FacOdon-1
Status: New
Start date: 11/25/2024
Due date: 12/06/2024
Assignee: Camilo Valenzuela
Priority: Normal
FacOdon-1 - Feature #4349: Creación de informe final Feature #4349: Creación de informe final

Project: FacOdon-1
Status: New
Start date: 11/25/2024
Due date: 12/06/2024
Assignee: Camilo Valenzuela
Priority: Normal
Grupo 4 B - Feature #4774: Manual de Usuario Feature #4774: Manual de Usuario

Project: Grupo 4 B
Status: New
Start date: 12/06/2024
Due date: 12/12/2024
Assignee: ariel colque
Priority: High

7

Grupo 3A-2024 - Feature #4761: Presentación III Feature #4761: Presentación III

Project: Grupo 3A-2024
Status: New
Start date: 12/07/2024
Due date: 12/10/2024
Assignee:
Priority: Normal
50

8

9

Grupo 4 B - Feature #4776: Presentación Final Feature #4776: Presentación Final

Project: Grupo 4 B
Status: New
Start date: 12/09/2024
Due date: 12/12/2024
Assignee: ariel colque
Priority: Normal

10

Grupo 3 B - Feature #3989: Optimización Feature #3989: Optimización

Project: Grupo 3 B
Status: Resolved
Start date: 11/14/2024
Due date: 12/10/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #4117: Maximización de eficiencia ... Feature #4117: Maximización de eficiencia del código

Project: Grupo 3 B
Status: Resolved
Start date: 11/14/2024
Due date: 12/10/2024
Assignee: ivan collao
Priority: Normal
Grupo 3A-2024 - Feature #4452: Fase 3 Feature #4452: Fase 3

Project: Grupo 3A-2024
Status: New
Start date: 11/06/2024
Due date: 12/10/2024
Assignee:
Priority: Normal
Grupo 3A-2024 - Feature #4761: Presentación III Feature #4761: Presentación III

Project: Grupo 3A-2024
Status: New
Start date: 12/07/2024
Due date: 12/10/2024
Assignee:
Priority: Normal
RAcuerpoPlastinado - Bug #4383: Término del proyecto Bug #4383: Término del proyecto

Project: RAcuerpoPlastinado
Status: New
Start date: 12/10/2024
Due date:
Assignee: David Orellana
Priority: Normal
Grupo 6A-2024 - Feature #4236: Elaborar manual de usuario Feature #4236: Elaborar manual de usuario

Project: Grupo 6A-2024
Status: New
Start date: 12/10/2024
Due date: 12/16/2024
Assignee:
Priority: High

11

Grupo 6A-2024 - Feature #4235: Presentar informe III Feature #4235: Presentar informe III

Project: Grupo 6A-2024
Status: New
Start date: 12/11/2024
Due date: 12/19/2024
Assignee:
Priority: High

12

Grupo 1 B - Feature #4764: Fase 3 Feature #4764: Fase 3

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/12/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4765: Robot Feature #4765: Robot

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/12/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4766: Revisión del diseño Feature #4766: Revisión del diseño

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/12/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4767: Pruebas Feature #4767: Pruebas

Project: Grupo 1 B
Status: New
Start date: 11/13/2024
Due date: 12/12/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4770: Documentación Feature #4770: Documentación

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/12/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4771: Redacción informe Final Feature #4771: Redacción informe Final

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/12/2024
Assignee:
Priority: Normal
Grupo 1 B - Feature #4772: Manual de usuario Feature #4772: Manual de usuario

Project: Grupo 1 B
Status: New
Start date: 11/06/2024
Due date: 12/12/2024
Assignee:
Priority: Normal
Grupo 4 B - Feature #3970: Etapa 3 Feature #3970: Etapa 3

Project: Grupo 4 B
Status: New
Start date: 12/02/2024
Due date: 12/12/2024
Assignee: rafael nakata
Priority: High
Grupo 4 B - Feature #4773: Pruebas Finales del Robot Feature #4773: Pruebas Finales del Robot

Project: Grupo 4 B
Status: New
Start date: 12/05/2024
Due date: 12/12/2024
Assignee: rafael nakata
Priority: High
Grupo 4 B - Feature #4774: Manual de Usuario Feature #4774: Manual de Usuario

Project: Grupo 4 B
Status: New
Start date: 12/06/2024
Due date: 12/12/2024
Assignee: ariel colque
Priority: High
Grupo 4 B - Feature #4775: Informe final Feature #4775: Informe final

Project: Grupo 4 B
Status: New
Start date: 12/02/2024
Due date: 12/12/2024
Assignee: brandon jalanoca
Priority: High
Grupo 4 B - Feature #4776: Presentación Final Feature #4776: Presentación Final

Project: Grupo 4 B
Status: New
Start date: 12/09/2024
Due date: 12/12/2024
Assignee: ariel colque
Priority: Normal
Grupo 5 B - Feature #4000: Presentación Feature #4000: Presentación

Project: Grupo 5 B
Status: New
Start date: 12/12/2024
Due date: 12/16/2024
Assignee: Guillermo Pino
Priority: High

13

Grupo 2 A - Feature #4762: Presentación Final Feature #4762: Presentación Final

Project: Grupo 2 A
Status: Resolved
Start date: 12/13/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #4763: Informe Final Feature #4763: Informe Final

Project: Grupo 2 A
Status: Resolved
Start date: 12/13/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 4 A - Feature #3901: Informes Feature #3901: Informes

Project: Grupo 4 A
Status: In Progress
Start date: 09/02/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 4 A - Feature #3902: Presentaciones Feature #3902: Presentaciones

Project: Grupo 4 A
Status: In Progress
Start date: 09/02/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 4 A - Feature #4781: Presentacion Final Feature #4781: Presentacion Final

Project: Grupo 4 A
Status: In Progress
Start date: 11/28/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 4 A - Feature #4782: Informe Final Feature #4782: Informe Final

Project: Grupo 4 A
Status: In Progress
Start date: 11/28/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4043: Etapa 3 Feature #4043: Etapa 3

Project: Grupo 5 A
Status: New
Start date: 10/24/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4067: Informe Final Feature #4067: Informe Final

Project: Grupo 5 A
Status: New
Start date: 10/25/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4069: Manual de Usuario Feature #4069: Manual de Usuario

Project: Grupo 5 A
Status: New
Start date: 10/24/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4070: Presentación Final Feature #4070: Presentación Final

Project: Grupo 5 A
Status: New
Start date: 10/25/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4074: Bitácoras Feature #4074: Bitácoras

Project: Grupo 5 A
Status: New
Start date: 10/25/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4076: Documentación Feature #4076: Documentación

Project: Grupo 5 A
Status: New
Start date: 10/25/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 5 A - Feature #4298: Pruebas de funcionamiento Feature #4298: Pruebas de funcionamiento

Project: Grupo 5 A
Status: New
Start date: 10/25/2024
Due date: 12/13/2024
Assignee: cristobal hernandez
Priority: Normal
Grupo 2 B - Feature #4777: Etapa 3 Feature #4777: Etapa 3

Project: Grupo 2 B
Status: Resolved
Start date: 12/01/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #4778: Informe 3 Feature #4778: Informe 3

Project: Grupo 2 B
Status: Resolved
Start date: 12/02/2024
Due date: 12/13/2024
Assignee:
Priority: Normal
Grupo 2 B - Feature #4779: Presentación final Feature #4779: Presentación final

Project: Grupo 2 B
Status: Resolved
Start date: 12/01/2024
Due date: 12/13/2024
Assignee:
Priority: Normal

14

Grupo 6A-2024 - Feature #4237: Crear poster Feature #4237: Crear poster

Project: Grupo 6A-2024
Status: New
Start date: 12/14/2024
Due date: 12/18/2024
Assignee:
Priority: High
51

15

Grupo 2 A - Feature #4727: Fase 3 Feature #4727: Fase 3

Project: Grupo 2 A
Status: New
Start date: 11/18/2024
Due date: 12/15/2024
Assignee:
Priority: Normal
Grupo 2 A - Feature #4728: Manual de Usuario Feature #4728: Manual de Usuario

Project: Grupo 2 A
Status: Resolved
Start date: 11/18/2024
Due date: 12/15/2024
Assignee:
Priority: Normal

16

Grupo 3 B - Feature #3985: Informe 3 (Final) Feature #3985: Informe 3 (Final)

Project: Grupo 3 B
Status: Resolved
Start date: 11/19/2024
Due date: 12/16/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3986: Presentación 3 (Final) Feature #3986: Presentación 3 (Final)

Project: Grupo 3 B
Status: Resolved
Start date: 11/19/2024
Due date: 12/16/2024
Assignee:
Priority: Normal
Grupo 3 B - Feature #3988: Manual de Ususario Feature #3988: Manual de Ususario

Project: Grupo 3 B
Status: Resolved
Start date: 11/12/2024
Due date: 12/16/2024
Assignee:
Priority: High
Grupo 3 B - Feature #4139: Documentación Feature #4139: Documentación

Project: Grupo 3 B
Status: Resolved
Start date: 11/19/2024
Due date: 12/16/2024
Assignee: kamila diaz
Priority: Normal
Grupo 5 B - Feature #3991: Fase 3 Feature #3991: Fase 3

Project: Grupo 5 B
Status: New
Start date: 11/18/2024
Due date: 12/16/2024
Assignee: hilda albarracin
Priority: High
Grupo 5 B - Feature #3997: Documentación Feature #3997: Documentación

Project: Grupo 5 B
Status: New
Start date: 11/18/2024
Due date: 12/16/2024
Assignee: isaac contreras
Priority: High
Grupo 5 B - Feature #4000: Presentación Feature #4000: Presentación

Project: Grupo 5 B
Status: New
Start date: 12/12/2024
Due date: 12/16/2024
Assignee: Guillermo Pino
Priority: High
Grupo 6A-2024 - Feature #4236: Elaborar manual de usuario Feature #4236: Elaborar manual de usuario

Project: Grupo 6A-2024
Status: New
Start date: 12/10/2024
Due date: 12/16/2024
Assignee:
Priority: High
Grupo 3 B - Feature #4119: Exhibición de resultado Feature #4119: Exhibición de resultado

Project: Grupo 3 B
Status: New
Start date: 12/16/2024
Due date: 12/20/2024
Assignee:
Priority: Normal

17

Grupo 6A-2024 - Feature #4233: Fase de pruebas Feature #4233: Fase de pruebas

Project: Grupo 6A-2024
Status: New
Start date: 12/03/2024
Due date: 12/17/2024
Assignee:
Priority: High

18

Grupo 6A-2024 - Feature #4237: Crear poster Feature #4237: Crear poster

Project: Grupo 6A-2024
Status: New
Start date: 12/14/2024
Due date: 12/18/2024
Assignee:
Priority: High

19

Grupo 6A-2024 - Feature #4231: Fase III Feature #4231: Fase III

Project: Grupo 6A-2024
Status: New
Start date: 11/20/2024
Due date: 12/19/2024
Assignee:
Priority: High
Grupo 6A-2024 - Feature #4234: Redactar informe III Feature #4234: Redactar informe III

Project: Grupo 6A-2024
Status: New
Start date: 12/04/2024
Due date: 12/19/2024
Assignee:
Priority: High
Grupo 6A-2024 - Feature #4235: Presentar informe III Feature #4235: Presentar informe III

Project: Grupo 6A-2024
Status: New
Start date: 12/11/2024
Due date: 12/19/2024
Assignee:
Priority: High

20

Grupo 3 B - Feature #3978: Fase 3 - Refinamiento Final Feature #3978: Fase 3 - Refinamiento Final

Project: Grupo 3 B
Status: In Progress
Start date: 11/12/2024
Due date: 12/20/2024
Assignee:
Priority: High
Grupo 3 B - Feature #4119: Exhibición de resultado Feature #4119: Exhibición de resultado

Project: Grupo 3 B
Status: New
Start date: 12/16/2024
Due date: 12/20/2024
Assignee:
Priority: Normal

21

52

22

23

FacOdon-1 - Feature #4507: Pruebas Feature #4507: Pruebas

Project: FacOdon-1
Status: New
Start date: 12/23/2024
Due date: 12/31/2024
Assignee:
Priority: Normal

24

25

26

27

28

1

29

30

FacOdon-1 - Feature #4344: Implementación Feature #4344: Implementación

Project: FacOdon-1
Status: New
Start date: 10/07/2024
Due date: 12/30/2024
Assignee:
Priority: Normal
FacOdon-1 - Feature #4345: Desarrollo de Front-end Feature #4345: Desarrollo de Front-end

Project: FacOdon-1
Status: New
Start date: 10/07/2024
Due date: 12/30/2024
Assignee: Camilo Valenzuela
Priority: Normal
FacOdon-1 - Feature #4346: Desarrollo de Back-end Feature #4346: Desarrollo de Back-end

Project: FacOdon-1
Status: New
Start date: 10/21/2024
Due date: 12/30/2024
Assignee:
Priority: Normal

31

FacOdon-1 - Feature #4507: Pruebas Feature #4507: Pruebas

Project: FacOdon-1
Status: New
Start date: 12/23/2024
Due date: 12/31/2024
Assignee:
Priority: Normal

1

2

3

4

issue beginning this day issue ending this day issue beginning and ending this day